Municipal biodiversity conservation project
The Waliwa project, launched in 2017 by the municipality of Sainte-Luce, is a collaborative effort dedicated to restoring marine biodiversity, enhancing the ecological balance of the bay area, revitalizing the local ecosystem and supporting sustainable economic activities. By focusing on marine biodiversity conservation, Waliwa addresses several critical environmental challenges. The project helps mitigate coastline erosion, support the blue economy through artisanal fishing and tourism, and foster an environmentally friendly culture among the local community.
So far, the Waliwa project has implemented three initiatives: it restored the Gros Raisin backshore to address erosion and provide nesting sea turtles with protected space (Ref 4). The project also intervened to restore the Pont Café pond, which was covered in Salvinia Molesta, preventing the intake of oxygen and hampering its role as a water filter, habitat for species and flood regulator .
Furthermore, the project has conducted studies and raised awareness about the challenges posed by wastewater management on the health of municipal water bodies. Through these efforts, Waliwa is working to create a more sustainable and resilient marine environment for future generations. (Ref 4, 5, 6; 12)
So far, the Waliwa project has implemented three initiatives: it restored the Gros Raisin backshore to address erosion and provide nesting sea turtles with protected space (Ref 4). The project also intervened to restore the Pont Café pond, which was covered in Salvinia Molesta, preventing the intake of oxygen and hampering its role as a water filter, habitat for species and flood regulator .
Furthermore, the project has conducted studies and raised awareness about the challenges posed by wastewater management on the health of municipal water bodies. Through these efforts, Waliwa is working to create a more sustainable and resilient marine environment for future generations. (Ref 4, 5, 6; 12)
Assemini Waterways Restoration for Flood Resilience
Assemini, a municipality in Cagliari, has long grappled with hydrogeological instability, marked by major floods in 1999 and 2002. To mitigate future risks, the municipality launched a series of interventions focused on improving the hydraulic management of its waterways. These projects are part of a broader strategy to address recurring flood hazards exacerbated by the effects of rapid urbanization in the 1970s, which disrupted the natural water drainage systems (1,3). The central goal of the project is to reduce the risk of flooding by enhancing the functionality of existing waterways. This includes both preventative measures and structural improvements to the canal system to manage stormwater more effectively. These efforts aim to safeguard urban and rural areas from severe meteorological events. The project development involved a multi-phased approach starting in 2013, focusing on cleaning and maintaining minor waterways such as the Gutturu Lorenzu, Sa Nuxedda, and Giaccu Meloni streams. These efforts expanded over time, culminating in an agreement with the Land Reclamation Consortium of Southern Sardinia in 2015, securing both local and regional financial support. The interventions have covered over 24 kilometers of canals and streams, targeting key flood-prone areas (1,2).
Key interventions include the cleaning and maintenance of over 35 km of canals and streams, in partnership with the Land Reclamation Consortium of Southern Sardinia, supported by regional funding. A separate, large-scale intervention in Truncu Is Follas involves constructing an open-air diversion canal, a retention basin (44,500 m³), and new pipelines to redirect floodwaters, thus reducing risk for residents downstream in both Assemini and Elmas.
Key interventions include the cleaning and maintenance of over 35 km of canals and streams, in partnership with the Land Reclamation Consortium of Southern Sardinia, supported by regional funding. A separate, large-scale intervention in Truncu Is Follas involves constructing an open-air diversion canal, a retention basin (44,500 m³), and new pipelines to redirect floodwaters, thus reducing risk for residents downstream in both Assemini and Elmas.
Rio PHX
For thousands of years the Rio Salado, also known as the Salt River, and its larger mainstem, the Gila River, served as an important perennial source of life and growth for indigenous people residing in central Arizona, including the Akimel and Piipaash (3). Today, the Salt River is an ephemeral river corridor connecting diverse urban communities across an expansive and growing Maricopa County (3). While the river is now typically defined by intermittent flow as a function of water conservation and distribution in an arid urban climate, it also has powerful flows during the Arizona monsoon season providing a diverse and unique ecosystem for the region (3). To foster the health of the River, a regional multi-decade project was initiated in 2018 called Rio Reimagined, which includes six cities and two tribal communities (1). Rio Reimagined is a planning initiative in a very early concept stage, centered around the mission to support and enhance this treasured river corridor (3). The goals of Rio Reimagined consist of connecting communities, Equitable & Sustainable Development, and Restoring and Revitalizing Healthy Rivers (3). As part of the Rio Reimagined, the City of Phoenix founded a collaborative project called Rio PHX that will help promote a 20-mile Rio Salado (Salt River) corridor as a local and regional destination that attracts positive investment for the benefit of existing/future businesses, residents, and tourists (1). The final aim with this project is to improve health outcomes for existing and future residents by address outstanding needs in the area and create opportunities for housing, employment, recreation, art, and ecological restoration (1). From May 2024 to May 2025 Rio PHX will engage in creating a community profile, an existing conditions assessment, community engagement & visioning, developing implementation strategies and drafting the master plan (1). Public hearings and final plan adoption are set to take place in fall 2025 (1).
