Displaying 281 - 290 of 343

Wigan Flashes Wetland Restoration

Wigan Flashes Project is encouraging natural re-colonisation to a site of very high conservation value and an enormous asset for recreation for the local community. The Wigan Flashes are a group of eight shallow wetlands, formed originally as a result of mining subsidence, which extend south from near Wigan's town centre. Over time, the industrial landscape has evolved in to a mixture of open water, reedbed, mossland, willow carr and fenland (ref 1).

Salford Second Basin

The city of Salford has experienced several floods and is at risk of flooding once every 100 years (Ref1). The majority of properties in the city that lie in a high-risk flood zone are in the floodplain of the Irwell. The UK's Environment Agency and the council, designed a flood prevention scheme which included temporary water storage areas which will store floodwater on the existing Castle Irwell playing fields and public open space, and double as sports area otherwise (Ref 5). It aimed to have its own wetland and wildlife habitat, and will help protect hundreds of homes and businesses (Ref 4).

Restoration of River Medlock

The Environment Agency, Manchester City Council and the Irwell Rivers Trust had undertaken works to renaturalise a section of the River Medlock running through Manchester. The project had sought to return the river to its natural state by widening the channel and replacing the Victorian brick lining with gravel that provides a more natural-looking and fish-friendly section of the river and reduces flood risk at the same time (ref. 3). The project was also being seen as an EU exemplar of how to go about restoring an urban river (ref. 1, ref. 7).

Revealing the Roch project

The Revealing the Roch project uncovered two sections of the River Roch to expose a historic bridge which had been hidden for over 100 years (ref 1). Re-opening and deculverting the River Roch and bridge has a tangible benefit by reducing flood risk for the town (ref 4). The scheme, which is a key part of Rochdale town centre’s ongoing regeneration programme will help reduce flood risk in the town center and create educational opportunities. The project also includes enhancing the natural heritage of the river by introducing features that encourage river vegetation and creatures to re-establish themselves (ref 5). The project has since led to a wildlife boost, with brown trout, bullhead fish, heron and kingfishers all being seen since construction work to open the river began. (Ref 3). As the River Roch connects to River Mersey which empties into the North Atlantic ocean, this intervention addresses marine ecosystem restoration as well.

NIA Dearne Valley Green Heart & Eco-vision

Coal mining in the Dearne Valley damaged the Dearne Valley landscape. To address these problems the Dearne Valley Green Heart partnership was formed in 2006, but the intervention discussed here is specifically related to the developments between 2012 and 2015, when it was founded as a Nature Improvement Area. It is part of the South Yorkshire Delivery Programme and part of the Doncaster Council as also being part of the Doncaster Green Infrastructure Strategy (Ref 1, 2).

The Carbon Landscape

The Carbon Landscape is a pioneering project in landscape restoration in Wigan, Warrington and Salford. Led by the Lancashire Wildlife Trust, it will revitalize a landscape left devastated by decades of coal-mining and peat extraction (Ref 5). It works to restore key habitats and reconnect local people with their unique natural heritage, preserving it for future generations. The restoration of the peat base to lowland raised bog provided an opportunity for carbon sequestration and storage (Ref 1). There is a strong vision to reconnect local people with their rich natural heritage, creating opportunities and a sense of pride in the local area (Ref 4).

Cleavleys Wet Woodland renaturalisation

City of Trees is an innovative movement set to re-invigorate Greater Manchester’s landscape by transforming underused woodland and planting a tree for every person who lives there (ref 1). Manchester City of Trees had undertaken work to improve water quality of a tributary of Worsley Brook through channel naturalisation and create wet woodland in the Cleavleys Nursery. The discharge from the tributary caused water quality failures in Worsley Brook under the Water Framework Directive (WFD) (Ref 3). This project allowed the stream to take a more natural course through the woodland and the waterlogged woods provide habitats to species and remedy these water quality issues (Ref 3).

Warwickshire Avon Catchment Partnership

The catchment includes the River Avon (a major resource for recreational activities and public water supply) and its various tributaries. Coventry is the largest urban area in the catchment, and the catchment has a high value for wildlife. (Ref. 1)
Main priorities include engaging communities to take ownership of their local water environment, reducing urban and rural pollution; delivering enhancement projects in the 3 Priority Areas (e.g. Coventry Brooks) and Returning water corridors to a near-natural state. (Ref. 2). The Catchment Based Approach (CaBA) is a Government policy framework that empowers local action to improve the water environment through community partnerships. A renewed focus on the catchment-based approach has led to Catchment Partnerships (i.e. The Warwickshire Avon Catchment Partnership) being set up to drive local delivery of these projects. (Ref. 3)

River Restoration on the Guphill Brook

Warwickshire Wildlife Trust has completed an urban river restoration on the Guphill Brook that aims to restore the brook's natural features and enhance the surrounding habitat. "The project [is expected to] bring multiple benefits to diminishing wildlife and deprived local communities but also importantly to flood risk reduction, which is becoming ever more important with the increased negative effects of climate change." (Ref. 1)

Reconstruction of Park Lužánky

Park Lužánky underwent extensive reconstruction between 1991-2012 through five phases (Ref 2) to restore a recreational hub of the city's largest park through ecologically sound design (Ref. 1; Ref. 2). Each phase worked restored different sections of the park. This included modification of green areas, landscaping (treatment of trees, planting new trees and perennial plants, restoration of grasslands), building a children's playground, a fitness park, and an artificial water element that imitates the former stream of the river Ponávka. (Ref. 1).