Management of Uricani Natural Areas
This initiative focused on creating a management plan for the Uricani forest, a protected area located near Iasi. Designated as both a nature reserve and a Natura 2000 site, the forest is crucial for its "Dacia oak & hornbeam forests" habitat and the presence of the stag beetle, the largest beetle in Romania and Europe.
Despite existing nature protection designations, the environmental NGO "Asociația Ecoturistică Prietenii Pădurii Bălțătești" recognized the need for an updated management plan. With European funding, the NGO developed a model plan for protected areas in Neamt and Iasi counties, including Uricani forest.
The NGO conducted monitoring activities in cooperation with forestry directorates to assess habitat conditions and stag beetle populations. The goal was to identify risks and requirements for species conservation and design appropriate management actions. Additionally, the organization aimed to promote the area's tourism potential and conduct awareness-raising activities with local communities and schools.
The completed management plan, developed through public consultation and approved by the Romanian environmental ministry, included measures for natural habitat regeneration, ensuring suitable conditions for the stag beetle, addressing illegal logging, pasturing, and waste disposal, and establishing information points and educational activities for the community. (1-7)
Despite existing nature protection designations, the environmental NGO "Asociația Ecoturistică Prietenii Pădurii Bălțătești" recognized the need for an updated management plan. With European funding, the NGO developed a model plan for protected areas in Neamt and Iasi counties, including Uricani forest.
The NGO conducted monitoring activities in cooperation with forestry directorates to assess habitat conditions and stag beetle populations. The goal was to identify risks and requirements for species conservation and design appropriate management actions. Additionally, the organization aimed to promote the area's tourism potential and conduct awareness-raising activities with local communities and schools.
The completed management plan, developed through public consultation and approved by the Romanian environmental ministry, included measures for natural habitat regeneration, ensuring suitable conditions for the stag beetle, addressing illegal logging, pasturing, and waste disposal, and establishing information points and educational activities for the community. (1-7)
Great bay mangrove action plan
In the bay of Fort-de-France, mangroves cover nearly 1,300 hectares, representing about 70% of the total mangrove area in Martinique. This plant formation, characteristic of tropical marine environments, is essential for the ecological balance of the bay. Mangroves act as filters, purifying marine and river waters, protecting the coastline against erosion, and providing habitat for various marine flora and fauna.
However, this fragile ecosystem is threatened by wave-induced erosion, urbanization, the spread of invasive species, and pollution. In response to these challenges, the French Coastal Protection Agency (Conservatoire de l'espace littoral et des rivages lacustres, CELRL) and its partners have launched an initiative to restore several mangrove areas as part of the “Contrat de la Grande Baie de Martinique" which is a collaborative initiative aimed at the sustainable management and restoration of the coastal and marine environment of the Greater Bay of Martinique. This contract typically involves partnerships between various stakeholders, including government agencies, local municipalities, environmental organizations, and community groups. The project identified several sites totaling 3.81 hectares in the Greater Bay area that require reclamation.
The project aims to restore mangrove populations by creating favorable conditions through actions such as clearing invasive species and trash, followed by replanting with white, black, or red mangrove seedlings, depending on the environmental characteristics of each site. Additionally, the initiative seeks to engage the public and youth through volunteering days and awareness campaigns (Refs 1-9).
However, this fragile ecosystem is threatened by wave-induced erosion, urbanization, the spread of invasive species, and pollution. In response to these challenges, the French Coastal Protection Agency (Conservatoire de l'espace littoral et des rivages lacustres, CELRL) and its partners have launched an initiative to restore several mangrove areas as part of the “Contrat de la Grande Baie de Martinique" which is a collaborative initiative aimed at the sustainable management and restoration of the coastal and marine environment of the Greater Bay of Martinique. This contract typically involves partnerships between various stakeholders, including government agencies, local municipalities, environmental organizations, and community groups. The project identified several sites totaling 3.81 hectares in the Greater Bay area that require reclamation.
