Horpaz-Ezăreni Park
The Horpaz-Ezareni Park is an initiative driven by civil society, requesting the municipality of Miroslava to construct a natural park adjacent to Lake Ezareni. The aim is to protect its green spaces and aquatic bird species while addressing waste management in the area. The petition also called for more green spaces in line with European standards and sought to tackle the challenges of rapid urbanization in peri-urban areas. It collected hundreds of signatures and targeted an area of 20 hectares.
In response, the municipality agreed to the petition and initially proposed creating a park covering 4 hectares in 2022. This first plan was released to the public for consultation. However, the project has since evolved to encompass the original 20 hectares, plus an additional 2 hectares, with an estimated project cost of 11,000,000 euros and a timeline of 3 years for implementation.
The park's design includes various facilities and amenities aimed at enhancing opportunities for recreation, exercise, and relaxation. Accessible paths for pedestrians and cyclists, as well as a parking lot, are also part of the plan. Additionally, two buildings are proposed for sanitary and administrative purposes, which would manage the projected installations of a lighting system, Wi-Fi, and surveillance cameras.
Environmentally, the project includes plans for managing the lake's banks to remove hydrophilic vegetation that could create an unhealthy environment, along with the construction of two bridges. The wilderness areas will be managed, and dendrological plants will be introduced to improve the ecosystem's quality. Overall, the project aims to increase and regenerate green spaces in the commune, enhancing the quality of life for residents and improving the area's aesthetic appeal. (1-8)
In response, the municipality agreed to the petition and initially proposed creating a park covering 4 hectares in 2022. This first plan was released to the public for consultation. However, the project has since evolved to encompass the original 20 hectares, plus an additional 2 hectares, with an estimated project cost of 11,000,000 euros and a timeline of 3 years for implementation.
The park's design includes various facilities and amenities aimed at enhancing opportunities for recreation, exercise, and relaxation. Accessible paths for pedestrians and cyclists, as well as a parking lot, are also part of the plan. Additionally, two buildings are proposed for sanitary and administrative purposes, which would manage the projected installations of a lighting system, Wi-Fi, and surveillance cameras.
Environmentally, the project includes plans for managing the lake's banks to remove hydrophilic vegetation that could create an unhealthy environment, along with the construction of two bridges. The wilderness areas will be managed, and dendrological plants will be introduced to improve the ecosystem's quality. Overall, the project aims to increase and regenerate green spaces in the commune, enhancing the quality of life for residents and improving the area's aesthetic appeal. (1-8)
Phoenix Park
The Phoenix Park initiative was carried out by the "Gheorghe Asachi" Technical University of Iași in partnership with the Iași Communitarian Foundation, the BorgWagner Fund, and the Municipality of Iași. It involved the rehabilitation of a green space within the university campus. Covering an area of 3,000 square meters, the renovation was based on the winning design from a student competition focused on improving campus spaces.
The park was designed to include facilities for physical exercise (calisthenics equipment), recreation (badminton court and ping-pong table), and social interaction spaces. It also serves as a buffer to reduce noise from the surrounding areas.
The total cost of the project amounted to 121,200 euros, with the university covering infrastructure expenses, the municipality providing the labor for rehabilitation, and the private fund contributing 15,150 euros. The implementation of the design was overseen by the student designer and coordinated by the NGO and the university’s Association of Student Architects.
This initiative is part of a larger urban regeneration project by the university, in collaboration with the municipality and the Communitarian Foundation, where several campus green spaces are being rehabilitated based on student designs. The overarching goal is to enhance students' quality of life and promote healthy lifestyles through the creation of green spaces during their time at the university. (1, 2, 5, 6, 8, 13, p. 92)
The park was designed to include facilities for physical exercise (calisthenics equipment), recreation (badminton court and ping-pong table), and social interaction spaces. It also serves as a buffer to reduce noise from the surrounding areas.
The total cost of the project amounted to 121,200 euros, with the university covering infrastructure expenses, the municipality providing the labor for rehabilitation, and the private fund contributing 15,150 euros. The implementation of the design was overseen by the student designer and coordinated by the NGO and the university’s Association of Student Architects.