Mapinguari National Park
Mapinguari National Park, located in the Amazon region of Brazil, is a protected area distinguished by its rich biodiversity and vast expanse of untouched tropical rainforest (2). It was officially created on June 5, 2008, by decree, covering an area of 1,776,914.18 hectares (2). The Chico Mendes Institute for Biodiversity Conservation (ICMBio) manages the park. It is linked to a management plan encompassing several nearby conservation units and their areas of influence (2, 3). Its main goal is to preserve the valuable natural ecosystems and scenic landscapes of the Purus-Madeira interfluvial region, which includes savanna enclaves (2, 3). The ecoregion where it is located has a high priority for botanical conservation due to parameters such as species richness and endemism (3). Additionally, the area presents great environmental heterogeneity, with several isolated and unique ecosystems, aspects that have been considered for fostering scientific research and public visitation, with programs for environmental education, recreation in contact with nature, and ecotourism (3). On March 8, 2013, an advisory council for the park was established to involve various stakeholders in decision-making and the effective conservation of the park (2), and in 2018 a Management Master Plan was established, seeking to develop an integrated approach for the protection and proper management of the region, especially considering the socio-environmental impacts of the construction of the BR-319 highway and the deforestation caused by fires, the expansion of soybean cultivation, land appropriation (7) and cattle ranching from the neighbouring state (3, 10). It was established as a Natural Park in 2008, but over the years it has undergone changes in land regulations, adding or decreasing its size as certain mining activities have been allowed in the buffer zone (2)
Conservation Plan of the Lake Ciurbesti
The initiative focuses on the creation and implementation of a management plan for the Natura 2000 areas of Ciurbesti Lake and Fânațele Bârca to protect their biodiversity and promote sustainable tourism and land use. These areas were designated as part of the Natura 2000 network in 2016, but until recently, lacked a formal management plan. In 2019, the environmental group "Asociaţia Scutierii Naturii Bacău," in partnership with the Environmental Protection Agency of Iași (APM Iași), secured EU funding to develop the plan. While the plan was being developed, minimal regulations were established in 2022 to ensure interim protection.
The finalized management plan was released in 2024. It assessed species and habitats of European, national, and community importance, identifying 18 bird species, 3 plant species, 1 mammal species, and 4 key habitats. The plan also identified environmental pressures and set objectives and actions to ensure the conservation of this biodiversity. Before the plan's completion, two rounds of public consultations were held, involving a broad range of stakeholders, including surrounding municipalities, private landowners, public administrators, and local community representatives, to define optimal management practices.
The plan mandates continuous monitoring and reporting on the state of species and habitats. It also includes specific conservation measures, such as the partial reconstruction of endangered habitats, meetings with local land users to restrict harmful activities, public awareness campaigns, and regular monitoring. Additionally, it emphasizes the sustainable use of the area, including tourism. The creation of the plan was financed with EU funds totaling €1,036,014.27, and the projected cost for its implementation is €259,627.99. (1-5)
The finalized management plan was released in 2024. It assessed species and habitats of European, national, and community importance, identifying 18 bird species, 3 plant species, 1 mammal species, and 4 key habitats. The plan also identified environmental pressures and set objectives and actions to ensure the conservation of this biodiversity. Before the plan's completion, two rounds of public consultations were held, involving a broad range of stakeholders, including surrounding municipalities, private landowners, public administrators, and local community representatives, to define optimal management practices.
The plan mandates continuous monitoring and reporting on the state of species and habitats. It also includes specific conservation measures, such as the partial reconstruction of endangered habitats, meetings with local land users to restrict harmful activities, public awareness campaigns, and regular monitoring. Additionally, it emphasizes the sustainable use of the area, including tourism. The creation of the plan was financed with EU funds totaling €1,036,014.27, and the projected cost for its implementation is €259,627.99. (1-5)
Storm Water Management Program Plan
The City of Mobile has developed and implemented a Storm Water Management Program (SWMP) as required by the regulations of the Environmental Protection Agency (Ref 1). Flooding is a significant issue in Mobile, occurring frequently throughout the town (Ref 3). The SWMP aims to protect water quality and prevent harmful pollutants in stormwater runoff from entering the Municipal Separate Storm Sewer System (MS4) area (Ref 1). Stormwater runoff refers to rainfall that does not seep into the ground but instead flows over yards, streets, parking lots, and buildings, eventually entering the storm sewer system, which directs it into creeks, rivers, bays, and the Gulf of Mexico (Ref 1). Stormwater can collect pollutants such as trash, debris, sediment, heavy metals, oils, and hazardous household materials. Additionally, development increases impervious surfaces, leading to more stormwater runoff (Ref 2).
