Metropolitan Lineal Park
The Metropolitan Linear Park is a project initiated by the national government of Bolivia, funded by the Inter-American Development Bank (IDB) (1-8). The proposed park will be located along a disused railway corridor between the cities of La Paz and El Alto, spanning 18.2 km (8, p. 8). The project involves the construction of a linear park, divided into five sections, each with distinct objectives, uses, and designs (8, p. 9). This large-scale initiative aims to improve access to public spaces in La Paz and El Alto, enhance connectivity between the two cities, protect surrounding biodiversity and natural spaces, and strengthen resilience to and mitigate the effects of climate change (3 & 8, pp. 11-12).
To achieve these goals, the project design includes outdoor sports and recreational facilities, pedestrian and cycling circuits, as well as the restoration of parks, squares, and public spaces adjacent to the park corridor (8, p. 9). Some features include balcony corridors, flower and food-producing urban gardens, and viewpoints (5). The project also plans for the re-vegetation of the area with native species and aims to stop the environmental degradation of surrounding natural environments, such as the Pura Pura forest, which has been suffering from ongoing deforestation and waste dumping (8, p. 9). These efforts are expected to increase and support biodiversity in the area (7 & 8, p. 12).
Additionally, the project emphasizes social inclusion, with policies designed to incorporate women, indigenous populations, and persons with disabilities (8, pp. 7-8). The park is intended to raise awareness about climate change and biodiversity, ultimately improving the quality of life and health of nearby residents and the citizens of La Paz and El Alto (8, p. 13).
To achieve these goals, the project design includes outdoor sports and recreational facilities, pedestrian and cycling circuits, as well as the restoration of parks, squares, and public spaces adjacent to the park corridor (8, p. 9). Some features include balcony corridors, flower and food-producing urban gardens, and viewpoints (5). The project also plans for the re-vegetation of the area with native species and aims to stop the environmental degradation of surrounding natural environments, such as the Pura Pura forest, which has been suffering from ongoing deforestation and waste dumping (8, p. 9). These efforts are expected to increase and support biodiversity in the area (7 & 8, p. 12).
Additionally, the project emphasizes social inclusion, with policies designed to incorporate women, indigenous populations, and persons with disabilities (8, pp. 7-8). The park is intended to raise awareness about climate change and biodiversity, ultimately improving the quality of life and health of nearby residents and the citizens of La Paz and El Alto (8, p. 13).
Cypress Shore Park
A new park is being planned for the Cypress Shores area in Mobile (Ref 1). Five civil engineering students from the University of South Alabama contributed to the design of the park (Ref 1). This collaboration offers students practical experience while providing city designers with innovative ideas for the site (Ref 2). The design emphasizes sustainability and cost-effectiveness (Ref 3). The project will feature a small park and boat launch on a 5.6-acre plot (Ref 1) located within a residential neighbourhood (Ref 3).
The park's societal goal is to improve public access to Halls Mill Creek, giving the community a new way to enjoy the waterway, and this focus aligns with the Mobile Bay National Estuary Program (MBNEP) goals (Ref 3). Historically, the property was used as a shipyard with a nearby railroad crossing (Ref 1), marking its transition from an industrial site to a public park.
Several amenities have been identified for the park’s development, including a boat ramp and kayak launch, a boardwalk adapted to sea-level rise, a pavilion and gazebo designed for flood resilience, a wetland nature trail with solar lighting and educational signage, and composting toilet restroom facilities (Ref 3). An armoured shoreline will be implemented to withstand medium water currents, and wave action will be constructed. Additionally, a living shoreline will be restored with local plants (Ref 3). While the project is still in its preliminary design phase, the timeline for completion is estimated at 12 to 18 months (Ref 1). The designers highlighted a potential trade-off, noting that an influx of visitors to the park could disturb the surrounding residential area (Ref 3).
The park's societal goal is to improve public access to Halls Mill Creek, giving the community a new way to enjoy the waterway, and this focus aligns with the Mobile Bay National Estuary Program (MBNEP) goals (Ref 3). Historically, the property was used as a shipyard with a nearby railroad crossing (Ref 1), marking its transition from an industrial site to a public park.