This initiative is part of a larger urban regeneration project by the university, in collaboration with the municipality and the Communitarian Foundation, where several campus green spaces are being rehabilitated based on student designs. The overarching goal is to enhance students' quality of life and promote healthy lifestyles through the creation of green spaces during their time at the university. (1, 2, 5, 6, 8, 13, p. 92)
Lacides Segovia Urban Park
Parque Lácides Segovia is an urban park located on Isla de Manga in Cartagena, Colombia. The park was inaugurated and revitalizated in June 2014 to serve as a multifunctional green space promoting cultural, social, and environmental activities. Named after General Lácides Segovia, a notable figure in Cartagena's history, the park aimed to provide a family-friendly and culturally enriching environment (ref 1). The primary goal was to transform a neglected urban area into a dynamic public space that fosters community interaction and enhances local culture. The park aimed to create a safe, inclusive, and accessible environment for residents of all ages, promoting social integration and cultural activities. Additionally, the project sought to establish a green area contributing to the ecological health of the city through urban greenery (ref 1, 2).
The first revitalization in 2014 involved facilities, planting native trees, and setting up public amenities such as Wi-Fi, seating, and cultural spaces(1, 2, 3).
This new revitalization in 2024, led by the local government of Cartagena, will focus on enhancing the infrastructure of both the park and the surrounding sports area in Manga to improve sustainability. The project has an estimated budget of approximately USD 675,000. The improvement works to provide better facilities and infrastructure to support recreational and sports activities, benefiting the community and promoting a healthier urban environment (ref 6). The park is essential for the community; it was recently the subject of several citizen science projects led by the Montessori School, including research identifying the park's ecosystem services (ref 3).
The first revitalization in 2014 involved facilities, planting native trees, and setting up public amenities such as Wi-Fi, seating, and cultural spaces(1, 2, 3).
This new revitalization in 2024, led by the local government of Cartagena, will focus on enhancing the infrastructure of both the park and the surrounding sports area in Manga to improve sustainability. The project has an estimated budget of approximately USD 675,000. The improvement works to provide better facilities and infrastructure to support recreational and sports activities, benefiting the community and promoting a healthier urban environment (ref 6). The park is essential for the community; it was recently the subject of several citizen science projects led by the Montessori School, including research identifying the park's ecosystem services (ref 3).
The Three Mile Creek Hydrological Restoration
The Three Mile Creek Hydrological Restoration project is taking place in one historic channel of the Three Mile Creek, located east of Dr. Martin Luther King, Jr. Avenue, and covering approximately 1,800 linear feet (Ref 3). This project, led by the City of Mobile, aims to remove sediment from the stream channel. This segment of the Creek was bypassed with a straight channel in the early 1980s to control flooding in the area, thus accelerating the accumulation of sediments in the historic channel (Ref 1).
The project's goal is to restore and maintain the natural flow to the historic channel and create a connection to the City and County's Blueway initiatives (Ref 3). This will improve habitat conditions and water quality and help to protect the area’s estuarine and marine water resources (Ref 8). It will also contribute to revitalizing the Three Mile Creek Watershed and provide increased recreational opportunities for citizens, like kayaking and canoeing (Ref 6). Construction work occurred in 2022 and 2023 (Ref 3).
The Three Mile Creek Hydrological Restoration is a key component of the Mobile Bay Shore Habitat Conservation and Acquisition Initiative, which focuses on acquiring, restoring, and preserving habitats, including riparian, wetland, and upland areas that support various fish and wildlife species affected by the environmental disasters of the Deepwater Horizon oil spill that occurred in 2010 (Ref 1). The project spans three critical areas: 450 acres within the Three Mile Creek Watershed (as detailed in this project profile), 300 acres in the Dog River Watershed, and 40 acres of bay shore property in the Garrows Bend Watershed (with the latter two areas being part of separate initiatives) (Ref 4).