Nairobi River Basin Programme (NRBP)
Rapid urbanization and a population density of 6,247 people per km² have placed significant stress on Nairobi's natural resources (Ref 1). The 40-km long Nairobi River Basin, originating from the Ondiri Swamp, serves as a vital water source for the city (Ref 1, 2). However, it has suffered severe pollution from untreated sewage, solid waste, industrial contaminants, plastics, and agricultural runoff (Ref 1, 3). This degradation has had a serious impact on the ecosystem, local residents, and biodiversity (Ref 3).
To address these issues, the Nairobi River Basin Programme (NRBP), sponsored by UNEP, was launched in 1999 (Ref 4). Since then, government and non-state actors have worked together on solid waste management, riparian restoration, and wastewater control (Ref 1). The program was implemented in two phases: Phase I (2003–2006) and Phase II (2006–2009), involving stakeholders from the government, private sector, and civil society (Ref 1, 4, 5). Despite these efforts, a study from 2017 found significant tree removal along the river, and between 1988 and 2014, encroachment into the 30-meter riparian buffer zone dramatically increased, particularly between 2010 and 2014, further degrading the river’s health (Ref 1).
To address these issues, the Nairobi River Basin Programme (NRBP), sponsored by UNEP, was launched in 1999 (Ref 4). Since then, government and non-state actors have worked together on solid waste management, riparian restoration, and wastewater control (Ref 1). The program was implemented in two phases: Phase I (2003–2006) and Phase II (2006–2009), involving stakeholders from the government, private sector, and civil society (Ref 1, 4, 5). Despite these efforts, a study from 2017 found significant tree removal along the river, and between 1988 and 2014, encroachment into the 30-meter riparian buffer zone dramatically increased, particularly between 2010 and 2014, further degrading the river’s health (Ref 1).
Rehabilitation of Hon. John N. Michuki Memorial Conservation Park
The John Michuki Memorial Park was transformed from a vast dumpsite in 2008 and established in honor of John Michuki, the Environment Minister during the Kibaki administration, in 2012. Michuki garnered admiration and accolades for his enthusiasm and determination to clean and preserve the environment (Ref 1, 2). Situated along the Nairobi River, the park serves as a historically rich recreational facility (Ref 3).
However, several issues arose after the park was transferred to the county administration in 2013 (Ref 2). A section of the Nairobi River flowing through the park experienced severe environmental degradation due to illegal discharges and poor waste management, negatively impacting the riparian ecosystem and biodiversity (Ref 4). Additionally, the park became a refuge for drug users, street children, and thieves, with stray dogs posing safety threats in the area (Ref 1, 2).
As the first project within the Cleaning Up Kenya Campaign, the restoration of Michuki Memorial Park was launched in 2020 by the government (Ref 5). The park is now managed by the Kenya Forest Service (KFS) following a directive from the national government (ibid.). With funds from the treasury, a perimeter fence was erected, a 2.4 km walkway was constructed, and 4,200 seedlings and 6,357 indigenous trees were planted, along with the establishment of a nursery (Ref 1, 6). A total of 20,000 tons of solid waste were removed (Ref 6). Additionally, a community forest association was formed to ensure community engagement (Ref 2).
However, several issues arose after the park was transferred to the county administration in 2013 (Ref 2). A section of the Nairobi River flowing through the park experienced severe environmental degradation due to illegal discharges and poor waste management, negatively impacting the riparian ecosystem and biodiversity (Ref 4). Additionally, the park became a refuge for drug users, street children, and thieves, with stray dogs posing safety threats in the area (Ref 1, 2).
As the first project within the Cleaning Up Kenya Campaign, the restoration of Michuki Memorial Park was launched in 2020 by the government (Ref 5). The park is now managed by the Kenya Forest Service (KFS) following a directive from the national government (ibid.). With funds from the treasury, a perimeter fence was erected, a 2.4 km walkway was constructed, and 4,200 seedlings and 6,357 indigenous trees were planted, along with the establishment of a nursery (Ref 1, 6). A total of 20,000 tons of solid waste were removed (Ref 6). Additionally, a community forest association was formed to ensure community engagement (Ref 2).