Several amenities have been identified for the park’s development, including a boat ramp and kayak launch, a boardwalk adapted to sea-level rise, a pavilion and gazebo designed for flood resilience, a wetland nature trail with solar lighting and educational signage, and composting toilet restroom facilities (Ref 3). An armoured shoreline will be implemented to withstand medium water currents, and wave action will be constructed. Additionally, a living shoreline will be restored with local plants (Ref 3). While the project is still in its preliminary design phase, the timeline for completion is estimated at 12 to 18 months (Ref 1). The designers highlighted a potential trade-off, noting that an influx of visitors to the park could disturb the surrounding residential area (Ref 3).
Masthugg Park
Masthuggsparken is a planned park in the Masthuggskajen district, which is undergoing development and construction. The park will measure about 2000 m2, and serve as a green oasis and meeting place for locals. It will have ameneties such as benches and areas for play, and a noise barrier against a large nearby road. The park will connect to the adjacent square and street, making it accessible to visit. The street will be renovated to have more trees and plants, increasing green connectivity in the district. The park will be surrounded by trees and other plants, which are planted to promote biodiversity and be adapted to a changing climate [Ref. 1-5, 7]. The park is at a low point, where up to 800 m3 of stormwater will flow during heavy rainfall, reducing flood risk in the surroundings [Ref. 1, 2, 6]. The Masthuggskajen district has a sustainability program, establishing goals for green environments which the park will contribute to. Green areas should be accessible to the entire district and provide ecosystem services such as rainwater management, climate adaptation, biodiversity and recreation. The program was created by the City of Gothenburg in collaboration with construction companies active in the area and was supported by Citylab Action, a national competence program in sustainable urban development [Ref. 7]. The City of Gothenburg is the primary responsible for the park, which will be constructed between 2025 and 2026 [Ref. 1, 2, 4].
Tree Plantation Month
The "Tree Plantation Month" is an annual national initiative in Romania, organized by the Ministry of Environment, Water, and Forests through the National Directorate of Forests. This initiative focuses on afforestation, forest regeneration, and raising awareness about the ecological benefits of forests, while promoting sustainable behaviors (4, 9, 10). Having been in place for 60 years, the program has recently aligned with the principles outlined in the 1991 Paris Declaration on the Sustainable Development of Forests (10). At the national level, the initiative is regulated with overarching goals aimed at protecting and sustainably managing Romania's forests (9). The program allows for the involvement of various actors, including public institutions, municipalities, NGOs, and schools, who collaborate with regional forestry directorates to implement local activities (4).
In 2019, as part of this initiative in Iași, the Asociația Tineretul Ortodox Român Iași (ATOR), a youth-led religious association, actively participated in one of the campaigns . They planted 1,000 tree saplings in the Moara de Vânt district, an area that had suffered from deforestation and was prone to landslides (1, 2). The afforestation efforts were designed to address these environmental challenges by stabilizing the soil, reducing the risk of overflow and flooding, maintaining soil moisture, and regulating extreme temperatures (1). To ensure long-term success, the saplings were regularly monitored, and restoration efforts were carried out in cases where the trees were affected by fires or drought (3).
In 2019, as part of this initiative in Iași, the Asociația Tineretul Ortodox Român Iași (ATOR), a youth-led religious association, actively participated in one of the campaigns . They planted 1,000 tree saplings in the Moara de Vânt district, an area that had suffered from deforestation and was prone to landslides (1, 2). The afforestation efforts were designed to address these environmental challenges by stabilizing the soil, reducing the risk of overflow and flooding, maintaining soil moisture, and regulating extreme temperatures (1). To ensure long-term success, the saplings were regularly monitored, and restoration efforts were carried out in cases where the trees were affected by fires or drought (3).
Revitalizing the Huveaune river and its biodiversity
The project to revitalize the Huveaune River and its biodiversity is taking place in Aubagne, a city within the Marseille Metropolitan area. For a long time, the river received little attention, constrained by urbanization, and was even covered for several hundred meters. Urbanization and the construction of a road have made the floodplain more susceptible to flooding (Ref 2). The initiative aims not only to restore the Huveaune and its environment but also to strengthen the connection between residents and the river (Ref 1) while reducing flood risk as a critical objective (Ref 1).
