1. General information
2. Objectives of the intervention
Goals of the intervention
The goals of the project include:
- reconstructing the lake as part of the drainage system of the area, used for collecting, storing and slowing down the flow of the water;
- biodiversity rehabilitation of the lake;
- developing the green area around the lake;
- establishing a recreational area;
- improvement of water quality;
- reducing the bad smell caused by the lake and thus creating a more liveable area. (Reference 1, 3)
- reconstructing the lake as part of the drainage system of the area, used for collecting, storing and slowing down the flow of the water;
- biodiversity rehabilitation of the lake;
- developing the green area around the lake;
- establishing a recreational area;
- improvement of water quality;
- reducing the bad smell caused by the lake and thus creating a more liveable area. (Reference 1, 3)
Quantitative targets
unknown
Monitoring indicators defined
unknown
Sustainability challenge(s) addressed
Habitats and biodiversity conservation: What types of conservation goals are / were defined for the NBS intervention?
Habitats and biodiversity conservation: What activities are implemented to realize the conservation goals and targets?
What types of restoration goals are / were defined for the NBS intervention?
What activities are implemented to realize the restoration goals and targets?
Please specify "other Type of NBS project"
Water management project
Implementation activities
- In 2013, the lake was excavated (10-30 cm deep mud was removed from the lakebed), the existing cleaning engineering structure was renovated and a water cleaning engineering structure was implemented,
the greeneries were cut back and the green infrastructure was improved by planting 13 new trees (Reference 1 and 6)
- in 2014, the walkways were reconstructed (300 m) and new ones were created (300 m), new street light system, 15 benches, 12 trashcans, 30 high flower bed and 3 rose arbours were installed, the fountain that supplies the lake with oxygen was renovated, an interactive design board was set up and aquatic birds were settled in the lake (Reference 2, 3, 9)
- in 2015 the playground was renovated next to the park (Reference 4)
- in 2016 a new engineering structure was installed on the water (Reference 5)
the greeneries were cut back and the green infrastructure was improved by planting 13 new trees (Reference 1 and 6)
- in 2014, the walkways were reconstructed (300 m) and new ones were created (300 m), new street light system, 15 benches, 12 trashcans, 30 high flower bed and 3 rose arbours were installed, the fountain that supplies the lake with oxygen was renovated, an interactive design board was set up and aquatic birds were settled in the lake (Reference 2, 3, 9)
- in 2015 the playground was renovated next to the park (Reference 4)
- in 2016 a new engineering structure was installed on the water (Reference 5)
Type of NBS project
3. NBS domains, ES and scale
4. Governance and financing
5. Innovation
Type of innovation
Please specify technological innovation
The aim of the project was to reconstruct the lake as an element of the rainwater drainage system of the residential complex containing three lakes (for collecting, storing, and slowing the flow of the water) and at the same time establishing a recreational area (Reference 1).
Novelty level of the innovation
Please specify novelty level of the innovation
unknown
Replicability/Transferability
Please specify Replicability/Transferability
unknown

