Revealing the Roch project
The Revealing the Roch project uncovered two sections of the River Roch to expose a historic bridge which had been hidden for over 100 years (ref 1). Re-opening and deculverting the River Roch and bridge has a tangible benefit by reducing flood risk for the town (ref 4). The scheme, which is a key part of Rochdale town centre’s ongoing regeneration programme will help reduce flood risk in the town center and create educational opportunities. The project also includes enhancing the natural heritage of the river by introducing features that encourage river vegetation and creatures to re-establish themselves (ref 5). The project has since led to a wildlife boost, with brown trout, bullhead fish, heron and kingfishers all being seen since construction work to open the river began. (Ref 3). As the River Roch connects to River Mersey which empties into the North Atlantic ocean, this intervention addresses marine ecosystem restoration as well.
Greenbelt
Most of the open spaces around Munich are designated as green belt areas and are being used mostly for agricultural purposes. As a lead project of its green strategy, the city now aims to protect these areas and to upgrade their quality by cooperating with local farmers and promoting a shift to extensive and ecological farming, developing habitats, corridors as well as a network of cycle tracks and footpaths for recreation (Reference 3, 4). The city supports the farmers with advisory services, but also with the organization of the implementation of the ecological projects. The farmers are motivated to join by being able to use labels such as "Potatoes from the Greenbelt of Munich" on their products. (Reference 3) The initiative also includes herb gardens, provided by farmers and rented by citizens. (Reference 1) A further project included in the initiative is the "Münchner Ökokonto, a biodiversity offsetting principle by which the former low moor complex of the West of Munich is being renaturalized on 28 areas with a total area of 67 ha. (Reference 5)
Urban eco-village New Bolton Woods
New Bolton Woods Ltd is a development partnership between the regeneration company Urbo and Bradford Council (ref5). This project aims to create a new sustainable urban neighbourhood, linked to the existing Bolton Woods. As the majority of the proposed development is situated on land which falls within Flood Zone, a range of measures including the raising of ground floor levels, and incorporation of sustainable drainage techniques will be used to manage runoff.
The project intends to provide a series of well landscaped, high-quality open areas and parks for the community. There is potential for a long term phased canal restoration (ref. 1). The second stage,145 houses are currently under construction on the slopes off Poplars Park Avenue, overlooking Canal Road, and are due to be completed by 2021 (ref 6). West Yorkshire Ecological Service raised concerns that the development would lead to a loss of woodland (ref 6).
The project intends to provide a series of well landscaped, high-quality open areas and parks for the community. There is potential for a long term phased canal restoration (ref. 1). The second stage,145 houses are currently under construction on the slopes off Poplars Park Avenue, overlooking Canal Road, and are due to be completed by 2021 (ref 6). West Yorkshire Ecological Service raised concerns that the development would lead to a loss of woodland (ref 6).
Arcosur Neighborhood Development
Arcosur is a new residential neighbourhood project approved for construction in 2008 after the hosting of the Zaragoza Expo 2008. In its structure, it seeks to develop a space of 4 500 000 m2 into around 21 000 new homes, and out of which around 1 500 000 m2 will be squares, parks, and other green spaces. These green spaces would connect the neighbourhood and ensure all residents have access to green areas. (Ref. 1)
Connswater Community Greenway
The Connswater Community Greenway has created a 9km linear park project in East Belfast following the course of the Connswater, Knock and Loop Rivers, connecting the open and green spaces. As part of the project the Connswater River will be cleaned and brought back to life. The Greenway will create attractive, safe and accessible parkland for recreation and community activities. The project will improve the quality of life for the people of east Belfast as a whole new greener environment will emerge. (Ref1)
Connswater Community Greenway is a visionary urban regeneration project that is transforming East Belfast by combining improved flood protection with the creation of public spaces and pedestrian/ cycle routes that connect communities. (Ref 6)
Connswater Community Greenway is a visionary urban regeneration project that is transforming East Belfast by combining improved flood protection with the creation of public spaces and pedestrian/ cycle routes that connect communities. (Ref 6)
The Carbon Landscape
The Carbon Landscape is a pioneering project in landscape restoration in Wigan, Warrington and Salford. Led by the Lancashire Wildlife Trust, it will revitalize a landscape left devastated by decades of coal-mining and peat extraction (Ref 5). It works to restore key habitats and reconnect local people with their unique natural heritage, preserving it for future generations. The restoration of the peat base to lowland raised bog provided an opportunity for carbon sequestration and storage (Ref 1). There is a strong vision to reconnect local people with their rich natural heritage, creating opportunities and a sense of pride in the local area (Ref 4).
Cleavleys Wet Woodland renaturalisation
City of Trees is an innovative movement set to re-invigorate Greater Manchester’s landscape by transforming underused woodland and planting a tree for every person who lives there (ref 1). Manchester City of Trees had undertaken work to improve water quality of a tributary of Worsley Brook through channel naturalisation and create wet woodland in the Cleavleys Nursery. The discharge from the tributary caused water quality failures in Worsley Brook under the Water Framework Directive (WFD) (Ref 3). This project allowed the stream to take a more natural course through the woodland and the waterlogged woods provide habitats to species and remedy these water quality issues (Ref 3).
South Saint-Jacques District
The South Saint-Jacques district is a residential area. A public housing project in the district incorporates careful landscape planning to promote social interaction, increase biodiversity, and better manage rainwater. It includes green spaces, collective area for free initiative from the community, swales and planted basins for rainwater drainage (Ref. 1).
Drainage system of Győr-Szabadhegy, Traktoros Street
In 2010 a new drainage system was installed in Traktoros Street that solved the disposal of surface-water so that bigger storms would not cause damages in the area and separates rainwater from the sewage. The rainwater is directed to the lake in Adyváros. The project was the third phase of the complex reconstruction of draining in the Szabadhegy neighbourhood. While the first two phases (the construction of the main pipelines and drainage of Pannónia Street; drainage of Vak Bottyán Street and paving streets) were financed by the municipality, the third phase was implemented with the help of the EU. (Reference 1, 2)
Warwickshire Avon Catchment Partnership
The catchment includes the River Avon (a major resource for recreational activities and public water supply) and its various tributaries. Coventry is the largest urban area in the catchment, and the catchment has a high value for wildlife. (Ref. 1)
Main priorities include engaging communities to take ownership of their local water environment, reducing urban and rural pollution; delivering enhancement projects in the 3 Priority Areas (e.g. Coventry Brooks) and Returning water corridors to a near-natural state. (Ref. 2). The Catchment Based Approach (CaBA) is a Government policy framework that empowers local action to improve the water environment through community partnerships. A renewed focus on the catchment-based approach has led to Catchment Partnerships (i.e. The Warwickshire Avon Catchment Partnership) being set up to drive local delivery of these projects. (Ref. 3)
Main priorities include engaging communities to take ownership of their local water environment, reducing urban and rural pollution; delivering enhancement projects in the 3 Priority Areas (e.g. Coventry Brooks) and Returning water corridors to a near-natural state. (Ref. 2). The Catchment Based Approach (CaBA) is a Government policy framework that empowers local action to improve the water environment through community partnerships. A renewed focus on the catchment-based approach has led to Catchment Partnerships (i.e. The Warwickshire Avon Catchment Partnership) being set up to drive local delivery of these projects. (Ref. 3)

