1. General information
2. Objectives of the intervention
3. NBS domains, ES and scale
4. Governance and financing
5. Evaluation and learning
Presence of an assessment, evaluation and/or monitoring process
Unknown
Presence of indicators used in reporting
No evidence in public records
Presence of monitoring/evaluation reports
No evidence in public records
Availability of a web-based monitoring tool
No evidence in public records
Name of any specific impact assessment tools
Unknown.
Use of GIS in mapping impacts
No evidence in public records
Cost-benefit analysis
Unknown
Community satisfaction
Description of locals satisfaction with the project
Positive: “The previously dilapidated environment has been spectacularly renewed, and now we can go and admire it. The work has just been completed, but it was already clear, even when professionals were still working in certain areas, that visitors "loved" the newly reborn Miskolctapolca even in its unfinished state. The promenades were almost always full, and the brand-new street furniture, benches, and tables were immediately taken over by visitors. Likewise, the lookout and rest terraces built by the Boating Lake quickly became lively and filled with activity.” (Ref.2)
Negative: “The situation is not exactly ideal. Some of the green areas are not sufficiently maintained. In the Őspark, the promenades and paths have a so-called "bonded gravel" surface. Much of this now looks as though it was completed half a decade ago. In several places, the surfaces have already required repairs—patching—which creates noticeable differences between the repaired and original surfaces, making it less aesthetically pleasing. In many areas, the curbs were also not properly finished.” (Ref.5)
Negative: “The situation is not exactly ideal. Some of the green areas are not sufficiently maintained. In the Őspark, the promenades and paths have a so-called "bonded gravel" surface. Much of this now looks as though it was completed half a decade ago. In several places, the surfaces have already required repairs—patching—which creates noticeable differences between the repaired and original surfaces, making it less aesthetically pleasing. In many areas, the curbs were also not properly finished.” (Ref.5)
Trade-offs & Negative impacts
Measures to prevent gentrification or displacement
Multiple impacts delivery (climate, biodiversity, just community)
No
Goal setting and impacts delivery
No, project goals were not set, and benefits were not delivered in all 3 key areas.
Reaching original project goals
Please specify the achievements of the project goals
Biodiversity Goals:
-Improved water quality: “After a long time, the accumulated silt in the bed of the Boating Lake was removed, and the lake's shoreline was reinforced.” (Ref.1)
-Increased green space area: “Approximately 100 trees, 9,000 shrubs, 18,000 perennials, 2,300 annual plants, 350 roses, and 6,600 bulbs were planted in the project area.” (Ref.1)
-Restoration of derelict areas: “With this project the Municipality of Miskolc restored an area that has been decaying for years” (Ref.6)
Social justice and community:
-Improved access to urban green space: “They implemented accessibility walkways and toilets to make the park more available to everyone” (Ref.1)
-Gain in activities for recreation and exercise: “The renovated Kilátó Square not only offers views of the fountain and the lake but also serves as a place for relaxation and refreshment with its benches and drinking fountains.[..] The park is an ideal destination leisurely walks in nature” (Ref.1)
-Increased knowledge of locals about local nature: “In the park, 11 uniquely designed educational trail signs introduce the local attractions: valuable old trees, the park's history and wildlife, as well as the newly planted shrub and perennial species.” (Ref.1)
-Improved water quality: “After a long time, the accumulated silt in the bed of the Boating Lake was removed, and the lake's shoreline was reinforced.” (Ref.1)
-Increased green space area: “Approximately 100 trees, 9,000 shrubs, 18,000 perennials, 2,300 annual plants, 350 roses, and 6,600 bulbs were planted in the project area.” (Ref.1)
-Restoration of derelict areas: “With this project the Municipality of Miskolc restored an area that has been decaying for years” (Ref.6)
Social justice and community:
-Improved access to urban green space: “They implemented accessibility walkways and toilets to make the park more available to everyone” (Ref.1)
-Gain in activities for recreation and exercise: “The renovated Kilátó Square not only offers views of the fountain and the lake but also serves as a place for relaxation and refreshment with its benches and drinking fountains.[..] The park is an ideal destination leisurely walks in nature” (Ref.1)
-Increased knowledge of locals about local nature: “In the park, 11 uniquely designed educational trail signs introduce the local attractions: valuable old trees, the park's history and wildlife, as well as the newly planted shrub and perennial species.” (Ref.1)
Long-term perspective
Yes
Cost-effective solutions
Unknown
Equitable impacts
Transformative capacity
Magnitude of change
Application of lessons learned
Perception of Environmental Change
Unknown
6. Sources
1.
