Productive Forest’ reforestation project
The rate of deforestation in the Brazilian Legal Amazon in 2023 was consolidated at 9,064 km2. Initiatives that promote forest restoration in this biome are emerging to overcome this scenario. One such initiative is Floresta Productiva which aims to reforest more than 200 hectares of degraded land in the southwest of the Brazilian Amazon, known as the ‘arc of deforestation’ (1). Led by the Instituto Socioambiental in partnership with the NGO Rioterra, it focuses on creating and disseminating native forest restoration models that combine ecosystem recovery with income generation for rural producers in Porto Velho (2). By fully integrating local communities, the project promotes traditional agroforestry practices (muvuca) and trains communities to maintain the planted land. This not only restores the forest but also provides economic benefits through the cultivation of timber, fruit trees and other species (2), strengthening sustainable agriculture, breaking the cycle of deforestation and restoring deforested areas through various native species grown in nurseries (1). The project is being developed in the cultivation area of the Amazon Bioeconomy Centre (CBCA), from 2023 to 2025, where it will directly benefit the rural community of Vila Nova de Teotônio (3).
The project started in 2019 and has impacted other communities in the area, such as the communities in Nova Mutum Paraná and Ji-Paraná (1). During these years, more than 123,000 trees have been planted in agroforestry on about 110 hectares of land, and edible forests have been created. Since 2022, a new planting phase has been underway, to plant more than 100,000 trees of 87 native species on 40 hectares of degraded forest (4). In conclusion, this project focuses on the development of agroforestry in the face of widespread monospecific soybean fields and intensive cattle ranching (3); the creation of edible forests (3); and the restoration of forest cover to ensure the long-term resilience of the forest (3).
The project started in 2019 and has impacted other communities in the area, such as the communities in Nova Mutum Paraná and Ji-Paraná (1). During these years, more than 123,000 trees have been planted in agroforestry on about 110 hectares of land, and edible forests have been created. Since 2022, a new planting phase has been underway, to plant more than 100,000 trees of 87 native species on 40 hectares of degraded forest (4). In conclusion, this project focuses on the development of agroforestry in the face of widespread monospecific soybean fields and intensive cattle ranching (3); the creation of edible forests (3); and the restoration of forest cover to ensure the long-term resilience of the forest (3).
Wet meadow restoration in Sjöhåla
In Sjöhåla, west of Kungälv, an abandoned pasture on a wet meadow by the coast was restored by reintroducing grazing, clearing bushes and reeds, digging ponds and renovating stone walls. The aim was to increase biodiversity in the area and to promote the production of local organic meat. Additionally, the project made it easier for visitors to pass through the area for recreational purposes. The project was carried out by the municipality of Kungälv and the non-profit organisation Omställning Kungälv, and involved other local associations, farmers and citizens. It was funded through the "Local nature conservation investment" by the Swedish Environmental Protection Agency. As a result of the project, the area is more accessible, and many species of plants, insects, and birds have been found. [Ref. 1-3]
Improving Ngong Hills Forest Conservation Efforts through Raising Local Community Awareness of Biodiversity Conservation
Ngong is a town in southern Kenya, located near Nairobi in Kajiado County, on the slopes of the Ngong Hills. The municipality has experienced significant development and population growth due to improved infrastructure and social amenities. However, this expansion poses a threat to biodiversity, as increased demand for agricultural land, wood, and raw materials is depleting the area's forests and putting many species at risk of extinction. Overgrazing, illegal logging, invasive species, and climate change-induced extremes like droughts and floods have further exacerbated the situation.
In response, the Rufford Foundation proposed the Improving Ngong Hills Forest Conservation Efforts through Raising Local Community Awareness of Biodiversity Conservation project. The initiative seeks to restore the Ngong Hills forest ecosystem through community-driven conservation. A nursery for native species was established, and tree planting campaigns were conducted in collaboration with national and local governments, community-based organizations, indigenous groups, and schools. Additionally, awareness programs and capacity-building efforts were launched, engaging local schools in restoration activities and organizing workshops to train community members and officials. (Ref. 1, 2, 3, 4, 5)
In response, the Rufford Foundation proposed the Improving Ngong Hills Forest Conservation Efforts through Raising Local Community Awareness of Biodiversity Conservation project. The initiative seeks to restore the Ngong Hills forest ecosystem through community-driven conservation. A nursery for native species was established, and tree planting campaigns were conducted in collaboration with national and local governments, community-based organizations, indigenous groups, and schools. Additionally, awareness programs and capacity-building efforts were launched, engaging local schools in restoration activities and organizing workshops to train community members and officials. (Ref. 1, 2, 3, 4, 5)
Rimac River Landscape Project
The Rimac River Special Landscape Project, developed by the Municipal Programme for the Recovery of the Historic Centre of Lima (PROLIMA), is a municipal proposal that arose as a response to the significant degradation of the Rimac River as it passes through the historic centre of the Peruvian capital. The river has lost its character as a green corridor and potential public recreational space for citizens (1, 3). The main problems affecting the river are related to the erosion and risk of flooding of the river space, the ecological degradation of its channels and banks, the disconnection and low quality of adjacent public spaces and the urban fragmentation caused by car-oriented mobility (2). To recover its essence as an ecological green corridor, it was proposed to give back to the Historical Centre its riverside identity and to recover the water, environmental and scenic landscape. This project aims to restore the Rímac to its role as a geographical heritage and backbone of the city of Lima, creating a system of accessible and sustainable public spaces that will help to recover this water, urban and historical landscape, as well as providing a better quality of life for the residents and users of the Historical Centre (1).