The challenge is transforming the area into a higher-quality environmental space with resilient ecosystems. A diagnostic conducted during the project's design phase revealed the site's degraded state, including the presence of invasive species, steep banks unsuitable for riparian vegetation, poor waterway conservation, and disrupted ecological continuity (Ref 2).
Key actions include revitalizing the river and its biodiversity, removing artificial banks, and creating new meanders to give the river a more natural shape. Diversifying flow patterns will create habitats for aquatic and fish species by varying water heights and flow speeds. This involves increasing the river's sinuosity and varying the width of the minor riverbed (Ref 2). Additional steps include planting trees and shrubs adapted to the Mediterranean climate with low water needs (Ref 2). To bring residents closer to the river, plans include creating walking and cycling routes, sports equipment, educational panels, and useful visitor facilities such as benches, water points, and restrooms (Ref 3).
The challenge is transforming the area into a higher-quality environmental space with resilient ecosystems. A diagnostic conducted during the project's design phase revealed the site's degraded state, including the presence of invasive species, steep banks unsuitable for riparian vegetation, poor waterway conservation, and disrupted ecological continuity (Ref 2).
Key actions include revitalizing the river and its biodiversity, removing artificial banks, and creating new meanders to give the river a more natural shape. Diversifying flow patterns will create habitats for aquatic and fish species by varying water heights and flow speeds. This involves increasing the river's sinuosity and varying the width of the minor riverbed (Ref 2). Additional steps include planting trees and shrubs adapted to the Mediterranean climate with low water needs (Ref 2). To bring residents closer to the river, plans include creating walking and cycling routes, sports equipment, educational panels, and useful visitor facilities such as benches, water points, and restrooms (Ref 3).
The Great Aygalades Park
The Grand Parc des Aygalades project involves the creation of a 14-hectare metropolitan park (connecting Aygalades Park with Bougainville Park and François Billoux Park) that will connect the northern neighbourhoods of Marseille to the port located further south (Ref 1). This project is part of the green conversion of Marseille's northern districts, historically among the most disadvantaged areas in France (Ref 1). The Grand Parc des Aygalades project will enhance the city's greenery, reduce flood risks, create cool zones, restore and develop biodiversity, and significantly improve residents' quality of life and air quality (Ref 1, Ref 2). The environmental and social challenges include reconnecting the populations of these neighborhoods to green spaces, services, education, sports opportunities (Ref 2).
The park project includes redesigning urban infrastructure to improve rainwater absorption and reduce flood risks, addressing the issue of impermeable and artificialized soils that exacerbate flooding during heavy rainfall (Ref 1). It also involves renaturing a 17-kilometre-long stream currently buried under railway tracks, improving flood management and rainwater drainage (Ref 1, Ref 4). The project will also convert a heavily degraded former industrial site, requiring the rehabilitation of polluted soils (Ref 1). Additionally, creating green corridors aims to mitigate the heat island effect, particularly severe in these northern districts due to the high concentration of buildings and concrete surfaces, and the lack of green spaces. Public participation will be encouraged through information meetings, thematic workshops, and an online platform for submitting ideas and feedback (Ref 4).
The park project includes redesigning urban infrastructure to improve rainwater absorption and reduce flood risks, addressing the issue of impermeable and artificialized soils that exacerbate flooding during heavy rainfall (Ref 1). It also involves renaturing a 17-kilometre-long stream currently buried under railway tracks, improving flood management and rainwater drainage (Ref 1, Ref 4). The project will also convert a heavily degraded former industrial site, requiring the rehabilitation of polluted soils (Ref 1). Additionally, creating green corridors aims to mitigate the heat island effect, particularly severe in these northern districts due to the high concentration of buildings and concrete surfaces, and the lack of green spaces. Public participation will be encouraged through information meetings, thematic workshops, and an online platform for submitting ideas and feedback (Ref 4).
