Displaying 31 - 37 of 37

Rain Garden 2.0

The Rain Garden 2.0 project at Gdańsk University of Technology is an innovative green infrastructure initiative that manages and purifies rainwater while enhancing biodiversity. Part of the international NICE (Nature-based solutions for urban climate adaptation) initiative, this project serves as a living hub for testing solutions to address urban climate challenges. Opened in July 2023, the rain garden exemplifies a multifunctional approach to water retention, pollutant filtration, and urban biodiversity support. It is located behind the Faculty of Chemistry's Building C and has a capacity exceeding 11 cubic meters. (Ref. 1; Ref. 6)
The garden, designed by researchers from the Faculty of Civil and Environmental Engineering under the leadership of Prof. Magdalena Gajewska, captures rainwater runoff to prevent urban flooding and mitigate the strain on storm sewer systems. It absorbs pollutants, improves water quality, and supports over 1,100 hydrophyte plants, creating a natural solution for heavy rainfall events.
Beyond water management, the garden contributes significantly to urban biodiversity. Its moist soil and diverse plant species—designed to thrive in a range of conditions—help create habitats for insects and other small wildlife, boosting ecological resilience. (Ref. 1)
The rain garden’s innovative design consists of several key components. The first stage channels rainwater into reservoirs, reducing the energy of inflowing water. Subsequent parts purify the water through sedimentation processes, effectively filtering out pollutants such as those from streets and roads. Early research shows that these purification methods work exceptionally well, retaining a broad spectrum of pollutants before the water reaches the garden’s main basin. The project also benefits from cutting-edge laboratory equipment, allowing for detailed monitoring and analysis of water quality. (Ref. 1)

The Three Mile Creek Watershed Restoration

The Three Mile Creek Watershed project is part of the City Council watershed management plans (Ref 2) to stabilize the banks and the stream along the Twelve Mile Creek and Langan Park Lake, both of which drain into Three Mile Creek and Mobile Bay (Ref 1). The project aims to address the issues of degradation of the banks and destabilization of the creek, undercutting of sanitary sewer crossings and sedimentation in the creek and Langan Park Lake because of the increased water flow speed due to stormwater conveyance (Ref 2). Besides, major pollutants from run-off and sewage water contribute to the degradation of Three Mile Creek (Ref 5). Key initiatives include stabilizing the banks and streambed of the Twelve Mile Creek, dredging and restoring Langan Park Lake, and implementing instream structures to reduce erosion and protect infrastructure (Ref 2). The project also emphasizes reducing pollutants from stormwater runoff, improving water quality, and helping to protect the area’s estuarine and marine water resources (Ref 1). The project will increase natural habitat and contribute to regulating biodiversity by aiding in the abatement of invasive species such as the apple snail (Ref 2). It is expected to contribute to enhancing recreational access through the development of trails, educational programs, and water sports facilities. The overall goal is to restore ecological health, support flood control, improve the quality of life in the Mobile and Prichard communities and make the Three Mile Creek a recreational destination (Ref 6).

Griffeen Valley Park Wetlands

The Dublin Urban Rivers LIFE (DURL) project incorporates two interconnected wetlands in Griffeen Park as part of its broader initiative to improve water quality, natural water management and aquatic biodiversity in urban areas. These wetlands were specifically designed as a natural sewage system to treat wastewater from the surrounding areas, addressing a significant environmental issue known as "domestic misconnection." Domestic misconnection occurs when household appliances, such as washing machines, dishwashers, and kitchen sinks, are incorrectly linked to surface water drains rather than the sewage system. This leads to untreated wastewater being directly discharged into local waterways, contributing to contamination.
In the River Griffeen catchment, which includes approximately 12,000 dwellings and associated infrastructure, domestic misconnections are a considerable threat to water quality. The DURL project focuses on identifying and rectifying these misconnected appliances to ensure that wastewater is properly treated before entering the river. This process will not only improve water quality but will also provide flood alleviation and support healthier aquatic ecosystems in the area.
The project is aligned with broader environmental policies, including the River Basin Management Plan 2022-2027, the Water Framework Directive, the Climate Change Action Plan, the Floods Directive, and the draft Biodiversity Plan. One of the key strategies is to use a Geographic Information System (GIS) to streamline inspections for domestic misconnections, making the process faster and more cost-effective.
The constructed wetlands in Griffeen Park, with a standing water depth of approximately 30 cm, are planted with a variety of native Irish species. These wetlands offer a natural, sustainable solution to wastewater treatment, with the potential for similar applications across Europe. (Ref. 2, 4)

