Community garden on Graveyard
The Prinzessinnengarten Kollektiv Berlin is a community garden in the New St Jacobi Cemetery in Berlin-Neukölln that invites people to join in gardening and experience nature. As part of open gardening days, people can participate in the design of the garden areas and gain experience in the local, ecological cultivation of useful plants. The main aim of their work is to provide opportunities for education and participation. Activities are open to everyone and range from sowing, planting and harvesting to seed production, processing and preserving vegetables, keeping bees to questions of community-based urban habitat design.The community also has its own farm shop where seeds, food and processed products are sold. (Ref. 1; Ref. 4) Numerous projects for recycling and upcycling, innovative cultivation methods, organic beekeeping, composting methods and post-fossil mobility use the Prinzessinnengarten as a platform for sustainable urban living. Artists also work in the garden with participatory methods on the question of how cities and their coexistence can be designed in a sustainable and resource-saving way. Outside the Prinzessinnengarten, offshoot gardens are set up and collaborations are developed to build nationwide and European networks. Through lectures, workshops, study visits and participatory research in the garden, we endeavour to include and further develop the topics associated with the Prinzessinnengarten in discussions and education. (Ref. 7)
The project is located on a cemetery, which has been partially closed since 2016. This means that burials are no longer carried out on the site and the existing rights of use of the 500 or so remaining graves will no longer be extended after expiry. The church association lends the land to the project in exchange for maintenance work on the surrounding grounds. (Ref. 6)
The project is located on a cemetery, which has been partially closed since 2016. This means that burials are no longer carried out on the site and the existing rights of use of the 500 or so remaining graves will no longer be extended after expiry. The church association lends the land to the project in exchange for maintenance work on the surrounding grounds. (Ref. 6)
Revitalization of Loma El Marion
The Loma del Marión recovery project in Cartagena, Colombia, is a community-driven initiative supported by EPA Cartagena that focuses on restoring and conserving the remaining 1.2 hectares of tropical dry forest. Initially covering 33 hectares, the area has suffered degradation due to illegal encroachments, deforestation, and waste burning. The project has included planting over 3,000 plants and fostering community involvement in environmental conservation (ref 1). The main goals are to restore the ecosystem by reforesting native species, preventing landslide risks, and developing an ecopark that will serve as an educational and recreational space. Planned facilities include a library for learning about local flora and fauna, hiking trails, and a community garden to enhance local food security (ref 1,4). A notable educational initiative in the project is the formation of "Vigías del Ambiente" (Environmental Watchers), a group of 40 youths from the Red Nacional Jóvenes de Ambiente, supported by EPA Cartagena and CDKN. This initiative educates young people on climate change, conservation, and waste management through workshops and activities (ref 2, 3). In addition, the EPA is leading detailed studies of the tropical dry forest to identify and protect endemic species (ref 5). The project has resulted in significant environmental and social benefits, such as planting thousands of trees, boosting community engagement in conservation, and establishing youth groups dedicated to sustainable development and climate action (ref 3, 5).
Adana Riverside Central Park
The Adana Central Park stretches along both riverbanks of the Seyhan River. The idea was first introduced by the former mayor of the city, Aytaç Durak, in the late 80s to address the need for accessible green spaces in the developing area (Ref, 2). Previously, citrus gardens and informal settlements were located on these riverbanks, which now host over 400.000 plants and 67 different tree species on an area of 33 ha (Ref. 2,5,6). In 1998 construction of the park began, which lasted until 2004 (Ref. 2,5). The park is appreciated by visitors for its aesthetically landscaped appearance and the many amenities for children, youth, relaxation and socializing (Ref. 7). The two sides of the river are connected via bridges or, alternatively, visitors can board the Venetian style gondolas to access either side (Ref. 5). In 2021, park lighting infrastructure has been extensively replaced to ensure accessibility and safety during day and nighttime (Ref. 3).