Dog river watershed management plan
The Dog River Watershed Restoration project aims to protect and enhance the chemical, biological, and cultural integrity of the Dog River Watershed in Mobile County, Alabama (Ref 1). Guided by the Dog River Watershed Management Plan (WMP), the project addresses key issues such as pollution, litter, stormwater management, and habitat degradation (Ref 2). Funded by the National Fish and Wildlife Foundation's Gulf Environmental Benefit Fund and completed in partnership with stakeholders, the project focuses on implementing targeted restoration activities to improve water quality, protect critical habitats, and increase public awareness and access to the watershed (Ref 2). The Dog River Watershed faces significant hazards, including pollution, sedimentation, erosion, and the impacts of urban development (Ref 3). These challenges are intensified by the watershed’s role as an urban estuary, where land use heavily influences water quality and habitat conditions (Ref 3). To mitigate these threats, the project incorporates pollution prevention measures, shoreline restoration efforts, and community engagement initiatives (Ref 4). By prioritizing scientifically supported actions and aligning with broader environmental goals, the project seeks to restore ecological balance and ensure the long-term health and resilience of the watershed and its connected ecosystems in Mobile Bay (Ref 4).
The Watershed Management Plan for the Dog River Watershed is a key component of the Mobile Bay Shore Habitat Conservation and Acquisition Initiative, which focuses on acquiring, restoring, and preserving habitats and wildlife species affected by the environmental disasters of the Deepwater Horizon oil spill that occurred in 2010 (Ref 6). The project spans three critical areas: 300 acres in the Dog River Watershed (as detailed in this project profile), 450 acres within the Three Mile Creek Watershed, and 40 acres in the Garrows Bend Watershed (not in focus here) (Ref 7).
The Watershed Management Plan for the Dog River Watershed is a key component of the Mobile Bay Shore Habitat Conservation and Acquisition Initiative, which focuses on acquiring, restoring, and preserving habitats and wildlife species affected by the environmental disasters of the Deepwater Horizon oil spill that occurred in 2010 (Ref 6). The project spans three critical areas: 300 acres in the Dog River Watershed (as detailed in this project profile), 450 acres within the Three Mile Creek Watershed, and 40 acres in the Garrows Bend Watershed (not in focus here) (Ref 7).
The Järnvåg Park
The park called Järnvågsparken will be constructed in the developing neighbourhood of Masthuggskajen as the main green space of the area, measuring about 8000 m2. The park will offer recreational activities for people living and working in the area, with spaces designated for rest, meetings, picnics, walking and play. For example, there will be a large playground, many different places to sit, grass lawns and a space to host cultural events in [Ref. 1-4]. The park will also be designed to manage stormwater and reduce flood risk [Ref. 5, 6]. The park will be built over an existing highway, turning it into a tunnel while reconnecting the new neighbourhood. The remaining future park area next to the road are currently parking spaces [Ref. 1, 4, 5]. The adjacent streets will also see more greening, increasing the connectivity of green spaces and mobility [Ref. 4-6]. The location on top of a tunnel limits the soil depth of the park, but the ambition is still to house a rich plant and animal life, including trees, providing ecosystem services [Ref. 1-6]. The project is managed by the City of Gothenburg [Ref. 1, 7].
The Three Mile Creek Hydrological Restoration
The Three Mile Creek Hydrological Restoration project is taking place in one historic channel of the Three Mile Creek, located east of Dr. Martin Luther King, Jr. Avenue, and covering approximately 1,800 linear feet (Ref 3). This project, led by the City of Mobile, aims to remove sediment from the stream channel. This segment of the Creek was bypassed with a straight channel in the early 1980s to control flooding in the area, thus accelerating the accumulation of sediments in the historic channel (Ref 1).
The project's goal is to restore and maintain the natural flow to the historic channel and create a connection to the City and County's Blueway initiatives (Ref 3). This will improve habitat conditions and water quality and help to protect the area’s estuarine and marine water resources (Ref 8). It will also contribute to revitalizing the Three Mile Creek Watershed and provide increased recreational opportunities for citizens, like kayaking and canoeing (Ref 6). Construction work occurred in 2022 and 2023 (Ref 3).