Municipality of Miskolc (2023). Zöld város kialakítása Miskolc-Tapolca akcióterületen. Accessed on September 6, 2024, [Source link] [Archive];
2.
Toth, S. (2024). Látványos: így újult meg Miskolctapolca az elmúlt két-három évben. Accessed on September 6, 2024, [Source link] [Archive];
3.
Szabo, A. (2023). Látványosan megújult Miskolc ősparkja. Magyar Epitok, Accessed on September 6, 2024, [Source link] [Archive];
4.
Helysegnevtar (2023). Miskolc alapadatok. Accessed on September 6, 2024, [Source link] [Archive];
5.
Szaniszlo, B. (2024). Rohamos romlásnak indult az alig egy éve átadott miskolctapolcai park - képekkel. BOON, Accessed on September 6, 2024, [Source link] [Archive];
6.
Municipality of Miskolc (2023). Térkép segíti felfedezni a megújult miskolctapolcai park mini rejtélyeit. Accessed on September 9, 2024, [Source link] [Archive];
7.
Kujan, I. (2023). Elkészült a miskolctapolcai park, még egy utolsó bejárást tartottak a területen. minap, Accessed on September 6, 2024, [Source link] [Archive];
8.
Toth, S. (2023). Friss: így néz ki a teljesen megújult miskolctapolcai park – képek. Borsod24, Accessed on September 9, 2024, [Source link] [Archive];
9.
Municipality of Miskolc (n.d.). A park élővilága. Accessed on September 9, 2024, [Source link] [Archive];
Public Images
Image
The renovated and cleaned Boating Lake
Municipality of Miskolc
Image
Newly installed accessibility pathway with growing flowers on its sides
Municipality of Miskolc
Image
A squirrel at the Miskolctapolca Park
Municipality of Miskolc
Image
Tapolca Park
https://borsod24.hu/2023/07/09/friss-igy-nez-ki-a-teljesen-megujult-miskolctapolcai-park-kepek/
Image
Tapolca park
https://www.miskolc.hu/varoshaza/onkormanyzat/palyazatok/onkormanyzat-altal-elnyert-palyazatok/zold-varos-kialakitasa/zold-varos-kialakitasa-miskolc-tapolca
Image
Tapolca Park
https://borsod24.hu/2023/07/09/friss-igy-nez-ki-a-teljesen-megujult-miskolctapolcai-park-kepek/
Image
Tapolca Park
https://borsod24.hu/2023/07/09/friss-igy-nez-ki-a-teljesen-megujult-miskolctapolcai-park-kepek/
Image
Tapolca Park
https://borsod24.hu/2023/07/09/friss-igy-nez-ki-a-teljesen-megujult-miskolctapolcai-park-kepek/
Image
Tapolca Park
https://borsod24.hu/2023/07/09/friss-igy-nez-ki-a-teljesen-megujult-miskolctapolcai-park-kepek/
Image
Tapolca Park
https://borsod24.hu/2023/07/09/friss-igy-nez-ki-a-teljesen-megujult-miskolctapolcai-park-kepek/
Image
Tapolca Park
https://borsod24.hu/2023/07/09/friss-igy-nez-ki-a-teljesen-megujult-miskolctapolcai-park-kepek/