Recovery project for La Cienaga de la Virgen

The Ciénaga de la Virgen is a coastal wetland (cienaga) located on the north side of the border of the city of Cartagena, separated from the sea by La Boquilla's sandy beach. It has a maximum width of 4.5 km, a length of approximately 7 km, a water body area of about 22.5 km², and depths of up to 1.6 m. It is connected to the city's canal system (ref 1). The recovery project of la Cienaga de la Virgen, led by EPA Cartagena, is proposed as a strategy to address the issues affecting the water body, local communities, the economic activities that depend on it, and the ecosystems that regulate the water cycle and provide multiple services, many of them essential, with an integrated and global management approach based on the basin as the unit for planning and resource management (ref 14). Some of the main problems of the wetland are related to illegal settlements on its shore, as well as illicit dumping of waste, pollution by wastewater from the illegal settlements and deforestation of mangroves (ref 4). Key activities include stopping illegal occupation by relocating established families, improving roads, promoting reforestation, encouraging social participation, managing wastewater, and enhancing tidal systems (ref. 1 and 15).
Alonside the EPA, other stakeholders involved include the regional authority "Regional Autonomous Corporation of the Canal del Dique" (Cardique), with jurisdiction in the rural area, and Cartagena Mayor's Office, and the local community, involved in all the stages of the plan thanks to the “mesas de governance” or "governance tables", discussion spaces where different actors participate in the decision-making (ref 2).

Three Mile Creek Greenway Trail

The Three Mile Creek Greenway Trail project aims to transform the existing creek into a valuable community asset by developing a multi-use greenway trail (Ref 1). This greenway will connect various parts of the city through walking and biking paths, linking neighbourhoods, parks, and commercial districts while providing access to unique natural areas (Ref 2). The creek having been adandonned for decades (Ref 5), the initiative seeks to turn 3 Mile Creek (3MC) into a vibrant natural corridor that fosters recreation, education, and economic activities (Ref 1, Ref 2). The project aims also at reducing pollutants in the waterway, restoring natural stream channels, and maintaining flood protection (Ref 1).
The 3MC Greenway Trail is expected to become a key feature of Mobile's urban landscape, offering numerous benefits. These include enhancing community health, both mental and physical (Ref 2), and stimulating the local economy by increasing property values, tax revenues, and opportunities for recreation-related businesses and job development (Ref 2). Additionally, the trail will improve community connectivity by linking neighbourhoods, parks, and schools, thereby fostering a stronger sense of community and better access to public spaces (Ref 2). Lastly, the project will contribute to environmental restoration through stormwater management, pollution reduction, and natural habitat preservation (Ref 2).
The greenway is part of a plan to restore the health of the Three Mile Creek watershed and is the first major piece of a long-term Mobile Greenway Initiative (MGI) (Ref 4).

Deer River Coastal Marsh Stabilization and Restoration

The Mobile Bay National Estuary Program is one of 28 National Estuary Programs established by the United States Environmental Protection Agency, focused on safeguarding and restoring the water quality and ecological health of nationally significant estuaries (Ref 2). One of the four main areas of work of the project (Ref 2) is focused on Ecosystem Restoration and Protection (ERP), aiming at restoring and protecting ecosystem function and services (Ref 4). One of the projects implemented in 2023-2024 in the ERP category is the Deer River Coastal Marsh Stabilization and Restoration project, aiming at restoring and protecting the saltwater marshes of the area (Ref 8).
The issues faced in the Deer River Shoreline are shoreline recession, marsh deterioration, and loss of natural function from erosion, apparently caused by heavy storms, tidal impacts, and wakes from cargo ships entering or exiting the Theodore Ship Channel (Ref 8). Indeed, the saltwater marshes of this area have started to erode at a rapid rate, up to 12 feet per year (Ref 7).
The project aims to enhance the natural function of ecosystem services to improve the area's resilience. It will restore the eroded marsh by creating offshore structures to protect the shoreline and attenuate the waves. The project also aims to restore the water quality of the Deer River by dredging it out, thus improving the water flow. The material dredged out will be used to nourish the marsh (Ref 9).

Africatown Heritage House Bioswale

The Africatown Heritage House Bioswale is a gently sloping green space with multiple functions which include catchment of runoff water and filtration of pollution in the runoff water (Ref 2), erosion control (Ref 2), and creation of habitat for biodiversity (Ref 1). It also has an educational purpose for students and the local community (Ref 2) and contributes to overall beautification (Ref 5).
The Bioswale was built by Birmingham-Southern College’s Environmental Center (Ref 6) and developed through the collaboration between the Mobile County Commission, the Mobile Area Lodging Association, Mobile County Training School, Mobile County Training School Alumni Association, and the National Academies of Science (NAS) Gulf Research Program (Ref 2). The project aims to address heavy rainwater management (Ref 5) and drainage issues (Ref 3).