Displaying 1 - 10 of 38

Bayou La Batre Green Stormwater Project

Bayou La Batre, also known as the seafood capital of Alabama, has been facing severe flooding problems, including the occurence of combined sewerage overflows. The Nature Conservancy has secured funding to install a green stormwater project in Bayou La Batre, adjacent to the library, sports fields and the community center. Alongside the aim of the green stormwater project to decrease flooding events in the community by infiltrating water, it also serves as an education and engagement project [1]

Liberties Greening Strategy

The Liberties is one of the most recognizable urban areas in Dublin and Ireland, strongly associated with old Dublin, working-class communities, and the brewing and distilling industries. While rich in history, cultural significance, and local stories, The Liberties faces numerous placemaking and quality-of-life challenges. The area continues to experience significant dereliction, a fragmented urban fabric, and a shortage of high-quality green spaces. For instance, tree coverage in The Liberties is sparse, with good-quality street trees only found in a few small areas, such as Gray St. and Reginald St., along the South Quays, Cornmarket, and near the fountain on James St. The area has approximately 1,200 trees, amounting to less than 5% canopy coverage.
In response to these challenges, Dublin City Council enacted The Liberties Greening Strategy in 2015. Building on the Liberties' Local Area Plan, this strategy aims to develop a network of new urban parks, improve access to heritage green spaces, and refurbish existing parks and play areas. It addresses multiple goals, including ecological connectivity, water management, flood risk reduction, air quality improvement, social cohesion, environmental education, and public health. This strategy is an initiative of the Parks and Landscape Services Division of Dublin City Council, in collaboration with the South Central Area Office and with input from Áit Urbanism + Landscape and Mary Tubridy & Associates.
Since its implementation in 2015, the strategy has resulted in the development of two new community parks, enhancements to several green spaces, and the greening of public spaces. It has also introduced measures to support food production in community gardens and allotments, revitalize ecosystems, strengthen water management, improve air quality, boost carbon sequestration through tree planting, divert water from the local sewer network, prevent flooding, and regulate heat. (1, 2, 3)

River Dodder Rainscapes

Pollution from roadways is often carried by rainwater into gullies, which then direct this runoff to the nearest watercourse, ultimately polluting local rivers and degrading water quality (1). To address this issue, Dublin City Council is exploring potential green infrastructure solutions to reduce roadway pollution in rivers, focusing on nine pilot sites within the Dodder catchment area (1). Green infrastructure has the advantage of treating pollutants before they enter rivers or watercourses, which can significantly improve water quality in the area (1).
In addition to enhancing water quality, green infrastructure helps manage flood risks by slowing water flow to rivers, which can lessen the frequency and severity of flood events (1). These green spaces also foster biodiversity, creating more pleasant and ecologically supportive environments for the community (1). As an added benefit, green infrastructure serves as an important climate change adaptation strategy (1).
Upon completion of these pilots, Dublin City Council plans to expand successful methods to other locations across the city and potentially further afield (1). The project will involve creating new green spaces, enhancing existing ones, and transforming certain hard surfaces, all of which will contribute to protecting the Dodder and Santry rivers. By treating roadway runoff before it reaches the rivers, the initiative will also offer valuable benefits to the local community (2).
The proposed changes will be designed to support health and well-being, provide informal play areas, attract desirable wildlife, reduce flood risks, and help urban areas adapt to the impacts of climate change (2). The Council also plans to monitor the performance of these green infrastructure measures to assess their effectiveness in filtering pollutants from roadway runoff (1).

Life Lungs Project

Lisbon is facing an increasing threat linked to climate change due to its geographical location and climate (6), which has had a negative impact on health and quality of life in the city (5). Its average annual precipitation is decreasing, although the city experiences more winter precipitation. This results in longer droughts and more seasonal flooding, which reduces water retention and soil conservation (6). Average temperatures are increasing by 14°C per year, with maximum temperatures up to 5°C higher (6).
As an adaptation measure to these challenges, the LIFE LUNGS project aims to increase Lisbon's resilience by implementing green infrastructure and promoting related ecosystem services (1, 3, 5, 6). Thus, it focuses on measures aimed at coping with temperature increase, mitigating the effects of heat waves and water scarcity, which are expected to become more frequent, being in line with the climate policies adopted by the municipality. The project runs from 2019/2020 to 2024/2025 (1, 5, 6). It aims to address cross-cutting issues such as climate, water and biodiversity (3). The project expects to work hand in hand with the City of Malaga, which has been developing projects aimed at adapting the city to climate change. It is expected to replicate the work in Malaga and post-project to 2 national territories, and 1 in the EU (4). It is also intended to transfer the project work to be implemented in private areas that are part of Lisbon's green infrastructure, and to disseminate and technically train municipalities of the Lisbon Metropolitan Area and other municipalities committed to climate change adaptation (4).