The Three Mile Creek Hydrological Restoration is a key component of the Mobile Bay Shore Habitat Conservation and Acquisition Initiative, which focuses on acquiring, restoring, and preserving habitats, including riparian, wetland, and upland areas that support various fish and wildlife species affected by the environmental disasters of the Deepwater Horizon oil spill that occurred in 2010 (Ref 1). The project spans three critical areas: 450 acres within the Three Mile Creek Watershed (as detailed in this project profile), 300 acres in the Dog River Watershed, and 40 acres of bay shore property in the Garrows Bend Watershed (with the latter two areas being part of separate initiatives) (Ref 4).
The project's goal is to restore and maintain the natural flow to the historic channel and create a connection to the City and County's Blueway initiatives (Ref 3). This will improve habitat conditions and water quality and help to protect the area’s estuarine and marine water resources (Ref 8). It will also contribute to revitalizing the Three Mile Creek Watershed and provide increased recreational opportunities for citizens, like kayaking and canoeing (Ref 6). Construction work occurred in 2022 and 2023 (Ref 3).
The Three Mile Creek Hydrological Restoration is a key component of the Mobile Bay Shore Habitat Conservation and Acquisition Initiative, which focuses on acquiring, restoring, and preserving habitats, including riparian, wetland, and upland areas that support various fish and wildlife species affected by the environmental disasters of the Deepwater Horizon oil spill that occurred in 2010 (Ref 1). The project spans three critical areas: 450 acres within the Three Mile Creek Watershed (as detailed in this project profile), 300 acres in the Dog River Watershed, and 40 acres of bay shore property in the Garrows Bend Watershed (with the latter two areas being part of separate initiatives) (Ref 4).
D'Olive Watershed Restoration
The D'Olive Creek Restoration project is designed to address the significant environmental challenges facing the D’Olive Creek Watershed and its tributaries (Tiawasee and Joe’s Branch), primarily caused by increased urbanization. Over the last several decades, the area has experienced severe erosion, sedimentation, and habitat degradation due to stormwater runoff from new residential and commercial developments. This runoff has led to stream channel instability, loss of wetlands, and impaired water quality in both D'Olive Creek and Mobile Bay, threatening aquatic and wildlife habitats (Ref 2).
The project involves restoring degraded streams and implementing management measures to reduce the downstream impacts within the watershed. Key activities include stormwater retrofits, stream restorations, and continuous monitoring. These efforts aim to stabilize stream segments and significantly reduce sediment loading into the northeast quadrant of Mobile Bay. This is crucial for improving water quality and clarity, which is necessary for re-establishing submerged aquatic vegetation (SAV) beds that serve as critical nursery areas for shellfish and finfish (Ref 1). By using natural materials like rock and living plants, the project also seeks to create a sustainable and ecologically balanced watershed system (Ref 3).
The anticipated outcomes include enhanced water quality in D'Olive Creek and Mobile Bay, reduced erosion and sedimentation, and the restoration of vital habitats, which will contribute to the region's overall ecological health (Ref 1, 3). This restoration project is part of a broader strategy outlined in the 2002 Comprehensive Conservation Management Plan for the Mobile Bay Estuary (Ref 1).
The project involves restoring degraded streams and implementing management measures to reduce the downstream impacts within the watershed. Key activities include stormwater retrofits, stream restorations, and continuous monitoring. These efforts aim to stabilize stream segments and significantly reduce sediment loading into the northeast quadrant of Mobile Bay. This is crucial for improving water quality and clarity, which is necessary for re-establishing submerged aquatic vegetation (SAV) beds that serve as critical nursery areas for shellfish and finfish (Ref 1). By using natural materials like rock and living plants, the project also seeks to create a sustainable and ecologically balanced watershed system (Ref 3).
The anticipated outcomes include enhanced water quality in D'Olive Creek and Mobile Bay, reduced erosion and sedimentation, and the restoration of vital habitats, which will contribute to the region's overall ecological health (Ref 1, 3). This restoration project is part of a broader strategy outlined in the 2002 Comprehensive Conservation Management Plan for the Mobile Bay Estuary (Ref 1).

