Displaying 11 - 20 of 337

City of Fairhope: Working Waterfront and Greenspace Restoration Project

Fairhope's Municipal Pier is a popular bayfront destination featuring a 1/4-mile pier, swimming areas, picnic spots, a landscaped rose garden, benches, restrooms, a marina, a restaurant, walking trails, and a duck pond. However, the area has been fragilized over the years. The beaches are absent and less prominent now, due in large measure to the presence of shoreline hardening (Ref 5), making the shoreline more vulnerable to climate hazards (Ref 5).
The main goal of the Working Waterfront and Greenspace Restoration Project is to introduce safe and user-friendly improvements to the 10-acre South Beach Park area, which encompasses the Municipal Pier (Ref 2). These upgrades aim to enhance the public's use and access of the waterfront, while ensuring the park's long-term resilience and sustainability (Ref 2). The new design tackles both the structural issues of the bulkhead/seawall and the overall aesthetics of the Fairhope Pier area (Ref 2).
Over the years, storms, particularly Hurricanes Sally and Zeta, have compromised the structural integrity of the anchoring hardware of the bulkhead/seawall, causing parts of the wall to shift. Additionally, water intrusion behind the wall has eroded the soil supporting the walkway in certain areas (Ref 2). Other important features include new handrails, decking, restroom facilities, and lights on the pier. The project will also add new stairs leading to the bluff, restore the fountain, and renovate the parking lot. A funicular lift will be installed at the bluff to enhance accessibility (Ref 5).
Pedestrian safety will be improved to meet the requirements of the Americans with Disabilities Act. Other enhancements include landscaping with new irrigation, and the construction of new sidewalks (Ref 2, Ref 4).

Los Remedios park

The old Altadis tobacco factory in the Los Remedios neighbourhood of Seville is being transformed into an area with offices, hotels and lots of green space. New green space will connect existing green areas next to the river, resulting in a total of 13 378 m2 of green areas within 3 ha of public space. The park will increase the number of trees in the area by 60 per cent, creating a lot more shaded areas, which are needed during the hot summers [Ref. 1-5]. Additionally, the trees will contribute to carbon sequestration, improve air quality and promote biodiversity [Ref. 5]. The park is meant to become a popular destination for recreation, new entrances and a bridge over the river will connect the surrounding neighbourhoods to the park [Ref. 1-3]. There will be areas for physical activity, dog walking and play for children [Ref. 1, 4]. The project is being carried out by real estate company KKH Property Investment, which owns the land and will invest 250 million EUR in the project as a whole, of which 5 million EUR is designated for green spaces. KKH has made an agreement with the City of Seville to ensure the project has benefits for the area and its citizens, and follows previous plans for the area, which have involved citizen participation [Ref. 3, 6, 9].

Tricentennial Park improvements

The project for Tricentennial Park involves a series of improvements aimed at enhancing its overall infrastructure and appeal. Among the planned upgrades is an enhancement of the pavilion, along with the addition of other site amenities (Ref 1). A lake is also being created as part of the project (Ref 2). Currently, work is underway on phase two, which includes landscaping, the construction of a group picnic pavilion, walking trails, a parking area, and even a misting machine to provide relief during hot weather (Ref 2).
One of the key highlights of the project is the opening of a new playground in 2024, featuring a unique design. The park is laid out in a figure-eight pattern, and a sign within the park highlights its recognition for following “best practices in youth fitness,” encouraging children to stay active through sliding, swinging, spinning, climbing, brachiating, and balancing (Ref 2). This park is the first in Mobile designed exclusively for passive use, without ball fields, providing a space for families and individuals to enjoy the playgrounds (Ref 4). The park fosters social interaction, allowing children to build friendships and create lasting memories while spending time with their families (Ref 4). The park also boasts beautiful scenery, adding an aesthetic dimension to the overall experience (Ref 2).
Tricentennial Park is part of the larger Three Mile Green Trail, a 6.5-mile linear park. A one-mile segment of the trail is located within Tricentennial Park. The trail will be expanded east to MLK Boulevard and west to Bush Park by 2024 (Ref 1).

