Displaying 51 - 60 of 190

Storm Water Management Program Plan

The City of Mobile has developed and implemented a Storm Water Management Program (SWMP) as required by the regulations of the Environmental Protection Agency (Ref 1). Flooding is a significant issue in Mobile, occurring frequently throughout the town (Ref 3). The SWMP aims to protect water quality and prevent harmful pollutants in stormwater runoff from entering the Municipal Separate Storm Sewer System (MS4) area (Ref 1). Stormwater runoff refers to rainfall that does not seep into the ground but instead flows over yards, streets, parking lots, and buildings, eventually entering the storm sewer system, which directs it into creeks, rivers, bays, and the Gulf of Mexico (Ref 1). Stormwater can collect pollutants such as trash, debris, sediment, heavy metals, oils, and hazardous household materials. Additionally, development increases impervious surfaces, leading to more stormwater runoff (Ref 2).

Planting the Future and Cultivating Life

The project ‘Planting the Future and Cultivating Life’ aims to create an ecological corridor in the city by reforesting an area of 28 hectares, under the direction of the Porto Velho City Council. It encourages citizen participation in tree planting activities or the management of green areas. To this end, the municipality is carrying out tree planting programmes in parks, squares and along public roads, encouraging citizens to get involved in this endeavour by actively participating in tree planting actions, caring for trees already on their property or raising awareness of the importance of these actions. (1) They seek to involve organisations such as schools, colleges, companies, associations and public organisations to increase the community's and young people's interest in responsible practices and positive attitudes to value and preserve the environment (1).
To achieve this goal, the Porto Velho city council organised a tree-planting day on October 23rd 2023, where 31,000 tree seedlings of native and fruit trees were planted in the Park Passarela Espaço Alternativo (1, 7). This was done with the support of the Municipal Secretariat of Environment and Development (1). This activity is part of the project Virada Ambiental, which seeks to promote the planting of native trees in municipalities across the country, raising awareness of the importance of planting native species and training municipal civil servants and the general public (3, 5). The National Confederation of Municipalities also supports this project and aims to mobilise society to encourage the planting of native trees to rescue biodiversity and recover environmental services, favouring social welfare by promoting tourism, and outdoor sports activities (6), providing shade, protecting the soil and combating high temperatures (2).

Montgérald Peri-urban Forest Conservation

The riparian forest of Montgérald, through which the “Monsieur” River flows, is located within Fort-de-France and boasts rich biodiversity, featuring around 100 species of shrubs and trees and about 30 animal species, including 16 types of birds. It is one of the last remnants of the mesophilic forest type and the only example in a French peri-urban setting. This unique ecosystem is recognized as a Natural Area of Ecological, Faunal, and Floral Interest (ZNIEFF) and a Classified Wooded Area (EBC), underscoring the need for conservation efforts.
Covering nearly 21 hectares, this site offers ecological benefits like air quality improvement and temperature regulation, providing a "fresh air island" near the city center. However, it faces significant challenges, including flooding caused by climate change and heavy rains, which exacerbate erosion along the Monsieur River. The area is also threatened by invasive alien species, making conservation measures even more crucial.
Since 2015, the municipality of Fort-de-France, along with project partners, has been working on developing this natural space for both conservation and public engagement purposes. The most recent actions occurred in 2020, including riverbank restoration, clearing invasive species, and creating walking paths and educational installations. Additionally, the project features an awareness campaign targeting local schools. The ongoing initiative aims to merge biodiversity conservation with community recreational use and environmental education, ensuring the resilience of this vital ecosystem against the impacts of climate change. (Refs. 1, 2, 3)

Chickasabogue Park upgrade

Chickasabogue Park, a 1,100-acre outdoor recreation facility and wildlife refuge in Eight Mile, Alabama, is the largest park in Mobile County (Ref 3). Since 2022, the park has undergone extensive renovations aimed at increasing public access to green spaces and shoreline recreational areas, particularly along Chickasabogue Creek, while offering a variety of outdoor activities in a natural setting and preserving local biodiversity (Ref. 3).
The improvements focus on enhancing the day-use area, including upgrades to the playground, a splash pad, basketball courts (adapted to heavy rains with water-permeable materials), and a ball field (Ref 1, Ref 2). Additionally, a new pavilion site and an events and interpretive centre are being developed (Ref 1, Ref 2). Sidewalks and family-friendly walking trails are being built, and improvements are also being made to the park's mountain bike trail and disc golf course (Ref 2), providing more opportunities for outdoor physical activities in nature. Other significant upgrades include the creation of a restroom and a new parking lot with permeable pavers to prevent flooding (Ref 2). Critical infrastructure work is underway, including the installation of underground utilities, water, sewer systems, and roadwork (Ref 2). Furthermore, a new Recreational Vehicles (RV) campground with 38 spaces is in the works (Ref 2).
These upgrades are part of a broader initiative aimed at ensuring the public can quickly access and enjoy natural resources (Ref 2). The renovation also emphasises the cultural heritage and historical significance of the park, with plans to use architecture, design, and artefacts to honour the different cultures that once lived in the area (Ref 2). The next phase includes seeking funding to renovate the beach area and construct a new boat ramp (Ref 1).

