1. General information
Location and description of the intervention
City or FUA
Iaşi (FUA)
Region
Europe
Native title of the NBS intervention
Parcul Horpaz-Ezăreni
Short description of the intervention
The Horpaz-Ezareni Park is an initiative driven by civil society, requesting the municipality of Miroslava to construct a natural park adjacent to Lake Ezareni. The aim is to protect its green spaces and aquatic bird species while addressing waste management in the area. The petition also called for more green spaces in line with European standards and sought to tackle the challenges of rapid urbanization in peri-urban areas. It collected hundreds of signatures and targeted an area of 20 hectares.
In response, the municipality agreed to the petition and initially proposed creating a park covering 4 hectares in 2022. This first plan was released to the public for consultation. However, the project has since evolved to encompass the original 20 hectares, plus an additional 2 hectares, with an estimated project cost of 11,000,000 euros and a timeline of 3 years for implementation.
The park's design includes various facilities and amenities aimed at enhancing opportunities for recreation, exercise, and relaxation. Accessible paths for pedestrians and cyclists, as well as a parking lot, are also part of the plan. Additionally, two buildings are proposed for sanitary and administrative purposes, which would manage the projected installations of a lighting system, Wi-Fi, and surveillance cameras.
Environmentally, the project includes plans for managing the lake's banks to remove hydrophilic vegetation that could create an unhealthy environment, along with the construction of two bridges. The wilderness areas will be managed, and dendrological plants will be introduced to improve the ecosystem's quality. Overall, the project aims to increase and regenerate green spaces in the commune, enhancing the quality of life for residents and improving the area's aesthetic appeal. (1-8)
Implementation area characterization
Please specify other ecosystem
Lake banks.
Address

Str. Iazului 63
707313 Horpaz
Romania

Area boundary (map-based)
NBS area image
Source of NBS area image
Google maps: https://www.google.com/maps/place/Ez%C4%83reni/@47.114584,27.5351313,3134m/data=!3m1!1e3!4m6!3m5!1s0x40cafa63c50a506d:0x9059248f0250c661!8m2!3d47.1172093!4d27.5400287!16s%2Fg%2F1218r_7w?entry=ttu&g_ep=EgoyMDI0MDkyNS4wIKXMDSoASAFQAw%3D%3D
Total area
225695.00m²
NBS area
188898.00m²
Timeline of intervention
Start date of the intervention (planning process)
2021
Start date of intervention (implementation process)
in planning stage
End date of the intervention
ongoing
Present stage of the intervention
Objectives of the intervention
Goals of the intervention
To address the demands of civil society regarding the necessary increase in green space per inhabitant and natural protection through public consultations.
To protect aquatic bird species that may inhabit or migrate through the specified area by establishing the park as a green corridor.
To manage and reduce waste being discarded in the area.
To fulfill the relaxation, cultural, and educational needs of citizens.
To manage the water along the banks of the lake and enhance its quality.
To improve the overall quality of life for the citizens of the commune and reduce the urbanization process that impacts their access to green spaces.
To enhance the aesthetic image of the commune.
To increase the quality of the natural ecosystem in the implementation area by addressing habitat degradation and enhancing habitat protection for local species (including invasive species removal)
To regenerate unused and abandoned land. (1-8)
Habitats and biodiversity conservation: What types of conservation goals are / were defined for the NBS intervention?
Implementation activities and NBS focus
Implementation activities
1. Designing a natural park and starting the implementation processes in the green area of concern to address the necessities and demands of civil society (4 -8).
2. Planning to introduce dendrological species and to manage the existing wilderness of the area to improve the quality of the natural ecosystem, and remove hydrophilic vegetation that could create an unhealthy environment (4- 8).
3. Design the park to include infrastructure for better accessibility (walking paths, bike trails, a parking lot), playgrounds, a multifunctional area for exercising purposes, stands, benches, and artificial fountains (4 - 6 & 8).
4. Unclogging the shore of the lake to improve its water quality and constructing to bridges on it (6 & 8).
5. Include a rainwater drainage system to enhance the infrastructure of the park (6).
6. Construct two buildings, for sanitary and administrative purposes respectively, to manage the park, its infrastucture and facilities (6 & 8).