Revitalization of parks in Almirante Colón neighborhood

The revitalization and environmental recovery initiative in the Almirante Colón neighborhood of Cartagena focused on transforming green spaces and addressing environmental hazards posed by improper waste disposal and urban degradation. The primary goals of the project were to enhance urban green spaces, improve community well-being, and mitigate environmental hazards such as pollution and improper waste management (ref 1,2). The initiative involved multiple stakeholders, including the local government, community leaders, and private sector actors. The Gerencia de Espacio Público y Movilidad led the revitalization of three parks, focusing on cleaning up waste, maintaining green areas, and upgrading recreational facilities. Parallelly, Veolia, a private sector partner, worked with community leaders to recover neglected areas that were previously used for dumping mixed waste and beutify the environment. These efforts included planting activities, installation of solar lamps, and community education on proper waste disposal practices​ (ref 1,2). The revitalization of the parks benefited over 400 families, providing them with safe and clean recreational spaces. The project also successfully eliminated a significant dumping site, reducing pollution and enhancing the neighborhood's aesthetic appeal. Moreover, the initiative fostered a stronger sense of community ownership and responsibility towards maintaining the improved environment​ (ref 1,2).

Torslanda school

Torslanda School is a newly built elementary school (years 0-6) where the schoolyard includes innovative ways to manage rainwater. The school was initially part of the Rain Gothenburg project, which aims to make the city, and this school, the best in the world when it rains. It was also a pilot project within the city's "equal building" initiative, aiming to make indoor and outdoor environments accessible and attractive to everyone regardless of gender identity, functional diversity or age [Ref. 1]. The main element of the schoolyard is a "river" to which water will be led when it rains, combining stormwater management with opportunities for play and education. The system will retain about 310 m3 of water and treat it before releasing it to a recipient. The river will be used to teach the children about climate, ecology, biodiversity and the water cycle. The river and schoolyard are connected to a natural wetland [Ref. 3, 4]. The school is run by the City of Gothenburg, who initiated the project, employing an architecture firm and a construction company to design and build the school and schoolyard [Ref. 3-5].

Rehabilitation of Hon. John N. Michuki Memorial Conservation Park

The John Michuki Memorial Park was transformed from a vast dumpsite in 2008 and established in honor of John Michuki, the Environment Minister during the Kibaki administration, in 2012. Michuki garnered admiration and accolades for his enthusiasm and determination to clean and preserve the environment (Ref 1, 2). Situated along the Nairobi River, the park serves as a historically rich recreational facility (Ref 3).
However, several issues arose after the park was transferred to the county administration in 2013 (Ref 2). A section of the Nairobi River flowing through the park experienced severe environmental degradation due to illegal discharges and poor waste management, negatively impacting the riparian ecosystem and biodiversity (Ref 4). Additionally, the park became a refuge for drug users, street children, and thieves, with stray dogs posing safety threats in the area (Ref 1, 2).
As the first project within the Cleaning Up Kenya Campaign, the restoration of Michuki Memorial Park was launched in 2020 by the government (Ref 5). The park is now managed by the Kenya Forest Service (KFS) following a directive from the national government (ibid.). With funds from the treasury, a perimeter fence was erected, a 2.4 km walkway was constructed, and 4,200 seedlings and 6,357 indigenous trees were planted, along with the establishment of a nursery (Ref 1, 6). A total of 20,000 tons of solid waste were removed (Ref 6). Additionally, a community forest association was formed to ensure community engagement (Ref 2).

Chickasabogue Park upgrade

Chickasabogue Park, a 1,100-acre outdoor recreation facility and wildlife refuge in Eight Mile, Alabama, is the largest park in Mobile County (Ref 3). Since 2022, the park has undergone extensive renovations aimed at increasing public access to green spaces and shoreline recreational areas, particularly along Chickasabogue Creek, while offering a variety of outdoor activities in a natural setting and preserving local biodiversity (Ref. 3).
The improvements focus on enhancing the day-use area, including upgrades to the playground, a splash pad, basketball courts (adapted to heavy rains with water-permeable materials), and a ball field (Ref 1, Ref 2). Additionally, a new pavilion site and an events and interpretive centre are being developed (Ref 1, Ref 2). Sidewalks and family-friendly walking trails are being built, and improvements are also being made to the park's mountain bike trail and disc golf course (Ref 2), providing more opportunities for outdoor physical activities in nature. Other significant upgrades include the creation of a restroom and a new parking lot with permeable pavers to prevent flooding (Ref 2). Critical infrastructure work is underway, including the installation of underground utilities, water, sewer systems, and roadwork (Ref 2). Furthermore, a new Recreational Vehicles (RV) campground with 38 spaces is in the works (Ref 2).
These upgrades are part of a broader initiative aimed at ensuring the public can quickly access and enjoy natural resources (Ref 2). The renovation also emphasises the cultural heritage and historical significance of the park, with plans to use architecture, design, and artefacts to honour the different cultures that once lived in the area (Ref 2). The next phase includes seeking funding to renovate the beach area and construct a new boat ramp (Ref 1).