The project's goal is to restore and maintain the natural flow to the historic channel and create a connection to the City and County's Blueway initiatives (Ref 3). This will improve habitat conditions and water quality and help to protect the area’s estuarine and marine water resources (Ref 8). It will also contribute to revitalizing the Three Mile Creek Watershed and provide increased recreational opportunities for citizens, like kayaking and canoeing (Ref 6). Construction work occurred in 2022 and 2023 (Ref 3).
The Three Mile Creek Hydrological Restoration is a key component of the Mobile Bay Shore Habitat Conservation and Acquisition Initiative, which focuses on acquiring, restoring, and preserving habitats, including riparian, wetland, and upland areas that support various fish and wildlife species affected by the environmental disasters of the Deepwater Horizon oil spill that occurred in 2010 (Ref 1). The project spans three critical areas: 450 acres within the Three Mile Creek Watershed (as detailed in this project profile), 300 acres in the Dog River Watershed, and 40 acres of bay shore property in the Garrows Bend Watershed (with the latter two areas being part of separate initiatives) (Ref 4).
Forest Park La Molina
The intervention of the Ecological Park of La Molina is an urban-landscape design project developed between the San Martín de Porres University, through the IVUC, the Institute of Housing, Urban Planning and Construction, and the Municipality of La Molina (7). This is the first ecological park in the city of Lima, located in a characteristic ecosystem such as Las Lomas, between 600-1000 m.a.s.l. (1). It is a natural area that is part of the hill system of Villa María del Triunfo, located in the Subtropical Coastal Desert ecoregion, and is part of the Regional Conservation Area ‘Sistema de Lomas de Lima’ (7). The City Council decided to open this space in 2022 to the public, as a 200-hectare area, designed to bring people closer to nature, through outdoor activities and environmental education about its fauna, flora and microclimates (1). Thus, citizens can enjoy a recreational area with multi-purpose spaces and sports circuits; a cultural area where workshops and an open-air amphitheatre are held; an ecological interpretation area with exhibition galleries and an interpretative route; and an administrative and control area (1). The park also envisages reforestation efforts in areas that are currently arid and infertile to convert them into green areas for the enjoyment of citizens (1). In 2023, conservation efforts were reinforced for an additional 50 hectares, due to the danger posed by encroachment and land trafficking (4).
Restoration of the Coastal Lagoon of El Laguito
The "Recuperación del Laguito" project aims to restore El Laguito, a coastal water body in Cartagena, Colombia, severely affected by sedimentation that blocks natural water exchange with the Caribbean Sea. This blockage has led to stagnant, low-oxygen water, degrading water quality and aquatic ecosystems (ref 1). The project seeks to restore El Laguito’s environmental and social functions by reestablishing seawater flow, reducing sediment impact, improving water quality, and reviving the ecosystem. Additionally, it aims to provide data to guide long-term solutions for sustainably managing this community resource (ref 1).
The project is a response to recurring ecological crises, such as frequent fish die-offs due to low oxygen levels. Local residents initially took matters into their own hands, manually attempting to reopen the channel. The formal intervention started following a 2019 directive from the Ministry of Environment and Sustainable Development, outlining a phased strategy: short-term installation of an axial pump for water exchange, medium-term studies for a permanent fix, and long-term construction plans (ref 3). Currently, the project involves using heavy machinery to clear sediment and allow seawater inflow, supported by the Gobernación de Bolívar, Cardique, and the Cartagena Mayor's Office. This phase serves as a transitional step towards a more sustainable, permanent solution (ref 2). The project’s impacts focus on ecological restoration. Short-term benefits include better oxygenation, reduced harmful algal blooms, and revived marine life. Long-term goals encompass sustainable water management, ecosystem stabilization, tourism enhancement, and the development of recreational and sports facilities in harmony with environmental conservation (ref 4).