Restoration of the green area on Lago Avenue
The Recovery of Green Area on Avenida del Lago is a group of activities aimed at restoring and preserving the ecological integrity of green space within an urban setting. This project involves multiple stakeholders, including the "Establecimiento Público Ambiental" (EPA) Cartagena, "Fundación Verde Que Te Quiero Verde", Asopopa, and local businesses such as Crepes and Wafles and Centro Comercial Caribe Plaza. The primary focus is environmental restoration, sustainable urban mobility, and public space recovery (ref 1). The project aims to rehabilitate the degraded green spaces along Lago Avenue by enhancing urban greenery, restoring mangrove ecosystems, and improving public access and mobility. It also focuses on reducing pollution, preventing informal waste disposal, and raising environmental awareness among local communities and businesses. These activities align with broader efforts to promote ecological sustainability and enhance urban resilience (ref 1, 3). Since 2020, activities have included the planting of trees, mangroves, and other native vegetation in the green spaces of the avenue. Regular clean-up campaigns have been organized to remove solid waste, and community education programs have been conducted to promote environmental stewardship (ref 2). Previously, Lago Avenue was an area plagued by pollution and homelessness, and with the project, the intention is to gradually transform the area into a wooded area or productive park (ref 2).
Redevelopment of a Green Zone along the Byzantine Walls (Eptapyrgiou Street)
The green belt regeneration project along the Byzantine Walls of Thessaloniki aims to revitalize the neglected green spaces surrounding these historic fortifications, which span 4 kilometers and are recognized as a UNESCO World Heritage site for their remarkable Byzantine architecture. The walls are located in Thessaloniki’s densely populated Upper Town, a factor that contributed to their environmental degradation. As such, the project focuses on restoring the degraded space surrounding the walls, improving the urban microclimate, and strengthening urban resilience while maintaining the area’s traditional character. By integrating heritage conservation with sustainable green infrastructure, the initiative seeks to provide both environmental and social benefits to the local community. Proposed by the Municipality of Thessaloniki and approved by the Greek government as part of a program that focuses on Central Macedonia, the project envisions a revitalized green zone along the walls, with vegetation and different types of trees being planted. However, some local families have expressed concerns, as the project involved the demolition of certain homes in the officially designated green belt area. (Refs. 1, 2, 3, 4, 14).
The Line Park: Redeveloping old Railway Tracks
The "Line Park" project in Belgrade aims to create a continuous green belt spanning 4.6 kilometres and covering over 48 hectares. As such, the project will revitalize the former railway corridor from "Beton Hala", just below the Belgrade Fortress, to the Pancevac Bridge. Inspired by notable urban parks like New York's "High Line", Moscow's "Zagrađe," and Toronto's "Rail Corridor," it will become a major recreational destination and also help to alleviate the pressures from the city's heavy air pollution and summer heat (Ref. 5, 6).
The park will be divided into ten thematic sections dedicated to aromatic plant and flower gardens, urban gardening and beekeeping, sports facilities, a newly built university campus and more. Additionally, there will be an amphitheatre and facilities for outdoor education. To further integrate green infrastructure, new buildings will have green roofs and walls (Ref. 2,5). Ultimately, the park integrates a number of amenities into the entire city.
The development of the park also introduced innovative co-creation mechanisms in terms of governance and planning. Since Belgrade is part of the multinational CLEVER Cities Initiative, the city's Secretariat for Environmental Protection suggested the use of the site as a pilot test for introducing nature-based solutions in urban planning and with diverse stakeholders' input. Several workshops, focus groups, and consultations took place between 2019 and 2021, which facilitated the diversity of ideas that have been adopted into the official construction plan (Ref. 1, 2). Despite these successes, civil society groups raise concerns over the extraordinary cost of 70 million euros, displacement of Roma communities and the interest of real estate developers that may undermine the project's original cause (Ref. 3, 8).
The park will be divided into ten thematic sections dedicated to aromatic plant and flower gardens, urban gardening and beekeeping, sports facilities, a newly built university campus and more. Additionally, there will be an amphitheatre and facilities for outdoor education. To further integrate green infrastructure, new buildings will have green roofs and walls (Ref. 2,5). Ultimately, the park integrates a number of amenities into the entire city.