The project aims to restore mangrove populations by creating favorable conditions through actions such as clearing invasive species and trash, followed by replanting with white, black, or red mangrove seedlings, depending on the environmental characteristics of each site. Additionally, the initiative seeks to engage the public and youth through volunteering days and awareness campaigns (Refs 1-9).
A Paceño, a Tree
The initiative consists of an afforestation campaign promoted by the local government of La Paz, with the objective of planting 10,000 trees and shrubs (1 & 2). Carried out between 2023 and 2024, the campaign included plantations across all the macrodistricts of La Paz (1). To ensure the campaign's success, the municipality encouraged the participation of volunteers from various institutions, such as public services, environmental groups, schools and universities, neighborhood associations, church groups, and even Army and Navy units (1 & 2). The trees play specific roles in mitigating climate change, improving air quality, reducing odors from nearby landfills, and decreasing the risk of landslides and soil erosion (3 & 4). Furthermore, the campaign aims to foster environmental awareness among citizens and replace trees lost due to illegal deforestation (1).
The species selected for planting were provided by EMAVERDE, the public company responsible for managing green spaces in the city. The selection included primarily native species, along with a few introduced ones, all chosen for their resilience to La Paz's varying climate conditions (1, 2 & 4). Given the challenging climate and difficult soil conditions, the municipality informed volunteers about the importance of maintaining the saplings, particularly during drought periods, to ensure their proper growth (1 & 2). The campaign also supported the municipality’s urban development plan (Plan Territorial de Desarrollo Integral "Para Vivir Bien") and the "Plan Integral de Recuperación de la Tormenta a la Esperanza," the latter developed in response to extreme rain events and floods that occurred during the campaign months (5).
The species selected for planting were provided by EMAVERDE, the public company responsible for managing green spaces in the city. The selection included primarily native species, along with a few introduced ones, all chosen for their resilience to La Paz's varying climate conditions (1, 2 & 4). Given the challenging climate and difficult soil conditions, the municipality informed volunteers about the importance of maintaining the saplings, particularly during drought periods, to ensure their proper growth (1 & 2). The campaign also supported the municipality’s urban development plan (Plan Territorial de Desarrollo Integral "Para Vivir Bien") and the "Plan Integral de Recuperación de la Tormenta a la Esperanza," the latter developed in response to extreme rain events and floods that occurred during the campaign months (5).
Nairobi River Basin Programme (NRBP)
Rapid urbanization and a population density of 6,247 people per km² have placed significant stress on Nairobi's natural resources (Ref 1). The 40-km long Nairobi River Basin, originating from the Ondiri Swamp, serves as a vital water source for the city (Ref 1, 2). However, it has suffered severe pollution from untreated sewage, solid waste, industrial contaminants, plastics, and agricultural runoff (Ref 1, 3). This degradation has had a serious impact on the ecosystem, local residents, and biodiversity (Ref 3).
To address these issues, the Nairobi River Basin Programme (NRBP), sponsored by UNEP, was launched in 1999 (Ref 4). Since then, government and non-state actors have worked together on solid waste management, riparian restoration, and wastewater control (Ref 1). The program was implemented in two phases: Phase I (2003–2006) and Phase II (2006–2009), involving stakeholders from the government, private sector, and civil society (Ref 1, 4, 5). Despite these efforts, a study from 2017 found significant tree removal along the river, and between 1988 and 2014, encroachment into the 30-meter riparian buffer zone dramatically increased, particularly between 2010 and 2014, further degrading the river’s health (Ref 1).
To address these issues, the Nairobi River Basin Programme (NRBP), sponsored by UNEP, was launched in 1999 (Ref 4). Since then, government and non-state actors have worked together on solid waste management, riparian restoration, and wastewater control (Ref 1). The program was implemented in two phases: Phase I (2003–2006) and Phase II (2006–2009), involving stakeholders from the government, private sector, and civil society (Ref 1, 4, 5). Despite these efforts, a study from 2017 found significant tree removal along the river, and between 1988 and 2014, encroachment into the 30-meter riparian buffer zone dramatically increased, particularly between 2010 and 2014, further degrading the river’s health (Ref 1).