The project consists of 4 stages of intervention: Puente del Ejército - Puente Santa Rosa / Puente Santa Rosa - Puente Balta / Puente Balta - Límite
of the CHL to the east (5). Among the interventions that make up the Special River Landscape Project are: the renaturation of the 4 km of the Rimac River as it passes through the city, the construction of 14 parks, 7 squares, 1 tree planting project, 24 street renovation projects, 7 bridges/pedestrian walkways, 10 building rehabilitations and 2 new public facilities (4). It is planned to start implementing the project by the end of 2024 (4).
The project consists of 4 stages of intervention: Puente del Ejército - Puente Santa Rosa / Puente Santa Rosa - Puente Balta / Puente Balta - Límite
of the CHL to the east (5). Among the interventions that make up the Special River Landscape Project are: the renaturation of the 4 km of the Rimac River as it passes through the city, the construction of 14 parks, 7 squares, 1 tree planting project, 24 street renovation projects, 7 bridges/pedestrian walkways, 10 building rehabilitations and 2 new public facilities (4). It is planned to start implementing the project by the end of 2024 (4).
Lomas de Primavera Reforestation Project
To protect the Lomas de Primavera from urban pressure and other threats, the Lomas de Primavera Ecological Association has implemented strategies for its conservation. One of the strategies this organisation has promoted is reforestation activities. Working together with the Municipality of Lima and other interested actors, they have sought to expand Lima's green spaces, improve air quality, enhance flora, and promote tourism, among other benefits (1). Lima's Municipality has supported the project by donating 20,000 trees for reforestation and to prevent land encroachment (1), social organisations and environmental activists have joint efforts to plant more than 250 trees to support the conservation efforts (2, 7).
The Lomas de Primavera Ecological Association leads the project, organizing community management efforts to conserve the Lomas de Primavera sector. This association is based in the Agrupación Familiar Primavera Lomas de Carabayllo community (2). The association's conservation activities involve collaboration with various stakeholders at different levels. Locally, it works with community leaders and organizations. At the district level, it coordinates with the Carabayllo municipality and the NGO CIDAP to improve urban conditions. The metropolitan-level collaboration includes the Municipality of Lima and the ACR 'Sistema de Lomas de Lima' for ecosystem protection and valorization. Nationally, it partners with MINAM, SERNANP, MINAGRI, UNDP, UCV, and the Network of Peruvian Lomas to enhance ecosystem services, restore degraded areas, and conduct research on the Lomas (2).
The preservation and reforestation of these ecosystems is essential, as they have social, cultural and environmental value, including the following ecosystem services: provision of genetic resources, soil formation, pollination, aesthetic services, ecotourism, food, education, and archaeological and historical services (3)
The Lomas de Primavera Ecological Association leads the project, organizing community management efforts to conserve the Lomas de Primavera sector. This association is based in the Agrupación Familiar Primavera Lomas de Carabayllo community (2). The association's conservation activities involve collaboration with various stakeholders at different levels. Locally, it works with community leaders and organizations. At the district level, it coordinates with the Carabayllo municipality and the NGO CIDAP to improve urban conditions. The metropolitan-level collaboration includes the Municipality of Lima and the ACR 'Sistema de Lomas de Lima' for ecosystem protection and valorization. Nationally, it partners with MINAM, SERNANP, MINAGRI, UNDP, UCV, and the Network of Peruvian Lomas to enhance ecosystem services, restore degraded areas, and conduct research on the Lomas (2).
