1. General information
2. Objectives of the intervention
Goals of the intervention
1) Improve the connections between the station of Alcântara-Mar and Alcântara-Terra, assigning João de Oliveira Miguéns Street to the pedestrian movement and creating a green and cycling corridor;
2) increase the leisure areas and improving the safety in the pedestrian crossing to the Alcântara-terra station;
3) Improve storm drainage network, optimizing runoff capacity, reducing flood risks. (1)
4) To allow an articulated phased intervention and to ensure that pedestrian circulation is improved at all stages, with bigger and more comfortable sidewalks in order to increase the pedestrian path;
5) Create public spaces, green areas and gardens, and playground;
6) Adopt cycling lanes for children or pedestrian areas where children can ride a tricycle and/or bicycle without danger; (2)
2) increase the leisure areas and improving the safety in the pedestrian crossing to the Alcântara-terra station;
3) Improve storm drainage network, optimizing runoff capacity, reducing flood risks. (1)
4) To allow an articulated phased intervention and to ensure that pedestrian circulation is improved at all stages, with bigger and more comfortable sidewalks in order to increase the pedestrian path;
5) Create public spaces, green areas and gardens, and playground;
6) Adopt cycling lanes for children or pedestrian areas where children can ride a tricycle and/or bicycle without danger; (2)
Quantitative targets
Serve as a green space for the approx. 14,000 residents of Alcantara (3)
Monitoring indicators defined
No of people using the green space (3)
Sustainability challenge(s) addressed
Implementation activities
Articulate the intervention on Rua Prior do Crato with the future roundabout of Alcântara; Pedonize the side of the street João de Oliveira Miguéns; To allow a phased intervention articulated and that ensures in the various stages to improve pedestrian circulation; Extend the intervention ruling this place the parking, and requalifying the pedestrian crossing of the station; (1)
Type of NBS project
3. NBS domains, ES and scale
4. Governance and financing
5. Innovation
Type of innovation
Novelty level of the innovation
Please specify novelty level of the innovation
Part of the initiative Uma Praça em Cada Bairro which implemented multiple square renovation projects across the city (ref.2)
Replicability/Transferability
Please specify Replicability/Transferability
Unknown