Sacred Grounds St Suzanne Rain Gardens

In 2018, the City of Detroit implemented a drainage charge to help cover the costs of capturing, conveying, pumping, treating, and safely returning combined sewage to the Detroit and Rouge Rivers (1). The charge is calculated based on each parcel’s impact on the sewer system, particularly by measuring impervious acreage (1). Since then, this fee has posed significant challenges for one group in particular: Detroit’s houses of worship (2). Churches, with their large roofs and parking lots, face higher monthly drainage charges, creating financial strain for many faith leaders (2).
To support these institutions, Sacred Grounds has been providing grants, labor, and design assistance to install projects that reduce water bills and drainage fees (2). Sacred Grounds collaborates with the National Wildlife Federation, Friends of the Rouge, and Sierra Club of Michigan to implement these projects through the city’s green credit program (2). A recent initiative involved installing four rain gardens located on the perimeter of St. Suzanne Our Lady Gate of Heaven Church (3). These bioretention gardens, funded by several private and public actors and led by Detroit Future City, diverts water from 20 large downspouts, redirecting an estimated 500,000 gallons of runoff annually away from the municipal sewer system (3, 4).
In addition to managing water, the gardens foster a thriving habitat for pollinators and adds beauty to the area (3). St. Suzanne’s commitment to environmental education includes engaging over 130 youth and adults in training programs that build pathways to STEAM careers and opportunities where local residents are often underrepresented (4). The church also features an innovative, eco-friendly outdoor classroom developed by students, further supporting their sustainability mission (4).

SUDs on Avenida de las Asociaciones de Vecinos

To reduce the risk of urban flooding, the city of Seville, through its metropolitan water company Emasesa, established several "sustainable urban drainage systems". One of the pilot locations is on the Avenida de las Ascociaciones de Vecinos, where a rain garden complemented by an infiltration zone was established. The main aim of the project is to reduce the risk of flooding, but the system can also improve the urban landscape by offering green space, preventing desertification and reducing pollutants carried by runoff [Ref. 1-4]. After implementation, the project was shown to be effective during heavy rain [Ref. 5]. The system can store up to 34 m2 of water and reduce flow rates to the sewage network by 69 % and the total runoff to sewage by 93 % [Ref. 3-5]. The project was initiated and led by Emamesa, while two different companies were employed to design and construct the system [Ref. 1, 2, 6, 7]. The total budget of the project, which also included some renovations of grey infrastructure along the street, was 165000 EUR [Ref. 1].

Far West Detroit Stormwater Improvement Project

The Far West Detroit neighborhood faces significant challenges with its aging infrastructure. The neighborhood’s stormwater and sewer systems are combined into a single system that is only capable of handling a limited volume. During heavy rain events, the system's capacity is exceeded, causing excess stormwater and untreated sewage to overflow into the Rouge River, which negatively impacts the environment (Ref. 1).
Detroit is investing $40 million in a transformative stormwater management system in the Far West neighborhood near Rouge Park. Described by the Detroit Water and Sewerage Department as the largest project of its kind, it will redirect 98 million gallons of rainwater and snowmelt into two new detention basins and a renovated sewer system. The new wastewater system is expected to significantly reduce water volumes in Detroit’s combined sewer system during heavy rainfall and to provide flood relief for approximately 1,200 homes that have experienced flooding in recent years. This expansion, informed by community feedback, marks one of the city's most notable investments in green infrastructure to improve its overextended wastewater management system.
The project has been planned through extensive studies and community coordination since 2016, with construction set to occur in three phases, extending through 2026. Crews broke ground on the South Basin, North Basin, and sewer overhaul in July 2022, and progress is reportedly on track. In addition to the basins, the stormwater management initiative includes neighborhood improvements to enhance recreational opportunities for residents and visitors alike. Planned enhancements in Rouge Park will introduce wetland spaces with native flora, creating greener, more inviting areas in the community for residents to enjoy (Ref. 2).