7. Publicly disclose the first design of the park for public consultation (4).
NBS domain and interventions
Ecological domain(s) where the NBS intervention(s) is/are implemented
Blue infrastructure
Riverbank/Lakeside greens
Parks and urban forests
Large urban parks or forests
Green corridors and green belts
Services
Expected ecosystem services delivered
Regulating services
Water purification / filtration
Habitat and supporting services
Habitats for species
Cultural services
Recreation
Scale
Spatial scale
Micro-scale: District/neighbourhood level
Beneficiaries
Demographics in implementation area
The district of Horpaz has 4024 inhabitants (10). The entire commune of Miroslava has 28,534 inhabitants, with the agre group comprised of more people being those between 30-39 years of age (22.49%) (11). The age range between 0 and 49 years represents 77.10% (vs. 60%, average across the country) and the 0-9 age group is at a higher level than the national average (16.72% vs 10.4% national) (11). 83,88% are of romanian origin, while for almost all the rest (15%) the information is not available (11). The population of Horpaz has barely any acess to green spaces other than those unmanaged near the lake (12).
Socio-economic profile of the area
Communities vulnerable to environmental hazards or climate change impacts
Unknown
Non-government actors
Non-governmental organisation (NGO) / Civil society / Churches
Primary Beneficiaries
Specify primary beneficiaries
Citizens or community groups: "(...) increased accessibility and the creation of the best conditions for covering the need for relaxation, culture and education of all categories of the population without discrimination" (5).
Marginalized groups
Governance
Governance arrangements
Please specify the roles of the specific government and non-government actor groups involved in the initiative
The civil society group "Horpaz Asociația Civică" started a petition and send a request to the municipality of the commune of Miroslava to protect the green area next to the lake by creating a park (1 -4). An external company prepared a feasibiliy study to implement the park for the municipality (6 - 8). The municipality disclosed the project for public consultation, approved the project and is looking for funding to implement it (4 - 8). Diverse citizens signed the petition and had to possibility to participate in the consultation (1 - 4).
Key actors - initiating organization
Key actors - Other stakeholders involved (besides initiating actors)
Local government/municipality
Citizens or community group
Private sector/corporate actor/company
Level of citizen and community engagement
Uncommon actors ("Missing actors")
Policy drivers
NBS intervention implemented in response to a Regional Directive/Strategy
Yes
Please specify the "Regional Directive/Strategy"
European standard of surface of green space per capita (1 - 3).
NBS intervention implemented in response to a national regulations/strategy/plan
Unknown
NBS intervention implemented in response to a local regulation/strategy/plan
Yes
Please specify the "local regulation/strategy/plan"
Strategia de dezvoltare locală 2021-2027 Miroslava (Strategy of Local Development of Miroslava) (8).
Mandatory or voluntary intervention
Voluntary (spontaneous)
Enablers & Barriers
Please provide details (e.g, name of the plan or strategy) for the selected policies or initiatives.
The civil society group "Horpaz Asociația Civică" started a petition and send a request to the municipality of the commune of Miroslava to protect the green area next to the lake by creating a park (1 - 4)
An external company prepared a feasibiliy study to implement the park for the municipality (6 - 8).
Barriers
Limited financial resources and regulations established by National Environmental Agency that obliged the government of the commune to re-do the feasibility study which slowed down the planning of the park (9).
Financing
Please specify total cost (EUR)
11171069,09 (8).
What is/was the Cost/Budget (EUR) of the NBS or green infrastructure elements?
Unknown.
Source(s) of funding
Type of fund(s) used
Non-financial contribution
Yes
Who provided the non-financial contribution?
Type of non-financial contribution
Co-finance for NBS
No
Entrepreneurship opportunities
Unknown
Business models
Which of the involved actors was motivated by this model?
Impacts, benefits
Description of environmental benefits
-Expected improved water quality: "On the confluence area of ​​the site where the investment will be made with Lake Ezăreni, sanitation, unclogging, clearing and reprofiling of the banks affected by hydrophilic vegetation will be carried out and marshy areas with an unhealthy appearance will be removed" (6).
-Expected increase in protected green space areas: "The signatories request the City Council (CL) to issue a decision for the establishment of a park in the mentioned area, which would represent "the most important step for this area to remain green" (1).
-Expected increased conservation or restoration of ecosystems: "Qualitative enrichment of environmental factors through new surfaces of areas planted with material dendrological quality" (6).
-Expected increased ecological connectivity across regeneration sites and scales: "Moreover, Lake Ezăreni and its shore from Horpaz, is a place where many species of waterfowl live. Its proximity to another wetland, namely the Ciurbești-Bârca Natura 2000 Site, gives it this advantage for the birds that "commute" here or even nest here" (2).
-Expected reduced biodiversity loss: ""Moreover, Lake Ezăreni and its shore from Horpaz, is a place where many species of waterfowl live. Its proximity to another wetland, namely the Ciurbești-Bârca Natura 2000 Site, gives it this advantage for the birds that "commute" here or even nest here" (2).