Rehabilitation of the Kangemi Cemetery
The increasing volume of solid waste, driven by Nairobi's growing population, has become one of the city's major challenges (Ref 1, 2). To address this issue and promote better environmental practices, authorities plan to convert all reclaimed illegal dumpsites into recreational and green spaces. The transformation of the former Kangemi Cemetery, abandoned for over 20 years and used as an illegal dumpsite, was the first initiative in this effort.
Led by Nairobi's Governor, H.E. Mike Sonko, and supported by the City County, the project was completed in 2018 and serves as a key example of these transformative measures (Ref 1, 2, 3). Previously, Kangemi Cemetery contained over 500 loads of illegal waste, but following a successful clean-up, it has been rehabilitated into a children's playground with recreational area, now named Kangemi Cemetery Memorial Park (Ref 3).
Led by Nairobi's Governor, H.E. Mike Sonko, and supported by the City County, the project was completed in 2018 and serves as a key example of these transformative measures (Ref 1, 2, 3). Previously, Kangemi Cemetery contained over 500 loads of illegal waste, but following a successful clean-up, it has been rehabilitated into a children's playground with recreational area, now named Kangemi Cemetery Memorial Park (Ref 3).
Rehabilitation of Hon. John N. Michuki Memorial Conservation Park
The John Michuki Memorial Park was transformed from a vast dumpsite in 2008 and established in honor of John Michuki, the Environment Minister during the Kibaki administration, in 2012. Michuki garnered admiration and accolades for his enthusiasm and determination to clean and preserve the environment (Ref 1, 2). Situated along the Nairobi River, the park serves as a historically rich recreational facility (Ref 3).
However, several issues arose after the park was transferred to the county administration in 2013 (Ref 2). A section of the Nairobi River flowing through the park experienced severe environmental degradation due to illegal discharges and poor waste management, negatively impacting the riparian ecosystem and biodiversity (Ref 4). Additionally, the park became a refuge for drug users, street children, and thieves, with stray dogs posing safety threats in the area (Ref 1, 2).
As the first project within the Cleaning Up Kenya Campaign, the restoration of Michuki Memorial Park was launched in 2020 by the government (Ref 5). The park is now managed by the Kenya Forest Service (KFS) following a directive from the national government (ibid.). With funds from the treasury, a perimeter fence was erected, a 2.4 km walkway was constructed, and 4,200 seedlings and 6,357 indigenous trees were planted, along with the establishment of a nursery (Ref 1, 6). A total of 20,000 tons of solid waste were removed (Ref 6). Additionally, a community forest association was formed to ensure community engagement (Ref 2).
However, several issues arose after the park was transferred to the county administration in 2013 (Ref 2). A section of the Nairobi River flowing through the park experienced severe environmental degradation due to illegal discharges and poor waste management, negatively impacting the riparian ecosystem and biodiversity (Ref 4). Additionally, the park became a refuge for drug users, street children, and thieves, with stray dogs posing safety threats in the area (Ref 1, 2).
As the first project within the Cleaning Up Kenya Campaign, the restoration of Michuki Memorial Park was launched in 2020 by the government (Ref 5). The park is now managed by the Kenya Forest Service (KFS) following a directive from the national government (ibid.). With funds from the treasury, a perimeter fence was erected, a 2.4 km walkway was constructed, and 4,200 seedlings and 6,357 indigenous trees were planted, along with the establishment of a nursery (Ref 1, 6). A total of 20,000 tons of solid waste were removed (Ref 6). Additionally, a community forest association was formed to ensure community engagement (Ref 2).
PARC Rain Gardens Plymouth
The PARC Rain Garden project in Plymouth, Michigan, is an innovative initiative led by the Plymouth Arts and Recreation Complex (PARC) and Friends of the Rouge, aimed at addressing stormwater management and enhancing local environmental quality. Supported by a $400,000 grant from Michigan’s Department of Environment, Great Lakes, and Energy (EGLE) through its Nonpoint Source Program, this project will involve the construction of over 31,500 square feet of rain gardens located on the property of Plymouth Arts and Recreation Complex (PARC). These gardens are designed to filter up to 240,000 gallons of stormwater per rainfall event, preventing runoff from entering local waterways like the Tonquish Creek. The rain gardens will also mitigate flooding, reduce pollution, and create a more stable water flow in the Rouge River watershed, which is heavily impacted by urban development.
