Regeneration of the Main Square
The project of regeneration of Nürnberg's main market square and the resulting increase in attractiveness of the area is a result of negotiations between local authorities, citizens and landscape architects. It aims at increasing greenery in the city centre and its overall environmental and aesthetic conditions (1).
The status of the project is unclear, the project might have been cancelled as there is no indication of any interventions taking place.
The status of the project is unclear, the project might have been cancelled as there is no indication of any interventions taking place.
Weaver Park
Weaver Park is was built on an area of 0.6 ha in the Liberties area in Dublin. It is one of the developments that form a part of the Liberties Greening Strategy. The park’s purpose was to address the lack of green space in the area, to provide a place for skateboarding and other recreational activities, and a place for relaxation and community events. (Ref. 1; Ref. 5)
Reconstruction of the Southern Bank of the Schütt Island
The Reconstruction of the Southern Bank of Schütt Island is the starting point of the regeneration of the Old City of Nurnberg. Within the project, the access to water and recreational functions of the river banks were improved. (1) The project was completed on an 1800 square meter large area, which includes open meadow areas, a 170-meter-long bank terrace, trees, and benches. (6) Public participation through co-planning and consultation was also involved in the planning process. (1)
Flood channel to alleviate flood risk
The city of Wuppertal participates as a model region in the joint research project SAMUWA which aims at developing planning instruments which combine urban drainage with urban and open space development measures. With regards to the work package C.1: open space design strategies for a water sensitive city, one focus area and proposed measure, namely the "Varresbecker" flood channel is of special interest since it has been subject to comprehensive implementation plans in Wuppertal so that its implementation can be expected in the next years (Ref. 1, 2, 4 and 5). Alongside the water channel, a recreational area will be created with information to raise awareness about water management issues and climate change. (Ref. 2)
Green roofs, walls and gardens in the Podlasie Opera
The Podlasie Opera and Philharmonic – European Art Centre in Białystok ("green opera") in Białystok, is known for its green roofs, green walls and extensive gardens, which perfectly harmonize with the surroundings. The green area serves as a platform for cultural events and successfully promotes the city. Opera gardens are divided into several levels with lawns, walking paths, bridges, sculptures, and small ponds. Different green elements of the building reduce heat effect and noise, increase the thermal insulation of the building, improve local biodiversity and limit rain drainage to the city centre [1].
Plaza de Levante's Vertical Garden
As part of a larger project, this project aimed at creating a vertical garden in the Levante Square, in the Deustro neighborhood, the city of Bilbao. The intervention was initiated by the Bilbao's municipality in 2016 and aimed at creating a green area that was a bit unconventional and artistic at the same time. The landscape design incorporates local elements such as the trawlers, the cliffs of the Cantabrian coast and the local architecture, integrating nature and tradition (Ref 1).
Zorrotzaurre new flood proof district
Zorrotzaurre is an artificial peninsula located within the Deusto district of Bilbao, Spain. It was formed during the 1950s and the 1960s, when a canal was built to facilitate navigation in the estuary of Bilbao. The Zorrotzaurre project is the latest major urban renewal project to commence in Bilbao. It is an integral and sustainable plan that recuperates a currently derelict site to convert it into a new quarter, and which also includes a flood protection system with water tanks to retain water and a flood protection barrier (Ref 1)
Green elements, the Poligono Levante reurbanization
The re-urbanization of the Poligono de Levante neighbourhood included the creation of two large urban parks to form a green area of 47 722 m2 and several environmental considerations such as a bridge for fauna (Ref 1), as it is a strategical zone of Palma . It is a combination of different initiatives, some of which include green elements (Ref 1 and Ref 3).
Urban Orchards of Mallorca
The government of Mallorca promotes orchards, as part of an ecological movement in Spain. As a result, five orchards were constructed, reclaiming abandoned urban spaces by the Mallorca city government in 2010.
The project has three pillars: strengthening social cohesion and inclusion, creating opportunities for education and for recreation. They were also constructed with pensioners in mind (Ref 2).
There would be an annual draw to give to distribute the orchards. However, this got delayed since 2013. In 2019, the municipality took back the property from the previous owners, and one of the orchards was taken from the list of orchards due to its bad conditions (Ref 5). In 2020, there was going to be a new draw for the distribution of orchards with new focus groups requirements but due to Covid19, this project has been paused (Ref 5).
The project has three pillars: strengthening social cohesion and inclusion, creating opportunities for education and for recreation. They were also constructed with pensioners in mind (Ref 2).
There would be an annual draw to give to distribute the orchards. However, this got delayed since 2013. In 2019, the municipality took back the property from the previous owners, and one of the orchards was taken from the list of orchards due to its bad conditions (Ref 5). In 2020, there was going to be a new draw for the distribution of orchards with new focus groups requirements but due to Covid19, this project has been paused (Ref 5).
Urban Forest
The Urban Forest project represents an increase of urban trees in the city. There will be two phases of this project. In the first, it consists of a transformation of an eye-sore and abandoned space, around previous Canodrome, into a large urban forest (Ref 1, 9). The second one will be located in the land of the velodrome of Es Tirador. This projec has been delaid due to unforeseen costs (Ref 10).