Montgérald Peri-urban Forest Conservation
The riparian forest of Montgérald, through which the “Monsieur” River flows, is located within Fort-de-France and boasts rich biodiversity, featuring around 100 species of shrubs and trees and about 30 animal species, including 16 types of birds. It is one of the last remnants of the mesophilic forest type and the only example in a French peri-urban setting. This unique ecosystem is recognized as a Natural Area of Ecological, Faunal, and Floral Interest (ZNIEFF) and a Classified Wooded Area (EBC), underscoring the need for conservation efforts.
Covering nearly 21 hectares, this site offers ecological benefits like air quality improvement and temperature regulation, providing a "fresh air island" near the city center. However, it faces significant challenges, including flooding caused by climate change and heavy rains, which exacerbate erosion along the Monsieur River. The area is also threatened by invasive alien species, making conservation measures even more crucial.
Since 2015, the municipality of Fort-de-France, along with project partners, has been working on developing this natural space for both conservation and public engagement purposes. The most recent actions occurred in 2020, including riverbank restoration, clearing invasive species, and creating walking paths and educational installations. Additionally, the project features an awareness campaign targeting local schools. The ongoing initiative aims to merge biodiversity conservation with community recreational use and environmental education, ensuring the resilience of this vital ecosystem against the impacts of climate change. (Refs. 1, 2, 3)
Covering nearly 21 hectares, this site offers ecological benefits like air quality improvement and temperature regulation, providing a "fresh air island" near the city center. However, it faces significant challenges, including flooding caused by climate change and heavy rains, which exacerbate erosion along the Monsieur River. The area is also threatened by invasive alien species, making conservation measures even more crucial.
Since 2015, the municipality of Fort-de-France, along with project partners, has been working on developing this natural space for both conservation and public engagement purposes. The most recent actions occurred in 2020, including riverbank restoration, clearing invasive species, and creating walking paths and educational installations. Additionally, the project features an awareness campaign targeting local schools. The ongoing initiative aims to merge biodiversity conservation with community recreational use and environmental education, ensuring the resilience of this vital ecosystem against the impacts of climate change. (Refs. 1, 2, 3)
Chickasabogue Park upgrade
Chickasabogue Park, a 1,100-acre outdoor recreation facility and wildlife refuge in Eight Mile, Alabama, is the largest park in Mobile County (Ref 3). Since 2022, the park has undergone extensive renovations aimed at increasing public access to green spaces and shoreline recreational areas, particularly along Chickasabogue Creek, while offering a variety of outdoor activities in a natural setting and preserving local biodiversity (Ref. 3).
The improvements focus on enhancing the day-use area, including upgrades to the playground, a splash pad, basketball courts (adapted to heavy rains with water-permeable materials), and a ball field (Ref 1, Ref 2). Additionally, a new pavilion site and an events and interpretive centre are being developed (Ref 1, Ref 2). Sidewalks and family-friendly walking trails are being built, and improvements are also being made to the park's mountain bike trail and disc golf course (Ref 2), providing more opportunities for outdoor physical activities in nature. Other significant upgrades include the creation of a restroom and a new parking lot with permeable pavers to prevent flooding (Ref 2). Critical infrastructure work is underway, including the installation of underground utilities, water, sewer systems, and roadwork (Ref 2). Furthermore, a new Recreational Vehicles (RV) campground with 38 spaces is in the works (Ref 2).
These upgrades are part of a broader initiative aimed at ensuring the public can quickly access and enjoy natural resources (Ref 2). The renovation also emphasises the cultural heritage and historical significance of the park, with plans to use architecture, design, and artefacts to honour the different cultures that once lived in the area (Ref 2). The next phase includes seeking funding to renovate the beach area and construct a new boat ramp (Ref 1).
The improvements focus on enhancing the day-use area, including upgrades to the playground, a splash pad, basketball courts (adapted to heavy rains with water-permeable materials), and a ball field (Ref 1, Ref 2). Additionally, a new pavilion site and an events and interpretive centre are being developed (Ref 1, Ref 2). Sidewalks and family-friendly walking trails are being built, and improvements are also being made to the park's mountain bike trail and disc golf course (Ref 2), providing more opportunities for outdoor physical activities in nature. Other significant upgrades include the creation of a restroom and a new parking lot with permeable pavers to prevent flooding (Ref 2). Critical infrastructure work is underway, including the installation of underground utilities, water, sewer systems, and roadwork (Ref 2). Furthermore, a new Recreational Vehicles (RV) campground with 38 spaces is in the works (Ref 2).
These upgrades are part of a broader initiative aimed at ensuring the public can quickly access and enjoy natural resources (Ref 2). The renovation also emphasises the cultural heritage and historical significance of the park, with plans to use architecture, design, and artefacts to honour the different cultures that once lived in the area (Ref 2). The next phase includes seeking funding to renovate the beach area and construct a new boat ramp (Ref 1).