The preservation and reforestation of these ecosystems is essential, as they have social, cultural and environmental value, including the following ecosystem services: provision of genetic resources, soil formation, pollination, aesthetic services, ecotourism, food, education, and archaeological and historical services (3)
Revitalization of Loma El Marion
The Loma del Marión recovery project in Cartagena, Colombia, is a community-driven initiative supported by EPA Cartagena that focuses on restoring and conserving the remaining 1.2 hectares of tropical dry forest. Initially covering 33 hectares, the area has suffered degradation due to illegal encroachments, deforestation, and waste burning. The project has included planting over 3,000 plants and fostering community involvement in environmental conservation (ref 1). The main goals are to restore the ecosystem by reforesting native species, preventing landslide risks, and developing an ecopark that will serve as an educational and recreational space. Planned facilities include a library for learning about local flora and fauna, hiking trails, and a community garden to enhance local food security (ref 1,4). A notable educational initiative in the project is the formation of "Vigías del Ambiente" (Environmental Watchers), a group of 40 youths from the Red Nacional Jóvenes de Ambiente, supported by EPA Cartagena and CDKN. This initiative educates young people on climate change, conservation, and waste management through workshops and activities (ref 2, 3). In addition, the EPA is leading detailed studies of the tropical dry forest to identify and protect endemic species (ref 5). The project has resulted in significant environmental and social benefits, such as planting thousands of trees, boosting community engagement in conservation, and establishing youth groups dedicated to sustainable development and climate action (ref 3, 5).
Green Blue Axis of Sintra, Oeiras and Amadora
The Green and Blue Axis (Eixo Verde e Azul, EVA) is an inter-municipal green corridor project connecting the municipalities of Sintra, Oeiras, and Amadora through a 15-kilometre green ecological axis along the Jamor River (Ref 2). It aims to renaturalize the river, improve water quality, and control flooding while promoting sustainable mobility through pedestrian and cycling routes (Ref 5). The project also enhances public access to green spaces and cultural heritage sites, such as the Queluz National Palace (Ref 6). EVA supports the Lisbon Metropolitan Area’s regional strategy for climate change adaptation, risk prevention, and low-carbon economy (Ref 4). Funded by the European Regional Development Fund and municipal budgets, the project has an overall investment of €11 million (Ref 1). EVA exemplifies inter-municipal cooperation, overcoming policy conflicts to achieve shared environmental, social, and economic goals, making it a model for integrated territorial development (Ref 4). The project’s long-term impact includes reduced carbon footprint and increased territorial cohesion.
Metropolitan Lineal Park
The Metropolitan Linear Park is a project initiated by the national government of Bolivia, funded by the Inter-American Development Bank (IDB) (1-8). The proposed park will be located along a disused railway corridor between the cities of La Paz and El Alto, spanning 18.2 km (8, p. 8). The project involves the construction of a linear park, divided into five sections, each with distinct objectives, uses, and designs (8, p. 9). This large-scale initiative aims to improve access to public spaces in La Paz and El Alto, enhance connectivity between the two cities, protect surrounding biodiversity and natural spaces, and strengthen resilience to and mitigate the effects of climate change (3 & 8, pp. 11-12).
To achieve these goals, the project design includes outdoor sports and recreational facilities, pedestrian and cycling circuits, as well as the restoration of parks, squares, and public spaces adjacent to the park corridor (8, p. 9). Some features include balcony corridors, flower and food-producing urban gardens, and viewpoints (5). The project also plans for the re-vegetation of the area with native species and aims to stop the environmental degradation of surrounding natural environments, such as the Pura Pura forest, which has been suffering from ongoing deforestation and waste dumping (8, p. 9). These efforts are expected to increase and support biodiversity in the area (7 & 8, p. 12).
Additionally, the project emphasizes social inclusion, with policies designed to incorporate women, indigenous populations, and persons with disabilities (8, pp. 7-8). The park is intended to raise awareness about climate change and biodiversity, ultimately improving the quality of life and health of nearby residents and the citizens of La Paz and El Alto (8, p. 13).
To achieve these goals, the project design includes outdoor sports and recreational facilities, pedestrian and cycling circuits, as well as the restoration of parks, squares, and public spaces adjacent to the park corridor (8, p. 9). Some features include balcony corridors, flower and food-producing urban gardens, and viewpoints (5). The project also plans for the re-vegetation of the area with native species and aims to stop the environmental degradation of surrounding natural environments, such as the Pura Pura forest, which has been suffering from ongoing deforestation and waste dumping (8, p. 9). These efforts are expected to increase and support biodiversity in the area (7 & 8, p. 12).
Additionally, the project emphasizes social inclusion, with policies designed to incorporate women, indigenous populations, and persons with disabilities (8, pp. 7-8). The park is intended to raise awareness about climate change and biodiversity, ultimately improving the quality of life and health of nearby residents and the citizens of La Paz and El Alto (8, p. 13).