PARC Rain Gardens Plymouth

The PARC Rain Garden project in Plymouth, Michigan, is an innovative initiative led by the Plymouth Arts and Recreation Complex (PARC) and Friends of the Rouge, aimed at addressing stormwater management and enhancing local environmental quality. Supported by a $400,000 grant from Michigan’s Department of Environment, Great Lakes, and Energy (EGLE) through its Nonpoint Source Program, this project will involve the construction of over 31,500 square feet of rain gardens located on the property of Plymouth Arts and Recreation Complex (PARC). These gardens are designed to filter up to 240,000 gallons of stormwater per rainfall event, preventing runoff from entering local waterways like the Tonquish Creek. The rain gardens will also mitigate flooding, reduce pollution, and create a more stable water flow in the Rouge River watershed, which is heavily impacted by urban development.
In addition to their environmental benefits, the rain gardens will provide aesthetic and ecological value to the PARC campus. The plantings, featuring native Michigan species, will create habitats for pollinators such as bees, butterflies, and birds, complementing the existing beehives on the PARC rooftop. The project aims to showcase the feasibility of integrating green infrastructure into routine construction, encouraging its adoption in other urban areas and residential spaces.
Ultimately, the PARC Rain Garden project will not only improve stormwater management but also serve as a model for sustainable urban development, enhancing the landscape while fostering environmental stewardship in the Plymouth community.
(Ref.1,2)

Chandler Park Marshland

Chandler Park, a historic park in Detroit constructed in the 1800s, underwent multiple expansions from 1922 to 1950 to include amenities such as a pool (later converted into a water park), a golf course, and public green spaces. In 2013, an expert panel recommended constructing a 2.5-million-gallon marshland within the park to provide a unique recreational and educational feature and incorporate green infrastructure principles for improved stormwater management. Completed in December 2019, the Chandler Park marshland was a collaborative project between The Greening of Detroit and the Chandler Park Conservancy, designed to enhance Green Stormwater Infrastructure (GSI) across 200 acres.
The marshland manages 2.5 million gallons of stormwater, substantially reducing the load on Detroit’s combined sewer system and minimizing basement flooding during heavy rains. Engineered with rain gardens, bioswales, and a pump system circulating up to 4 feet of water, the marshland fosters a balanced ecosystem with higher oxygen levels, benefiting local flora and fauna.
With 4,500 native plants, the marshland supports diverse wildlife, including migrating birds, turtles, frogs, pollinators like bees and butterflies, and natural mosquito predators. This project not only contributes to flood mitigation but also improves water quality by capturing stormwater and allowing pollutants to settle.
Additionally, the marshland provides a foundation for future environmental education, with plans to add an outdoor classroom and public learning spaces. The use of native plants ensures low maintenance and sustainability, requiring minimal water and fertilizers. By creating new habitats and recreational areas, the Chandler Park Marshland promotes biodiversity, environmental education, and community engagement, while alleviating urban runoff’s impact on Detroit’s sewer system.
(Ref.1-3)

Restoration of the Panke river

The Panke is a watercourse that rises outside Berlin and reaches the urban area of the city, flows through the districts of Pankow and Mitte and flows into the Berlin-Spandau Ship Canal in Wedding. The length of the Panke is around 29 kilometres. Almost the entire length of the Panke in Berlin (around 17.6 km) is to be renaturalised - on the section from the state border in the north of Berlin to its confluence with the Berlin-Spandauer-Schifffahrtskanal (BSSK). The Panke is currently a small watercourse that has been heavily remodelled by humans. In large parts of the watercourse, the banks have been straightened like a canal and reinforced with sheet piling, among other things. Existing riverbed drops and weirs prevent fish from travelling unhindered through the watercourse. Studies on water body (structural) quality, typification and other biological quality characteristics have shown that the Panke has poor status values in the majority of Berlin's sections, e.g. in terms of the fish population. The negative assessment results are primarily attributed to the lack of habitat and structural diversity, the lack of passability of the watercourse and, in some cases, high nutrient loads. (Ref. 1)

The restoration of the river was initiated by the State Berlin, following the European Water Framework Directive. The central aim is to implement flood plains and recreate the pre-straightened water course, to ensure space for flooding, habitats for more diverse flora and fauna, increase water flow for better water quality and create a site for recreation in a densely built city. (Ref. 1; Ref. 2) The project started back in 2003 and is expected to be finished in the 2030s (Ref. 2; Ref. 7).