-Expected increased number of species present: ""Qualitative enrichment of environmental factors through new surfaces of areas planted with material dendrological quality" (6).
Environmental impact indicators
Total area of protected or secured natural areas (in ha)
18,8898
Economic impacts
Description of economic benefits
Unknown.
Description of social and cultural benefits
-Expected improved liveability: "(...) ensure the increase of the quality of life and the attractiveness of the locality both for the local population and and for the residents of Iași" (6).
-Expected improved access to urban green space: "Setting up a network of pedestrian walkways and cycle paths to cover the entire area" (6).
-Achieved increased involvement of locals in the management of green spaces: "Hundreds of people have signed an online petition through which they request the Miroslava City Hall to declare the image area related to the village of Horpaz and the water gloss from Ezăreni a park" (1).
-Expected gain in activities for recreation and exercise: "Setting up a multifunctional area for practicing group sports: football, tennis, volleyball, basket-ball" (6).
-Expected improved mental health: ""The need for green areas is increasingly acute recently. It builds massively and chaotically. Public green spaces are missing in the new peri-urban agglomerations. European Union norms provide for a minimum of 26 square meters per inhabitant of public green spaces" (1).
-Expected protection of natural heritage: "The Horpaz-Ezăreni Park represents the desire of the community of the village of Horpaz for the free area of ​​the image, namely 19.6 hectares and the Ezăreni lake, on its entire surface. We want it to remain a green area" (1).
-Achieved increased appreciation for natural spaces: "They, along with six other citizens concerned about the fate of the image, take their free time to find allies in the community and attract the interest of neighbors from 3 other villages as much as possible. Among their day-to-day responsibilities, they find time to meet with others interested in their cause" (3).
Evidence for use of assessment
Presence of an assessment, evaluation and/or monitoring process
Yes
Actors involved in the assessment, monitoring or evaluation of NBS impacts
Presence of indicators used in reporting
Yes
Presence of monitoring/evaluation reports
No evidence in public records
Availability of a web-based monitoring tool
No evidence in public records
Name of any specific impact assessment tools
Unknown.
Use of GIS in mapping impacts
No
Cost-benefit analysis
No
Justice
Community satisfaction
Description of locals satisfaction with the project
Unknown.
Trade-offs & Negative impacts
Measures to prevent gentrification or displacement
High-quality & Transformative NBS
Multiple impacts delivery (climate, biodiversity, just community)
No
Goal setting and impacts delivery
No, project goals were not set, and benefits were not delivered in all 3 key areas.
Please specify the achievements of the project goals
The project is in its planning stages and there is no mechanism to asses if indeed the original goals have been reached. Nevertheless below are the expected benefits if the original goals are maintained.
Biodiversity goals:
-Expected improved water quality: "On the confluence area of ​​the site where the investment will be made with Lake Ezăreni, sanitation, unclogging, clearing and reprofiling of the banks affected by hydrophilic vegetation will be carried out and marshy areas with an unhealthy appearance will be removed" (6).
-Expected increase in protected green space areas: "The signatories request the City Council (CL) to issue a decision for the establishment of a park in the mentioned area, which would represent "the most important step for this area to remain green" (1).
-Expected increased conservation or restoration of ecosystems: "Qualitative enrichment of environmental factors through new surfaces of areas planted with material dendrological quality" (6).
-Expected increased ecological connectivity across regeneration sites and scales: "Moreover, Lake Ezăreni and its shore from Horpaz, is a place where many species of waterfowl live. Its proximity to another wetland, namely the Ciurbești-Bârca Natura 2000 Site, gives it this advantage for the birds that "commute" here or even nest here" (2).
-Expected reduced biodiversity loss: ""Moreover, Lake Ezăreni and its shore from Horpaz, is a place where many species of waterfowl live. Its proximity to another wetland, namely the Ciurbești-Bârca Natura 2000 Site, gives it this advantage for the birds that "commute" here or even nest here" (2).
-Expected increased number of species present: ""Qualitative enrichment of environmental factors through new surfaces of areas planted with material dendrological quality" (6).
Social justice and community goals:
-Expected improved liveability: "(...) ensure the increase of the quality of life and the attractiveness of the locality both for the local population and and for the residents of Iași" (6).
-Expected improved access to urban green space: "Setting up a network of pedestrian walkways and cycle paths to cover the entire area" (6).
-Achieved increased involvement of locals in the management of green spaces: "Hundreds of people have signed an online petition through which they request the Miroslava City Hall to declare the image area related to the village of Horpaz and the water gloss from Ezăreni a park" (1).
-Expected gain in activities for recreation and exercise: "Setting up a multifunctional area for practicing group sports: football, tennis, volleyball, basket-ball" (6).
