Displaying 151 - 160 of 342

Constructed Wetland

Wetlands provide a varying degree of treatment of discharged water and are ideally suited for the containment and treatment of polluted water runoff, being a holistic example of Sustainable Drainage Systems (SuDS). The Dublin Local Authority installed an Integrated Constructed Wetland to treat polluted water discharged from the urban area, with the aim of cleaning urban runoff and drainage water. It was meant to purify water that discharges into a pond, and later on into the Tolka river. The project has been very successful in treating polluted water effectively, according to studies. (Ref. 1; Ref. 3)

Nature conservation area Eskesberg on former landfill

From 1850 to 1956 the area Eskesberg was a limestone mine, after that up until 1972 it served as a landfill. When taken over by the city of Wuppertal, groundwater contamination and outgassing required a large remediation to remove toxic substances and recover the area according to nature conservation guidelines. (Ref. 8) Since 2005, it has been turned into a nature conservation area covering 8.5 ha where several rare plants and animals have resettled and thus the area also serves as an important recreational space for residents (Ref. 1, 2, and 3). The project was initiated by the local government, who also collaborate with different partners for maintaining the nature conservation area, such as the biological station, which organizes excursions, performs monitoring on the terrain and sets up bee hives. Also, residents apart from visiting the area can actively participate in its maintenance as volunteers, guided by the city of Wuppertal and the NGO Biologische Station Mittlere Wupper. Furthermore, the nature conservation association of Wuppertal and scientists from the university of Cologne are involved in the intervention by conducting research on the terrain (Ref. 1, 2, 3 and 6).

Dee Park Regeneration project

The Dee Park Regeneration Project aims to rebuild the 1,100 homes from the 1960s-built estate, that has been worked on in close consultation with the community. The estate is one of the 20 per cent most deprived areas in the country. The vision for the regeneration project is to create “a safe, inclusive and sustainable community, economically, environmentally and socially, as part of the wider Reading, where people want to live and work, and which will inspire a sense of pride”. The third and final phase of the project is ongoing and is expected to be completed soon. (Ref. 1, 4, 8, 9)

Commercial park with protected area

On the territory of the former train station Vohwinkel (including the train tracks) a brownfield site of 15 ha was turned into a commercial urban area which was created as an economic driver for Wuppertal. However, the site was inhabited by the highly endangered sand lizard, which is why a species conservation island was created as the commercial park was being built. As a habitat of the endangered sand lizard species, the conservation area in the South-West of the commercial park remained free from construction development, and an adequate conservation concept was elaborated and implemented. The nature conservation area is maintained by the environmental protection department of the city. (Ref. 1 and 6). The project succeeded in its goal of creating a commercial area on the former Vohwinkel marshalling yard while simultaneously paying attention to the protection of the endangered sand lizard. (Ref. 2) Additionally to the conservation area within and around the commercial zone, lizards have also been relocated beyond the city limits as a biodiversity offsetting measure. (Ref. 8) Furthermore, the dried out Krutscheider stream, forming part of an important biotope system with its gravel surfaces, was dug out again to serve as a green corridor for compensation against the habitat loss. (Ref. 1, 4 and 6)

Woodland project

Woodland project is a council project to improve woodlands. During the last 50 years, “lifestyles have changed, leading to a change in the state of the woods”. The result is that the trees are ageing, becoming overgrown with dominant species and losing their wildlife. The woodlands in Reading need work to protect them (for future generations) and the council has therefore produced a Woodland Management Plan in partnership with the Forestry Commission. The plan aims to manage 18 sites of woodland in Reading and implementation of these plans will involve benefits for e.g. the wildlife and community. (Ref. 1, 2, 4)

Bay at Norikus

New recreation zone "Norikus Bay" in Nurenberg was completed in 2018 on the south bank of the Wöhrder lake, an artificial lake created in 1968 to protect the city from flooding. The dam itself, which is a 400m long path separating a part of the water surface from the bigger part of the lake, has become a tourist attraction with a water playground and other recreational amenities being offered. The water is naturally cleaned through the regeneration zone with natural plant filter, and simultaneously improves the habitat of fish and makes recreational swimming in possible in the cleaner water. New green areas are organized on the shore in order to improve environmental, aesthetic and recreational conditions of the area (1, 7, 8).

View Island conservation project

View Island in Reading is a relaxing island with natural open space with grassy paths and seating near to the weir at Caversham Lock. A conservation project has been carried out to e.g. improve water flow, improve biodiversity, and improve the entrance to and around the island. The work has been carried out in consultation with Reading Borough Council, the Environment Agency and has been designed and constructed by Riverworks Ltd. (Ref, 1, 2, 3)

Tree planting scheme

Since introducing the Tree Strategy, the Reading Council has working closely with partners and local people to promote the importance and benefit of trees. Work has included a (street) tree planting scheme. Reading has a committed Tree Warden Network (which has the objectives to e.g. engage the community and raise awareness of trees in neighbourhoods). (Ref. 1, 2)

Renaturalization of the Wupper stream in Wuppertal

From 2006 onwards, the urban stream Wupper and its riverbanks were redeveloped and ecologically improved via several water management and planning measures across the city of Wuppertal. Initiated by the city administration and the public sector company Wupper, they aimed at improving the environmental- and water quality or the area and enhancing biodiversity in and around the Wupper. These efforts were accompanied by additional citizens' initiatives with the same goal. (Ref. 1, 2, 3, 9). According to the EU Water Framework Directive, 27 percent of the Wupper and its tributaries are now in good condition, which is well above the German average of 8 percent. The complete renaturalization is planned to be completed by 2025. (Ref. 12)

Water Vole Recovery Project

The Berkshire, Buckinghamshire and Oxfordshire Wildlife Trust (BBOWT) 'Water Vole Recovery Project' is working in partnership with the Environment Agency, the Canal & River Trust and Thames Water to monitor water voles. Water voles have undergone one of the most serious declines of any wild mammal in Britain during the 20th century. The intensification of agriculture in the 1940s and 1950s caused the loss and degradation of habitat, but the most rapid period of decline was during the 1980s and 1990s as American mink spread. Between 1989 and 1998, the population fell by almost 90 percent! The above project also is identifying habitat enhancement opportunities and influencing local landowners to manage sites sympathetically for water voles and implement mink control. (Ref. 1)