In addition to their environmental benefits, the rain gardens will provide aesthetic and ecological value to the PARC campus. The plantings, featuring native Michigan species, will create habitats for pollinators such as bees, butterflies, and birds, complementing the existing beehives on the PARC rooftop. The project aims to showcase the feasibility of integrating green infrastructure into routine construction, encouraging its adoption in other urban areas and residential spaces.
Ultimately, the PARC Rain Garden project will not only improve stormwater management but also serve as a model for sustainable urban development, enhancing the landscape while fostering environmental stewardship in the Plymouth community.
(Ref.1,2)
In addition to their environmental benefits, the rain gardens will provide aesthetic and ecological value to the PARC campus. The plantings, featuring native Michigan species, will create habitats for pollinators such as bees, butterflies, and birds, complementing the existing beehives on the PARC rooftop. The project aims to showcase the feasibility of integrating green infrastructure into routine construction, encouraging its adoption in other urban areas and residential spaces.
Ultimately, the PARC Rain Garden project will not only improve stormwater management but also serve as a model for sustainable urban development, enhancing the landscape while fostering environmental stewardship in the Plymouth community.
(Ref.1,2)
Chandler Park Marshland
Chandler Park, a historic park in Detroit constructed in the 1800s, underwent multiple expansions from 1922 to 1950 to include amenities such as a pool (later converted into a water park), a golf course, and public green spaces. In 2013, an expert panel recommended constructing a 2.5-million-gallon marshland within the park to provide a unique recreational and educational feature and incorporate green infrastructure principles for improved stormwater management. Completed in December 2019, the Chandler Park marshland was a collaborative project between The Greening of Detroit and the Chandler Park Conservancy, designed to enhance Green Stormwater Infrastructure (GSI) across 200 acres.
The marshland manages 2.5 million gallons of stormwater, substantially reducing the load on Detroit’s combined sewer system and minimizing basement flooding during heavy rains. Engineered with rain gardens, bioswales, and a pump system circulating up to 4 feet of water, the marshland fosters a balanced ecosystem with higher oxygen levels, benefiting local flora and fauna.
With 4,500 native plants, the marshland supports diverse wildlife, including migrating birds, turtles, frogs, pollinators like bees and butterflies, and natural mosquito predators. This project not only contributes to flood mitigation but also improves water quality by capturing stormwater and allowing pollutants to settle.
Additionally, the marshland provides a foundation for future environmental education, with plans to add an outdoor classroom and public learning spaces. The use of native plants ensures low maintenance and sustainability, requiring minimal water and fertilizers. By creating new habitats and recreational areas, the Chandler Park Marshland promotes biodiversity, environmental education, and community engagement, while alleviating urban runoff’s impact on Detroit’s sewer system.
(Ref.1-3)
The marshland manages 2.5 million gallons of stormwater, substantially reducing the load on Detroit’s combined sewer system and minimizing basement flooding during heavy rains. Engineered with rain gardens, bioswales, and a pump system circulating up to 4 feet of water, the marshland fosters a balanced ecosystem with higher oxygen levels, benefiting local flora and fauna.
With 4,500 native plants, the marshland supports diverse wildlife, including migrating birds, turtles, frogs, pollinators like bees and butterflies, and natural mosquito predators. This project not only contributes to flood mitigation but also improves water quality by capturing stormwater and allowing pollutants to settle.
Additionally, the marshland provides a foundation for future environmental education, with plans to add an outdoor classroom and public learning spaces. The use of native plants ensures low maintenance and sustainability, requiring minimal water and fertilizers. By creating new habitats and recreational areas, the Chandler Park Marshland promotes biodiversity, environmental education, and community engagement, while alleviating urban runoff’s impact on Detroit’s sewer system.
