1. General information
2. Objectives of the intervention
Goals of the intervention
The main goal of the project was the reconstruction of two of the four ponds at Iron studienke. The objectives included enhancement of the passage for new outlets so that water can flow into a pond of Vydrica as it did in the past. (8, 14, 19) Also, the maintenance of ponds at the Iron studničke are part of the pilot project titled "Bratislava is preparing for climate change" focusing on the negative externalities of global warming on urban environments and residents. (9)
Quantitative targets
- Reconstruction of two ponds/lakes/dams of the total of four located at Iron studienke. (8, 9)
Monitoring indicators defined
- protective measures relating to the conservation of protected animals harvested by licensed professionals (8)
Sustainability challenge(s) addressed
Climate change adaptation: What were the goals of the NBS?
Climate change adaptation: What activities are implemented to realize the conservation goals and targets?
What types of restoration goals are / were defined for the NBS intervention?
What activities are implemented to realize the restoration goals and targets?
Implementation activities
The staff of Urban Forests in Bratislava began in late July 2016 year with the first water reservoir. They discharged water from it, which was done to prepare for reconstruction work on the tank and its overall revitalization. In connection with the discharge of water from the dam, they had to provide for safeguard measures concerning the protection of the areas protected animals while the constructions took place before they could be returned to their environment. This included carp, crucian carp, catfish, pike, perch, tench and grass carp and also shellfish - mussel ponds and river trough. (9, 11, 20)
Work on the ponds was originally planned to end at the end of March 2017. (12) The contract was extended however due to the January frosts, for which abstained the implementation of this NBS. (13)
Work on the ponds was originally planned to end at the end of March 2017. (12) The contract was extended however due to the January frosts, for which abstained the implementation of this NBS. (13)
Type of NBS project
3. NBS domains, ES and scale
4. Governance and financing
5. Innovation
Type of innovation
Please specify technological innovation
The project aimed to enhance the quality of the habitat provided for both the visiting population of local resident and tourists as well as the natural inhabitants of the ponds. (8, 9, 11, 20)