Zorrotzaurre new flood proof district
Zorrotzaurre is an artificial peninsula located within the Deusto district of Bilbao, Spain. It was formed during the 1950s and the 1960s, when a canal was built to facilitate navigation in the estuary of Bilbao. The Zorrotzaurre project is the latest major urban renewal project to commence in Bilbao. It is an integral and sustainable plan that recuperates a currently derelict site to convert it into a new quarter, and which also includes a flood protection system with water tanks to retain water and a flood protection barrier (Ref 1)
Urban Orchards of Mallorca
The government of Mallorca promotes orchards, as part of an ecological movement in Spain. As a result, five orchards were constructed, reclaiming abandoned urban spaces by the Mallorca city government in 2010.
The project has three pillars: strengthening social cohesion and inclusion, creating opportunities for education and for recreation. They were also constructed with pensioners in mind (Ref 2).
There would be an annual draw to give to distribute the orchards. However, this got delayed since 2013. In 2019, the municipality took back the property from the previous owners, and one of the orchards was taken from the list of orchards due to its bad conditions (Ref 5). In 2020, there was going to be a new draw for the distribution of orchards with new focus groups requirements but due to Covid19, this project has been paused (Ref 5).
The project has three pillars: strengthening social cohesion and inclusion, creating opportunities for education and for recreation. They were also constructed with pensioners in mind (Ref 2).
There would be an annual draw to give to distribute the orchards. However, this got delayed since 2013. In 2019, the municipality took back the property from the previous owners, and one of the orchards was taken from the list of orchards due to its bad conditions (Ref 5). In 2020, there was going to be a new draw for the distribution of orchards with new focus groups requirements but due to Covid19, this project has been paused (Ref 5).
Urban Forest
The Urban Forest project represents an increase of urban trees in the city. There will be two phases of this project. In the first, it consists of a transformation of an eye-sore and abandoned space, around previous Canodrome, into a large urban forest (Ref 1, 9). The second one will be located in the land of the velodrome of Es Tirador. This projec has been delaid due to unforeseen costs (Ref 10).
Horsea Island Country park
The former Paulsgrove landfill is being developed into the Horsea Island Country Park to address the deficit of public open space for Portsmouth’s residents (3). The council plans to put in place a number of initiatives to make sure the country park is a recreational facility and attracts a diverse range of wildlife. This is being progressed through the PUSH Green Infrastructure Implementation Plan. (1). Veolia, the company that operated the landfill site on Horsea Island has the responsibility for implementing the landscape proposals which include tree planting, grass areas, wildflower meadows, footpaths and cycle routes. (2).
Coastal Defences - Milton Common
Milton Common is the second stage of the multi-million-pound Flooding and Coastal Erosion Risk Management scheme being developed across the north of Portsea Island, from Mountbatten Centre round to Milton Common. The overall project will reduce the risk of coastal flooding and erosion and provide the critical infrastructure the city will need over the next 100 years (6).
As the second phase, Milton Common included the instalment of a new rock revetment as a plans defence, the creation of a coastal path and three new earth bunds with new footpaths (6). The work has also included the demolition of Great Salterns Quay and restoration of the natural mudflat habitat (2,4).
The fully completed scheme will significantly reduce the risk of coastal flooding to Milton Common and the local area over the next 100 years; it will offer protection against a 1 in 500-year flood event providing one of the highest standards of flood protection in the UK outside of London (6).
As the second phase, Milton Common included the instalment of a new rock revetment as a plans defence, the creation of a coastal path and three new earth bunds with new footpaths (6). The work has also included the demolition of Great Salterns Quay and restoration of the natural mudflat habitat (2,4).
The fully completed scheme will significantly reduce the risk of coastal flooding to Milton Common and the local area over the next 100 years; it will offer protection against a 1 in 500-year flood event providing one of the highest standards of flood protection in the UK outside of London (6).
Solent Seagrass Project
This project is studying seagrass to learn more about the distribution and health of seagrass in the waters of the Solent. By learning about where seagrass exists it can be better protected. The Wildlife Trust have been visiting local seagrass sites including the harbour in Portsmouth (1). Measures that can be employed to help protect Zostera beds include Boat mooring management - a program of awareness to relieve pressure on seagrass in areas of high boating activity, such as the Solent (3) and restoration through seeding or transplanting seagrass and Improving habitat conditions to encourage natural regeneration and colonisation (3).
Intercultural Garden Nuremberg Langwasser e.V.
Intercultural Garden Nuremberg Langwasser e.V. is a community garden project aimed at sustainable urban development and tolerance between different social and cultural groups. People of different origins work together on their own plots (about 25 m² each), without a fences between neighbouring plots and consciously in interaction through horticulture and other activities. All the grounds are used as vegetable and flower gardens. Environmentally friendly production is desired and promoted (1). Other opportunities offered in the garden are intercultural activities and self-designed educational work. (10) The association actively promotes integration through social activities, which, as stated by the association “can include things like providing German lessons, organizing small festivals and even settling of a dispute happened once”. (7)
Malecon Botanical Garden Recovery
There have been different activities throughout the time to recover and improve the Malecon Botanical Garden. In 2012, the main activity was to recover the Malecon Botanical Garden by introducing a collection of Mediterranean species and of other ethnobotanicals plants and delivering some other environmental services to the location (Ref 1). In 2019, there were different works to rehabilitate the Garden for the September Fair, and also some other plans to create a cultural and artistic space within the Garden (Ref 10 and 11).
The project has completed its first stage, but there is an ongoing number of initiatives to rehabilitate and improve the garden (Ref 9 and 10).
Regarding the status of the project, the first stage has been completed, but an ongoing initiative to rehabilitate and improve the garden is taking place (Ref 9 and 10).
The project has completed its first stage, but there is an ongoing number of initiatives to rehabilitate and improve the garden (Ref 9 and 10).
Regarding the status of the project, the first stage has been completed, but an ongoing initiative to rehabilitate and improve the garden is taking place (Ref 9 and 10).
Forest of Bere (Portsdown Hill) Green Infrastructure
Forest of Bere has been identified as one of the key project areas of the Partnership for Urban South Hampshire (PUSH) Green Infrastructure Strategy. The goal is to allow urban populations of south Hampshire to have better access to quality green space. (1) Part of the forest, called Portsdown Hill, is a Site of Special Scientific Interest (SSSI) is on the boundary of urban Portsmouth and supports extensive areas of calcareous grassland where a wide diversity of typical chalk grassland plants and insects can be found. The last twenty years have seen extensive areas of scrub being removed and restored to open grassland. The project aims to restore the once flourishing natural habitat of the forest while providing more recreational opportunities to the growing number of residents in the surrounding areas, was well as improving the ecological connectivity of separate woodlands (1,2,4,5).
Blue-Green Infrastructure in Neighborhood
The project aims to completely redevelop ‘Rozemaai’, a neighborhood in Antwerp, focusing on climate change adaptation, green spaces, and recreation. This includes a sustainable drainage system in which storm water flows via swales into a water stream with nature-friendly river banks, trees and bushes in the neighborhood, green parking lots, allotments and recreational facilities such as picnic tables (Ref. 1, 2, 3, 4, 5). Since 2019, the district has had a new, accessible park in which the Donkse brook plays a leading role (Ref. 7).