The development of the park also introduced innovative co-creation mechanisms in terms of governance and planning. Since Belgrade is part of the multinational CLEVER Cities Initiative, the city's Secretariat for Environmental Protection suggested the use of the site as a pilot test for introducing nature-based solutions in urban planning and with diverse stakeholders' input. Several workshops, focus groups, and consultations took place between 2019 and 2021, which facilitated the diversity of ideas that have been adopted into the official construction plan (Ref. 1, 2). Despite these successes, civil society groups raise concerns over the extraordinary cost of 70 million euros, displacement of Roma communities and the interest of real estate developers that may undermine the project's original cause (Ref. 3, 8).
Recovery plan of the Juan Angola Channel
The Juan Angola River is an urban channel included in the system of rivers and channels of Cartagena, and it connects the Ciénaga de la Virgen wetland and the Bay of Cartagena, facing similar issues as the Cienaga de la Virgen such as illegal occupation of its shores, illegal waste dumping, deforestation of mangroves, and pollution. The recovery plan for the Juan Angola River is led by the EPA Cartagena (Environmental Protection Agency), with the support of other institutions, aiming to restore the Juan Angola’s ecosystem. This includes targeting the mangrove forest, dredging the natural channel, and delineating buffer zones with urban infrastructure to create public recreational spaces. The activities involve relocating people illegalling cupping informal settlements from the river shore, moving an existing bridge (the Benjamín Herrera bridge) which obstructs the current, recovering the low tide and riverbed areas, building pedestrian paths, clean the riverbank, recover mangrove areas and establish programs of education and environmental awareness (ref 1 and 2).
Recovery project for La Cienaga de la Virgen
The Ciénaga de la Virgen is a coastal wetland (cienaga) located on the north side of the border of the city of Cartagena, separated from the sea by La Boquilla's sandy beach. It has a maximum width of 4.5 km, a length of approximately 7 km, a water body area of about 22.5 km², and depths of up to 1.6 m. It is connected to the city's canal system (ref 1). The recovery project of la Cienaga de la Virgen, led by EPA Cartagena, is proposed as a strategy to address the issues affecting the water body, local communities, the economic activities that depend on it, and the ecosystems that regulate the water cycle and provide multiple services, many of them essential, with an integrated and global management approach based on the basin as the unit for planning and resource management (ref 14). Some of the main problems of the wetland are related to illegal settlements on its shore, as well as illicit dumping of waste, pollution by wastewater from the illegal settlements and deforestation of mangroves (ref 4). Key activities include stopping illegal occupation by relocating established families, improving roads, promoting reforestation, encouraging social participation, managing wastewater, and enhancing tidal systems (ref. 1 and 15).
Alonside the EPA, other stakeholders involved include the regional authority "Regional Autonomous Corporation of the Canal del Dique" (Cardique), with jurisdiction in the rural area, and Cartagena Mayor's Office, and the local community, involved in all the stages of the plan thanks to the “mesas de governance” or "governance tables", discussion spaces where different actors participate in the decision-making (ref 2).
Alonside the EPA, other stakeholders involved include the regional authority "Regional Autonomous Corporation of the Canal del Dique" (Cardique), with jurisdiction in the rural area, and Cartagena Mayor's Office, and the local community, involved in all the stages of the plan thanks to the “mesas de governance” or "governance tables", discussion spaces where different actors participate in the decision-making (ref 2).
Cerro de la Popa recovery Project
Reforestation project for the "Cerro de la Popa", which is Cartagena's highest point and one of the main tourist attractions because of the view and its colonial convent (Ref 6). The hill currently faces illegal occupation and environmental deterioration caused by deforestation, poor solid waste management, burning, logging, and the loss of vegetation cover (Ref 4, 5). The intervention in La Popa consists of reforestation activities, environmental education activities with children, and awareness-raising activities with adults about caring for fauna, flora, and water bodies (ref 2, 3). SSince 2020, the Establecimiento Público Ambiental (EPA Cartagena) has led the recovery initiative, prompted by the urgent need to counter the increasing encroachment by migrants and vulnerable populations (Ref 4). The project comprises reforestation efforts, environmental education sessions with children, and community outreach to raise awareness among adults regarding the protection of local fauna, flora, and water bodies (Refs 2, 3). As part of a broader municipal agenda, the initiative remains active, with the most recent intervention conducted on July 11, 2024 (Ref 2).

