Rehabilitation of Rinia Park

Rinia Park has been a significant social and recreational area in the center of Tirana since the 1950s. Over the years, it has undergone several phases of development and restructuring, each linked to the socio-political regime of the time (Ref. 1). Its most recent rehabilitation was driven by the need to revitalize public spaces and improve the quality and accessibility of urban green areas. In 2019, extensive work on enhancing the park’s infrastructure and amenities began. By June 2020, installations were completed, including new and diverse playgrounds for children, improved lighting and drainage systems, expanded walking paths as well as designated chess and dog areas (Ref. 1,2,6). Both children and the elderly benefit from these new features, which promote social interaction and make the park more inclusive for different age groups (Ref. 2).
To protect the Independence Monument from vandalism, a surrounding water feature was added. An additional benefit of the the new lighting installation is the extended access of the park well into the evening (Ref. 1,6).
Given the park’s profound history, it stands as a symbol of urban renewal and continues to serve as a central gathering spot for people and cultural events (Ref. 7).

Green Corridor "Lazaro Cardenas" in New Belgrade

Named after the former Mexican president Lázaro Cárdenas, this green corridor project stretches over 4,5 km throughout one of the most densely populated areas in Belgrade. It was first built in the 1970s, connecting the building blocks 45, 44 and 70 of Novi Beograd, but has deteriorated since then (Ref. 4,9). Given the fact that close to 40.000 people live in the area which its highly vulnerable to climate change, action was taken to fully reconstruct the corridor for the benefit of local and surrounding residents (Ref. 3,4).
The project was implemented in three phases, according to the three blocks adjacent to the construction site starting in 2019. During the third implementation phase in 2022, however, major delays occurred due to disagreements with the local neighbourhood association "Common Action Block 70 and 70a", which demanded to be taken into consideration in the project's design (Ref. 2,5). Despite some cooperation between the responsible authority (Greenery Belgrade) and the association, demands could not be met (Ref. 5). In the end, the project was carried out as originally planned by the authorities, with a delay of approximately one year. Ultimately, the green corridor provides ample amenities for sports (bicycle lanes, basketball courts, playgrounds, etc.) and recreational activities (benches, chess area) as well as low-barrier infrastructure for all age groups (Ref. 9).
The project was initiated by President Aleksandar Vučić and supported by the current mayor of Belgrade, Šapić, who both have roots in the district (Ref. 4,6).