-Expected improved mental health: ""The need for green areas is increasingly acute recently. It builds massively and chaotically. Public green spaces are missing in the new peri-urban agglomerations. European Union norms provide for a minimum of 26 square meters per inhabitant of public green spaces" (1).
-Expected protection of natural heritage: "The Horpaz-Ezăreni Park represents the desire of the community of the village of Horpaz for the free area of ​​the image, namely 19.6 hectares and the Ezăreni lake, on its entire surface. We want it to remain a green area" (1).
-Achieved increased appreciation for natural spaces: "They, along with six other citizens concerned about the fate of the image, take their free time to find allies in the community and attract the interest of neighbors from 3 other villages as much as possible. Among their day-to-day responsibilities, they find time to meet with others interested in their cause" (3).
Long-term perspective
Unknown: No information about the project's long-term sustainability.
Cost-effective solutions
No
Equitable impacts
Application of lessons learned
Perception of Environmental Change
Yes
NBS Supports ecological or environmental anxiety
Unknown
References
1.
Elena Mihat (2021). Demers civic_ Sute de oameni solicită înființarea Parcului Horpaz - Ezăreni ». APIX , Accessed on August 30, 2024, [Source link] [Archive];
2.
Horpaz Asociația Civică (n.d.). Parcul Horpaz-Ezareni, petite publice pentru infiintare. PetiteOnline, Accessed on August 30, 2024, [Source link] [Archive];
3.
CeRe (2022). Vrem ca autoritățile publice să ne audă, iar Parcul Horpaz-Ezăreni să devină realitate _ CeRe. Accessed on August 30, 2024, [Source link] [Archive];
4.
Alex Andrei (2023). VIDEO_FOTO Cum va arăta parcul din Horpaz_ proiectul este lansat în dezbatere publică ». APIX, Accessed on August 30, 2024, [Source link] [Archive];
5.
George Matei (2024). Peste 10 milioane euro vor fi investiti pentru amenajarea unui parc de mari dimensiuni la marginea Iasului. APIX , Accessed on August 30, 2024, [Source link] [Archive];
6.
S.C. KALANS CONCEPT S.R.L. (2023). Parc-Horpaz_Memoriu-Tehnic-General _. Primaria Comunei Miroslava , Accessed on August 30, 2024, [Source link] [Archive];
7.
Primaria Comunei Miroslava (2023 ). Proiectul de hotorare studului de fezabilitate n.5/2023. Accessed on August 30, 2024, [Source link] [Archive];
8.
Primaria Comuna Miroslava (2024). Hotorarea pentru aprobarea studiu de fezabulitate si a indicatorilor tehnico-economici Parc de Agrement si Spatiu Verde in Satul Horpaz . Accessed on August 30, 2024, [Source link] [Archive];
9.
Nastas Sabina (2023 ). Valoarea actualizată a parcului de agrement din zona lacului Ezăreni din comuna Miroslava este de aproximativ 6 milioane de euro. Moldova Invest , Accessed on September 2, 2024, [Source link] [Archive];
10.
Populatia Ro (n.d.). Populație Horpaz, Comuna Miroslava, Județul Iași - Populația.ro. Accessed on September 2, 2024, [Source link] [Archive];
11.
Populatia Ro (n.d.). Populația Comunei Miroslava, Jud. Iași - 2023 _ Populatia.ro. Accessed on September 2, 2024, [Source link] [Archive];
12.
Harta Blocuri (n.d.). Hartă blocuri Horpaz. Accessed on September 2, 2024, [Source link] [Archive];
Comments and notes
Comments
Evidence for use of assessments I changed to yes for assesment of impacts because there is the feasibility study developed by the consulting company.
Public Images
Image
3D model of the design of the park
3D model of the design of the park
https://apix.ro/peste-10-milioane-euro-vor-fi-investiti-pentru-amenajarea-unui-parc-de-mari-dimensiuni-la-marginea-iasului/
Image
3D Model of the desing of the park
3D Model of the desing of the park
https://apix.ro/peste-10-milioane-euro-vor-fi-investiti-pentru-amenajarea-unui-parc-de-mari-dimensiuni-la-marginea-iasului/
Image
Parc1
Parc1
https://apix.ro/peste-10-milioane-euro-vor-fi-investiti-pentru-amenajarea-unui-parc-de-mari-dimensiuni-la-marginea-iasului/
Image
Parc1
Parc1
https://apix.ro/peste-10-milioane-euro-vor-fi-investiti-pentru-amenajarea-unui-parc-de-mari-dimensiuni-la-marginea-iasului/