Lightning Point Restoration

The Lightning Point Restoration Project focuses on protecting Bayou La Batre, one of the Gulf Coast’s few remaining working waterfronts. The community relies on fishing and seafood industries but faces increasing hazards from shoreline erosion, storm surge, hurricanes, and tropical storms. Past events such as Hurricane Katrina (2005) and oil spill (2010) caused major damage to infrastructure and livelihoods, highlighting the need for greater coastal resilience
Led by The Nature Conservancy and partners, the project combines engineered and natural approaches to safeguard the shoreline while supporting local livelihoods. Core activities include constructing approximately 1–1.5 miles of segmented breakwaters and jetties at the mouth of the Bayou La Batre River, and creating about 28–40 acres of coastal marsh, tidal creeks, and upland habitats using beneficially reused dredged material. Native planting and long-term monitoring support habitat performance and adaptive management.
These solutions aim to reduce wave energy, limit erosion, buffer storm surge, and maintain navigation, while restored marshes provide habitat for fish, shellfish, and birds. Designed to withstand nearly one foot of projected sea-level rise over the next 25 years, the project enhances shoreline protection, restores critical coastal habitats, and helps secure a resilient waterfront for Bayou La Batre’s economy and community (Ref. 1 - 4).

Dog river watershed management plan

The Dog River Watershed Restoration project aims to protect and enhance the chemical, biological, and cultural integrity of the Dog River Watershed in Mobile County, Alabama (Ref 1). Guided by the Dog River Watershed Management Plan (WMP), the project addresses key issues such as pollution, litter, stormwater management, and habitat degradation (Ref 2). Funded by the National Fish and Wildlife Foundation's Gulf Environmental Benefit Fund and completed in partnership with stakeholders, the project focuses on implementing targeted restoration activities to improve water quality, protect critical habitats, and increase public awareness and access to the watershed (Ref 2). The Dog River Watershed faces significant hazards, including pollution, sedimentation, erosion, and the impacts of urban development (Ref 3). These challenges are intensified by the watershed’s role as an urban estuary, where land use heavily influences water quality and habitat conditions (Ref 3). To mitigate these threats, the project incorporates pollution prevention measures, shoreline restoration efforts, and community engagement initiatives (Ref 4). By prioritizing scientifically supported actions and aligning with broader environmental goals, the project seeks to restore ecological balance and ensure the long-term health and resilience of the watershed and its connected ecosystems in Mobile Bay (Ref 4).
The Watershed Management Plan for the Dog River Watershed is a key component of the Mobile Bay Shore Habitat Conservation and Acquisition Initiative, which focuses on acquiring, restoring, and preserving habitats and wildlife species affected by the environmental disasters of the Deepwater Horizon oil spill that occurred in 2010 (Ref 6). The project spans three critical areas: 300 acres in the Dog River Watershed (as detailed in this project profile), 450 acres within the Three Mile Creek Watershed, and 40 acres in the Garrows Bend Watershed (not in focus here) (Ref 7).

Meama Coffee Factory Green Roof

The Meama Coffee Factory incorporates ecological elements and functionality with architectural design to create a visually striking building. By doing so, the developers respond to requirements set by the city of Tbilisi for a factory that blends into the peri-urban landscape while avoiding the typical industrial appearance. This requirement corresponds to the architect's values of creating a sustainable and durable structure, implemented through multiple measures (Ref. 1,2). Firstly, a 3,680 square meter green roof has been installed, fully covered with local wild grasses and plants (Ref. 1). This green roof serves multiple purposes: it acts as a thermal barrier, reducing the need for additional roof insulation, mitigates noise pollution from the nearby airport and serves as a recreational and meeting area for visitors and employees (Ref. 1,2,3,4). The factory area also features a pine forest to its backside as well as multiple inside atriums covered in greenery (Ref. 2,3).
Lastly, building materials and installation methods have been selected to ensure the durability of the project, such as roofing membranes that withstand root penetration as well as reinforced concrete structures that are waterproofed and protected against corrosion (Ref. 4&5)

The Lommas Programme

Lomas are endemic seasonal ecosystems found in Peru and Chile. They provide a variety of benefits such as soil stabilisation, air purification, recreational spaces, water retention, and are habitats for endemic and threatened species (Ref 7). They are of great ecosystem value to the city of Lima, as green areas have been reduced in the urban area, occupying up to 24% of urban green ecosystems. These ecosystems are threatened by unplanned urban growth, traffic, pollution and lack of government regulation. Given this context, Eab Lomas is a project that focuses on the conservation, management and rehabilitation of the ecosystems found in the Lomas of Lima (Ref 1, 2, 3, 4, 5). It focused on 4 lines of action: conservation of Lomas' ecosystems; implementation of territorial planning; economic diversification focused on the conservation and recovery of vegetation through low-impact recreational activities; and management of water resources (Ref 1, 2, 3, 4).