Rimac River Landscape Project

The Rimac River Special Landscape Project, developed by the Municipal Programme for the Recovery of the Historic Centre of Lima (PROLIMA), is a municipal proposal that arose as a response to the significant degradation of the Rimac River as it passes through the historic centre of the Peruvian capital. The river has lost its character as a green corridor and potential public recreational space for citizens (1, 3). The main problems affecting the river are related to the erosion and risk of flooding of the river space, the ecological degradation of its channels and banks, the disconnection and low quality of adjacent public spaces and the urban fragmentation caused by car-oriented mobility (2). To recover its essence as an ecological green corridor, it was proposed to give back to the Historical Centre its riverside identity and to recover the water, environmental and scenic landscape. This project aims to restore the Rímac to its role as a geographical heritage and backbone of the city of Lima, creating a system of accessible and sustainable public spaces that will help to recover this water, urban and historical landscape, as well as providing a better quality of life for the residents and users of the Historical Centre (1).
The project consists of 4 stages of intervention: Puente del Ejército - Puente Santa Rosa / Puente Santa Rosa - Puente Balta / Puente Balta - Límite
of the CHL to the east (5). Among the interventions that make up the Special River Landscape Project are: the renaturation of the 4 km of the Rimac River as it passes through the city, the construction of 14 parks, 7 squares, 1 tree planting project, 24 street renovation projects, 7 bridges/pedestrian walkways, 10 building rehabilitations and 2 new public facilities (4). It is planned to start implementing the project by the end of 2024 (4).

Santry River Restoration and Greenway Project

A new landscape plan for the Santry River, developed since 2019, envisions it as “the backbone of a green infrastructure project,” designed to support nature, pedestrians, and cyclists. The project will create a continuous route from the Dublin Bay Biosphere at St Anne’s Park to the wider hinterlands of Dublin at Sillogue.
The plan proposes transforming the Santry River into an “integrated green-blue landscape for ecology and recreation,” incorporating a variety of sports, cultural, and leisure activities. Through an agreement with Fingal County Council and the National Transport Authority, Dublin City Council has commissioned studies to address the existing flood risks along the river.
The council’s goals for the Santry River include river restoration, flood mitigation, greenway development, and environmental protection, extending from the river’s origin in Harristown within Fingal County to its outlet at James Larkin Road. The project framework will span four years, with annual reviews and budget assessments.
The project team has engaged the public in early autumn of 2022 to gather input on these plans, as the Santry River project aims to create a vibrant River Park that integrates natural and recreational elements. Running through North Dublin, this new green-blue infrastructure will serve both ecological and community needs, offering opportunities for sports, culture, and relaxation. Ultimately, it will form a natural corridor linking the Dublin Bay Biosphere at St Anne’s Park with Sillogue, promoting biodiversity while enhancing accessibility for pedestrians and cyclists (2).

Perch Creek Nature Trail & Preserve

Perch Creek is one of the many meanders that drain into Dog River (Ref 2), located just west of Mobile Bay (Ref 3). These areas include sensitive, tidally influenced marshes and flats where the brackish water of the Bay meets fresh waters (Ref 1). The Perch Creek Nature Trail & Preserve project aims to protect 96 acres on Perch Creek (Ref 3). It is part of efforts to revitalise Mobile’s coastal community and improve the water quality of the city's urban river (Ref 2), following the devastation of the BP oil disaster in 2010.
The project focuses on two main aspects: creating a low-impact recreational destination to spark economic redevelopment, and preserving Mobile’s coastal wetlands (Ref 1).
The conservation aspect involves wetland acquisition, marsh restoration, and invasive species management, improving water quality in both waterbodies (Ref 1). The area, rich in wildlife, requires habitat protection, including for migrating birds, foxes, alligators, manatees, and bald eagles (Ref 1). Brackish marshes on the property serve as nurseries for fish, while forested areas provide natural corridors for wildlife (Ref 3). The wetlands also play a role in flood control, acting as natural sponges to absorb rising tides and cleanse stormwater runoff before it reaches Mobile Bay (Ref 1). Additionally, they store stormwater, helping mitigate flooding as storms intensify (Ref 3).
The recreational aspect includes developing nature-based recreation, such as nature trails and kayak launches, as well as expanding public access to natural resources (Ref 3). In 2018, the Perch Creek section was added to the Alabama Coastal Birding Trail, with educational signage for kayakers (Ref 1).
This comprehensive project preserves vital habitats and flood-absorbing wetlands, while providing outdoor recreation opportunities and supporting the coastal community's recovery (Ref 2). It combines high-quality water resources, wildlife connectivity, scenic beauty, and outdoor recreation (Ref 3).