Clarendon Elementary School Rain Garden

Arizona is experiencing an unprecedented drought, now nearing 15 years and surpassing the most severe drought in over 110 years of recorded history (1). For Phoenix residents, accustomed to extreme heat and minimal rainfall, rising temperatures are bringing new health risks (3). Diminished rainfall not only leads to water scarcity but also raises temperatures, as the sun’s energy, instead of being absorbed to evaporate moisture, intensifies the heat on the ground (2). In 2023 alone, extreme heat claimed at least 147 lives, with Arizona seeing the majority of these fatalities. By early August, over 100 heat-related deaths had been reported in the state (2).
In response to these challenges, the Watershed Management Group (WMG) has collaborated with Arizona State University’s Sustainability Teachers’ Academies to develop a program that maximizes the desert’s limited rainfall to build community resilience (3). Their Schoolyard Water Education Program brings educational services to Phoenix schools, focusing on designing and installing rain gardens as part of outdoor learning initiatives (3). This hands-on approach transforms schoolyards into interactive laboratories where students learn the principles of sustainability through direct engagement with their surroundings (3).
A project at Clarendon Elementary School in Phoenix involved constructing a rain garden with native plants and wood chip mulch to help retain moisture (3). These gardens offer students a living classroom, where they can observe seasonal changes in native plant life, distinguish beneficial species from invasive weeds, and track rainfall to measure the garden’s water intake from rooftops and direct rain (3). Beyond the academic learning, rain gardens provide cooler, safer spaces for students to gather, fostering a lasting connection with nature and a deeper understanding of sustainable water practices (3).

DWSD Fenkell Green Infrastructure

The Fenkell Stormwater Project in the Brightmoor neighborhood of Detroit is an initiative led by the Detroit Water and Sewerage Department (DWSD) to mitigate the impact of heavy rain events on the local sewer system. By transforming 92 Detroit Land Bank Authority (DLBA) parcels into 24 bioretention gardens, the project aims to significantly reduce street flooding and basement backups in the area. These gardens, spread across approximately 50 acres of mostly vacant land, utilize permeable soils and landscaping techniques to absorb excess rainfall, which helps prevent the overloading of the city’s combined sewer system. This is particularly important in reducing combined sewer overflows (CSOs), which occur when the system's capacity is exceeded during heavy rains, leading to untreated stormwater and sewage being discharged into the Rouge River.
The project is expected to manage and treat about nine million gallons of stormwater annually, making a significant impact on both the neighborhood’s infrastructure and the environment. In addition to the bioretention gardens, the project includes the partial removal of Blackstone Street between Keeler and Midland streets to further enhance stormwater management.
Community engagement has been a critical component of the project, with residents of Brightmoor and Minock Park participating in meetings to share their preferences for the types of trees, plantings, and other features. The DWSD will maintain the gardens under its Green Stormwater Infrastructure (GSI) program, which already includes 19 other similar projects across the city. The project is currently in the construction phase and is expected to be completed by the end of 2024, modernizing Brightmoor’s stormwater infrastructure and providing long-term environmental and community benefits.
(Ref.1-3)

Trinity Garden Community Improvements

This series of projects in the Trinity Garden aims to improve sports fields, enhance drainage, and replace HVAC (Heating, Ventilation, and Air Conditioning) systems at the community center in the Trinity Garden community (Ref 1). The first project involves a complete renovation of the playground area at Trinity Gardens Park. The entire playground will be rebuilt with a new drainage system, along with the installation of a new play structure, benches, and trash receptacles (Ref 2). Another key component of the project includes the construction of a new natural baseball/football combo field, with a new infield, bases, outfield fencing, foul poles, and with improved drainage (drain piping, inlets, sodding, and irrigation) for the sports field (Ref 3). On the subject of recreation and public health, Councilman Fred Richardson emphasised the significance of Trinity Park, stating, “Good public parks are key to creating healthy children and, in turn, strong communities. I am so happy that we are able to bring these major improvements so local children will have a great place to come play, and their caregivers will have a place to watch them from” (Ref 2).
Additionally, another major project on the agenda focuses on street and drainage improvements within the community. This will address issues on Warsaw Avenue and Collins Avenue, from Main Street to Jessie Street, aiming to resolve several hazardous open ditches that currently run through the neighborhood (Ref 2).