Integrated Green and Blue Infrastructure of Wuqing District

The Wuqing District of Tianjin is a rapidly developing suburban district, northwest of the city core, containing 4 larger 5 smaller rivers, 5 water reservoirs, Wetland area that partially protected by the DaHuangPu Nature Reserve, the Jinbei Forest Park, several public parks, greenery near buildings, green roofs and vegetation along roads. A spike in population growth going from 130.000 in 2000 to 1.2 million in 2018 brought the need for wide urban development where the district focused on implementing blue and green infrastructures (1). "The urbanized area of the district is reported to meet the requirements of the national ‘Garden City’ standard with over 36% green coverage, currently aiming to achieve 45% on the long run, and was selected as a pilot national ecological demonstration area for green urban development in 2014. Since 2014, over 500 million EUR was invested into blue and green infrastructure projects (1 p26). The three flagship projects evaluated here are 1) the South Lake (Nanhu) Area that combines business, recreational, residential, and ecological development around in a waterside area, 2) the North Canal Suburban Park which is a recreational, entertainment and wetland area on 2.53 km2 where over 72.000 trees were planted in recent years, 3) and the 400 meter wide, multi-functional green corridor running along the Cuiheng Road (1).

Ecological Wetland Park in Tianjin

The Ecological Wetland Park is a 630,000 m2 artificial wetland located in a high tech industrial pioneer zone, adjacent to the Tianjin Harbor. The project was initiated by an agency of the local government and constructed with financial support from the Asian Development Bank (1). The area of the park used to be "a natural coastal salt marsh, which become reclaimed land in the early 2000s. The resulting saline-alkaline area had minimal ecosystem value and use value (as it was not considered to be suitable for agricultural activities either)" (1 p20). The wetland park's objective is threefold: 1) to provide a natural wastewater treatment plant for the industrial area to decrease pollutant discharge into the Bohai Bay and improve water quality; 2) to rehabilitating and restoring the once thriving biodiversity in the Harbor Area and the Hai river's estuary 3) to create a place for recreation and leisure for residents. (1)

Parc Marianne ecodistrict

Parc Marianne is an ecodistrict that aims to address multiple challenges such as climate action for adaptation, environmental quality, flooding, and in response to the high population growth in Montpellier. Parc Marianne is connected to public transportation, has bicycle lanes and car parks, and the sidewalk is shared between pedestrians and bicyclists and structured with trees and other greenery. The park was certified with the ecodistrict label in 2015 following requirements like environmental sustainability, thermal performance, quality of life, nature and biodiversity, and mobility (Ref. 1). Parc Marianne is a mixed neighbourhood with an ability to combine city and nature, quality of life and centrality (Ref. 2).

Stavros Niarchos Foundation Cultural Center (SNFCC)

The Stavros Niarchos Foundation Cultural Center (SNFCC) is a project finalised in 2016 and “handed over” through a public/private partnership scheme, from the foundation/donor to the Greek state. The site hosts the National Library of Greece and the Greek National Opera in a 170,000 sq m landscaped park. The SNFCC's objective is to restore Greece's image and become a global role model of environmental sustainability. The project is committed to a range of educational and cultural activities, which have been provided for free. It also claims flood-regulating functions, air quality improvement impacts and shade provision, among others. [1]

Zorrotzaurre new flood proof district

Zorrotzaurre is an artificial peninsula located within the Deusto district of Bilbao, Spain. It was formed during the 1950s and the 1960s, when a canal was built to facilitate navigation in the estuary of Bilbao. The Zorrotzaurre project is the latest major urban renewal project to commence in Bilbao. It is an integral and sustainable plan that recuperates a currently derelict site to convert it into a new quarter, and which also includes a flood protection system with water tanks to retain water and a flood protection barrier (Ref 1)

Arrenberg climate district: Arrenbergfarm

Based on an urban regeneration project in the city district of Arrenberg, an association called “Awakening of the Arrenberg” formed in 2008, consisting of citizens, entrepreneurs and real estate owners seeking to transform their district. Under the umbrella of the project “climate quarter Arrenberg” initiated in 2014, whose goal is to make the district CO2 neutral by 2030, the development of a city farm covering 60,000 sqm on former railway premises - a Europe-wide unique project in urban farming – is one of their most important plans that make up their vision of becoming carbon neutral. (Ref. 1, 2 and 3). The goal of the farm is to produce healthy and locally produced food, while creating employment opportunities and remaining carbon-neutral, using power only from the sustainable power plant that will be installed for the project. (Ref. 2) In February 2020, the implementation has not yet started, but the “Awakening of the Arrenberg” association says the vision of the urban farm is stronger than ever before and that the project has received funding approval, with experts now working on feasibility studies. (Ref. 8).