(Ref.1-3)
Restoration of the Panke river
The Panke is a watercourse that rises outside Berlin and reaches the urban area of the city, flows through the districts of Pankow and Mitte and flows into the Berlin-Spandau Ship Canal in Wedding. The length of the Panke is around 29 kilometres. Almost the entire length of the Panke in Berlin (around 17.6 km) is to be renaturalised - on the section from the state border in the north of Berlin to its confluence with the Berlin-Spandauer-Schifffahrtskanal (BSSK). The Panke is currently a small watercourse that has been heavily remodelled by humans. In large parts of the watercourse, the banks have been straightened like a canal and reinforced with sheet piling, among other things. Existing riverbed drops and weirs prevent fish from travelling unhindered through the watercourse. Studies on water body (structural) quality, typification and other biological quality characteristics have shown that the Panke has poor status values in the majority of Berlin's sections, e.g. in terms of the fish population. The negative assessment results are primarily attributed to the lack of habitat and structural diversity, the lack of passability of the watercourse and, in some cases, high nutrient loads. (Ref. 1)
The restoration of the river was initiated by the State Berlin, following the European Water Framework Directive. The central aim is to implement flood plains and recreate the pre-straightened water course, to ensure space for flooding, habitats for more diverse flora and fauna, increase water flow for better water quality and create a site for recreation in a densely built city. (Ref. 1; Ref. 2) The project started back in 2003 and is expected to be finished in the 2030s (Ref. 2; Ref. 7).
The restoration of the river was initiated by the State Berlin, following the European Water Framework Directive. The central aim is to implement flood plains and recreate the pre-straightened water course, to ensure space for flooding, habitats for more diverse flora and fauna, increase water flow for better water quality and create a site for recreation in a densely built city. (Ref. 1; Ref. 2) The project started back in 2003 and is expected to be finished in the 2030s (Ref. 2; Ref. 7).
Rimac River Landscape Project
The Rimac River Special Landscape Project, developed by the Municipal Programme for the Recovery of the Historic Centre of Lima (PROLIMA), is a municipal proposal that arose as a response to the significant degradation of the Rimac River as it passes through the historic centre of the Peruvian capital. The river has lost its character as a green corridor and potential public recreational space for citizens (1, 3). The main problems affecting the river are related to the erosion and risk of flooding of the river space, the ecological degradation of its channels and banks, the disconnection and low quality of adjacent public spaces and the urban fragmentation caused by car-oriented mobility (2). To recover its essence as an ecological green corridor, it was proposed to give back to the Historical Centre its riverside identity and to recover the water, environmental and scenic landscape. This project aims to restore the Rímac to its role as a geographical heritage and backbone of the city of Lima, creating a system of accessible and sustainable public spaces that will help to recover this water, urban and historical landscape, as well as providing a better quality of life for the residents and users of the Historical Centre (1).
The project consists of 4 stages of intervention: Puente del Ejército - Puente Santa Rosa / Puente Santa Rosa - Puente Balta / Puente Balta - Límite
of the CHL to the east (5). Among the interventions that make up the Special River Landscape Project are: the renaturation of the 4 km of the Rimac River as it passes through the city, the construction of 14 parks, 7 squares, 1 tree planting project, 24 street renovation projects, 7 bridges/pedestrian walkways, 10 building rehabilitations and 2 new public facilities (4). It is planned to start implementing the project by the end of 2024 (4).
The project consists of 4 stages of intervention: Puente del Ejército - Puente Santa Rosa / Puente Santa Rosa - Puente Balta / Puente Balta - Límite
of the CHL to the east (5). Among the interventions that make up the Special River Landscape Project are: the renaturation of the 4 km of the Rimac River as it passes through the city, the construction of 14 parks, 7 squares, 1 tree planting project, 24 street renovation projects, 7 bridges/pedestrian walkways, 10 building rehabilitations and 2 new public facilities (4). It is planned to start implementing the project by the end of 2024 (4).