Chandler Park Marshland

Chandler Park, a historic park in Detroit constructed in the 1800s, underwent multiple expansions from 1922 to 1950 to include amenities such as a pool (later converted into a water park), a golf course, and public green spaces. In 2013, an expert panel recommended constructing a 2.5-million-gallon marshland within the park to provide a unique recreational and educational feature and incorporate green infrastructure principles for improved stormwater management. Completed in December 2019, the Chandler Park marshland was a collaborative project between The Greening of Detroit and the Chandler Park Conservancy, designed to enhance Green Stormwater Infrastructure (GSI) across 200 acres.
The marshland manages 2.5 million gallons of stormwater, substantially reducing the load on Detroit’s combined sewer system and minimizing basement flooding during heavy rains. Engineered with rain gardens, bioswales, and a pump system circulating up to 4 feet of water, the marshland fosters a balanced ecosystem with higher oxygen levels, benefiting local flora and fauna.
With 4,500 native plants, the marshland supports diverse wildlife, including migrating birds, turtles, frogs, pollinators like bees and butterflies, and natural mosquito predators. This project not only contributes to flood mitigation but also improves water quality by capturing stormwater and allowing pollutants to settle.
Additionally, the marshland provides a foundation for future environmental education, with plans to add an outdoor classroom and public learning spaces. The use of native plants ensures low maintenance and sustainability, requiring minimal water and fertilizers. By creating new habitats and recreational areas, the Chandler Park Marshland promotes biodiversity, environmental education, and community engagement, while alleviating urban runoff’s impact on Detroit’s sewer system.
(Ref.1-3)

Rimac River Landscape Project

The Rimac River Special Landscape Project, developed by the Municipal Programme for the Recovery of the Historic Centre of Lima (PROLIMA), is a municipal proposal that arose as a response to the significant degradation of the Rimac River as it passes through the historic centre of the Peruvian capital. The river has lost its character as a green corridor and potential public recreational space for citizens (1, 3). The main problems affecting the river are related to the erosion and risk of flooding of the river space, the ecological degradation of its channels and banks, the disconnection and low quality of adjacent public spaces and the urban fragmentation caused by car-oriented mobility (2). To recover its essence as an ecological green corridor, it was proposed to give back to the Historical Centre its riverside identity and to recover the water, environmental and scenic landscape. This project aims to restore the Rímac to its role as a geographical heritage and backbone of the city of Lima, creating a system of accessible and sustainable public spaces that will help to recover this water, urban and historical landscape, as well as providing a better quality of life for the residents and users of the Historical Centre (1).
The project consists of 4 stages of intervention: Puente del Ejército - Puente Santa Rosa / Puente Santa Rosa - Puente Balta / Puente Balta - Límite
of the CHL to the east (5). Among the interventions that make up the Special River Landscape Project are: the renaturation of the 4 km of the Rimac River as it passes through the city, the construction of 14 parks, 7 squares, 1 tree planting project, 24 street renovation projects, 7 bridges/pedestrian walkways, 10 building rehabilitations and 2 new public facilities (4). It is planned to start implementing the project by the end of 2024 (4).

Rehabilitation of Rinia Park

Rinia Park has been a significant social and recreational area in the center of Tirana since the 1950s. Over the years, it has undergone several phases of development and restructuring, each linked to the socio-political regime of the time (Ref. 1). Its most recent rehabilitation was driven by the need to revitalize public spaces and improve the quality and accessibility of urban green areas. In 2019, extensive work on enhancing the park’s infrastructure and amenities began. By June 2020, installations were completed, including new and diverse playgrounds for children, improved lighting and drainage systems, expanded walking paths as well as designated chess and dog areas (Ref. 1,2,6). Both children and the elderly benefit from these new features, which promote social interaction and make the park more inclusive for different age groups (Ref. 2).
To protect the Independence Monument from vandalism, a surrounding water feature was added. An additional benefit of the the new lighting installation is the extended access of the park well into the evening (Ref. 1,6).
Given the park’s profound history, it stands as a symbol of urban renewal and continues to serve as a central gathering spot for people and cultural events (Ref. 7).