The Pantanos de Villa Wildlife Refuge
The Pantanos de Villa Wildlife Refuge is a natural oasis in the heart of Lima. It is considered a marsh of international Ramsar importance, as it is home to a large number of species of flora and fauna. It includes 5 bodies of water with about 210 species of birds, 13 species of fish, and 5 species of amphibians and reptiles, among others (1). It was created in 2006, by Supreme Decree N°055-2006-AG, which established the definitive category for the Pantanos de Villa, under the name of The Pantanos de Villa Wildlife Refuge (2). This protected area was established over an area of 263.27 ha, and its main goal is to conserve a representative sample of the Marshes of the Subtropical Pacific Desert, including important plant communities, as well as migratory and resident avifauna, focusing mainly on species with some degree of threat (1, 2, 6).
In 2016, a Master Plan was approved aimed at strengthening the conservation of the biological diversity of this coastal marsh and ensuring conditions to promote inter-institutional cooperation and participatory management, including neighbours, authorities, municipalities and interested institutions (2).
This Master Plan establishes environmental, economic and cultural indicators defined to be met over 5 years. These are focused on protecting water resources, conserving migratory and resident bird species, ensuring the conservation of the cattail, promoting tourism and recreational activities, fostering environmental awareness activities and engaging citizens in the management of the Refuge (2)
This plan seeks to confront a series of threats that endanger the conservation of this ecosystem. Among the main problems are the illegal extraction of natural resources, such as cattail; the improper use of the space for activities such as bonfires, consumption of illicit substances and pet walks; the change in land use due to urban expansion; pollution from effluent discharges and solid waste disposal; and illegal fishing (2)
In 2016, a Master Plan was approved aimed at strengthening the conservation of the biological diversity of this coastal marsh and ensuring conditions to promote inter-institutional cooperation and participatory management, including neighbours, authorities, municipalities and interested institutions (2).
This Master Plan establishes environmental, economic and cultural indicators defined to be met over 5 years. These are focused on protecting water resources, conserving migratory and resident bird species, ensuring the conservation of the cattail, promoting tourism and recreational activities, fostering environmental awareness activities and engaging citizens in the management of the Refuge (2)
This plan seeks to confront a series of threats that endanger the conservation of this ecosystem. Among the main problems are the illegal extraction of natural resources, such as cattail; the improper use of the space for activities such as bonfires, consumption of illicit substances and pet walks; the change in land use due to urban expansion; pollution from effluent discharges and solid waste disposal; and illegal fishing (2)
Ballyfermot People's Park
In 2021-2022, the fenced grassy area beside the Ballyfermot Community Civic Centre was transformed into a welcoming 'people’s park'—an open green space for the community (2). Designed by Dublin City Council’s Parks, Biodiversity, and Landscape Services, the park reflects ideas from local residents gathered over eight months of on-site conversations and two community consultation events.
The new park features a winding perimeter path, earth mounds planted with a variety of trees and plants for seasonal color, and infrastructure to support small community gatherings. An open pergola and a designated market space for food, plant, and craft markets provide inviting spots for social events. Along the park’s edge, a movement trail with playable elements for exercise and play adds a dynamic feature to the space.
Furthermore, a Jackstraws See-Saw is ideal for older children to play in groups and learn about movement whilst also being a tremendous informal seating area for them to gather and chat. Trees cover the See-Saw, offering shade and shelter from the weather, making it a great social space all year round. A Rope Course provides a physical challenge for older children to climb and balance at height while exploring the area. Informal play opportunities are found throughout the park to, with trees, fallen logs, benches and planting that create sensory, imaginative and physical play experiences. (5-7)
Additionally, an edible garden is planned to be developed collaboratively with local residents over the next 2-3 years (4).
The new park features a winding perimeter path, earth mounds planted with a variety of trees and plants for seasonal color, and infrastructure to support small community gatherings. An open pergola and a designated market space for food, plant, and craft markets provide inviting spots for social events. Along the park’s edge, a movement trail with playable elements for exercise and play adds a dynamic feature to the space.
Furthermore, a Jackstraws See-Saw is ideal for older children to play in groups and learn about movement whilst also being a tremendous informal seating area for them to gather and chat. Trees cover the See-Saw, offering shade and shelter from the weather, making it a great social space all year round. A Rope Course provides a physical challenge for older children to climb and balance at height while exploring the area. Informal play opportunities are found throughout the park to, with trees, fallen logs, benches and planting that create sensory, imaginative and physical play experiences. (5-7)
Additionally, an edible garden is planned to be developed collaboratively with local residents over the next 2-3 years (4).