The project is a response to recurring ecological crises, such as frequent fish die-offs due to low oxygen levels. Local residents initially took matters into their own hands, manually attempting to reopen the channel. The formal intervention started following a 2019 directive from the Ministry of Environment and Sustainable Development, outlining a phased strategy: short-term installation of an axial pump for water exchange, medium-term studies for a permanent fix, and long-term construction plans (ref 3). Currently, the project involves using heavy machinery to clear sediment and allow seawater inflow, supported by the Gobernación de Bolívar, Cardique, and the Cartagena Mayor's Office. This phase serves as a transitional step towards a more sustainable, permanent solution (ref 2). The project’s impacts focus on ecological restoration. Short-term benefits include better oxygenation, reduced harmful algal blooms, and revived marine life. Long-term goals encompass sustainable water management, ecosystem stabilization, tourism enhancement, and the development of recreational and sports facilities in harmony with environmental conservation (ref 4).
Urban regeneration of Depou CTP
The last large-scale park in Iași was opened in 1923, and since then, the city has lacked any significant new green spaces. With the European Union recommending at least 26 square meters of green space per resident and the city's increasing urban density, the need for a new park is undeniable.
To address this, the Municipality of Iași is launching its first major park project in over a century. The project aims to transform the current CTP depot (tram station) into a 4.5-hectare, accessible green space in a densely populated area with strong development potential. This new park is envisioned as a green oasis that will enhance residents' quality of life while promoting environmental sustainability and urban renewal.
The initiative has received widespread public support, with citizens proposing the creation of a local museum to honor the tram station’s historical significance—one of the oldest in the city, with over 100 years of history. A consultation process has been established, involving local residents, NGOs, and a group of experts, including urban planners, architects, and mobility and environment officials, all contributing to the planning stage. Public suggestions for the park include underground parking, recreational and exercise facilities, and a diverse range of vegetation. Ensuring accessibility for all citizens and visitors is also a key priority in the park's design.
The municipality has allocated 300,000 euros for a solutions contest to finalize the approach to redeveloping the tram station. (1, 2, 3, 4, 5, 8, 9)
To address this, the Municipality of Iași is launching its first major park project in over a century. The project aims to transform the current CTP depot (tram station) into a 4.5-hectare, accessible green space in a densely populated area with strong development potential. This new park is envisioned as a green oasis that will enhance residents' quality of life while promoting environmental sustainability and urban renewal.
The initiative has received widespread public support, with citizens proposing the creation of a local museum to honor the tram station’s historical significance—one of the oldest in the city, with over 100 years of history. A consultation process has been established, involving local residents, NGOs, and a group of experts, including urban planners, architects, and mobility and environment officials, all contributing to the planning stage. Public suggestions for the park include underground parking, recreational and exercise facilities, and a diverse range of vegetation. Ensuring accessibility for all citizens and visitors is also a key priority in the park's design.
The municipality has allocated 300,000 euros for a solutions contest to finalize the approach to redeveloping the tram station. (1, 2, 3, 4, 5, 8, 9)
Rike Park
Rike Park, centrally located on the riverbank of the Kura River, is one of the most recently developed Parks in Tbilisi. It was announced by the city hall in 2009 with the aim to increase the amount of accessible green space in the densely developed city center and stretches over an area of 7.5 ha (Ref. 1). Being the only location in the city where such a project could have been developed, it also serves as a pedestrian-friendly way to cross from the newer part of the city towards the old town via the adjacent "Peace Bridge" (Ref. 1,3). Next to its various amenities for recreation, the park has become a symbol of national identity through its design (Ref. 2). From above, one can identify the grid abstraction of the map of Georgia while in the center of the park lies a large Rose shaped mosaic, making a symbolic reference to the Rose Revolution (Ref. 3,5). Furthermore, Rike Park hosts several cultural festivities and artistic performances that invite the public to interact and socialize (Ref. 4).
Despite the park's success, its development has been criticised due to the city hall's exclusion of public consultations and transparency (Ref. 1).
Despite the park's success, its development has been criticised due to the city hall's exclusion of public consultations and transparency (Ref. 1).
Horta Nova Horticultural Park
The Horta Nova Urban Park, located in the Carnide parish (Lisbon), is a recently inaugurated green space that combines horticulture with community recreation. The Carnides neighbourhood is characterised by an inspiring history of overcoming hardship, with residents turning food shortages into opportunities by cultivating community gardens since the 70s. Currently, "the neighbourhood continues to be an example of solidarity, innovation and community spirit" (Ref. 2). In 2013, as a response to food scarcity caused during the post-Troika economic crisis, a group of local residents created an unauthorised vegetable garden overnight, on previously derelict space in the neighbourhood. Only in 2021 did the local authorities officially recognise the vegetable gardens, which since 2013 had operated under an informal agreement (Ref. 3). With the official establishment of the horticultural park, in addition, the park has a newly planted broad lawn, an open-air gym, and a dedicated dog park, creating a versatile space for residents (Ref 3).
Currently, this park features 80 vegetable plots, each with a dimension of 100 m2 per plot, attributed by the municipality through an official application process (Ref. 1). The park is a great reflection of the neighbourhood’s resilience and its history of small-scale citizen-oriented agricultural production that began as a response to social difficulties (Ref 1, 2).
Currently, this park features 80 vegetable plots, each with a dimension of 100 m2 per plot, attributed by the municipality through an official application process (Ref. 1). The park is a great reflection of the neighbourhood’s resilience and its history of small-scale citizen-oriented agricultural production that began as a response to social difficulties (Ref 1, 2).
Eastside Lake Baisha Park
At the beginning of the twenty-first century, Kunming’s urban planning faced major challenges, including fragmented development, environmental degradation, and limited green spaces (Ref 1). In response, the municipal government launched a series of strategic plans aimed at promoting high-quality urban development and environmental restoration.
Baisha Lake was identified as a key area in these strategies, with plans for Baisha Lake Park first highlighted in 2017 (Ref 2) and reaffirmed in the "Opinions on Supporting High-Quality Development in Kunming" in 2021 (Ref 2). To implement parts of this broader strategy, the government entered into public-private partnerships. In 2018, land development rights for parts of East Baisha Lake were granted to Dahua Group, on the condition that 40% of the area be reserved as green space and that ecological restoration efforts be undertaken (Ref 3, 4).
The Eastside Baisha Lake Park project, launched by Dahua Group in February 2023 (Ref 3, 5), is thus one component of this larger government-led urban renewal effort. The project follows the city's planning framework of “one lake, six zones, 46 scenic nodes” and includes 55 hectares of green space, with 40% designated as parkland. By the end of 2023, 6.5 hectares had been completed, and the south bank of the park opened to the public in September 2023 (Ref 3, 6).
The broader East Baisha Lake area's development was originally planned by the state-owned Kunming Urban Construction Company, but land rights were later transferred to Dahua Group. Thus, while a private developer is leading the construction, the project remains a part of Kunming’s publicly driven strategy to restore the lake and enhance urban livability.
Baisha Lake was identified as a key area in these strategies, with plans for Baisha Lake Park first highlighted in 2017 (Ref 2) and reaffirmed in the "Opinions on Supporting High-Quality Development in Kunming" in 2021 (Ref 2). To implement parts of this broader strategy, the government entered into public-private partnerships. In 2018, land development rights for parts of East Baisha Lake were granted to Dahua Group, on the condition that 40% of the area be reserved as green space and that ecological restoration efforts be undertaken (Ref 3, 4).
The Eastside Baisha Lake Park project, launched by Dahua Group in February 2023 (Ref 3, 5), is thus one component of this larger government-led urban renewal effort. The project follows the city's planning framework of “one lake, six zones, 46 scenic nodes” and includes 55 hectares of green space, with 40% designated as parkland. By the end of 2023, 6.5 hectares had been completed, and the south bank of the park opened to the public in September 2023 (Ref 3, 6).
The broader East Baisha Lake area's development was originally planned by the state-owned Kunming Urban Construction Company, but land rights were later transferred to Dahua Group. Thus, while a private developer is leading the construction, the project remains a part of Kunming’s publicly driven strategy to restore the lake and enhance urban livability.