1. General information
Location and description of the intervention
City or FUA
Bydgoszcz
Region
Europe
Native title of the NBS intervention
Budowa i przebudowa kanalizacji deszczowej i dostosowanie sieci kanalizacji deszczowej do zmian klimatycznych na terenie miasta Bydgoszczy
Short description of the intervention
The city of Bydgoszcz modernizes the rain drainage system with the support of EU funds. The current badly functioning rain drainage system (with sanded and littered canals) prevents from unobstructed rainwater flow to the Brda and Vistula Rivers or the Bydgoszcz Canal. This in turn leads to frequent floods in the city. The project is planned for the period between 2017 and 2021 and involves water purification and management of rainwater in the grey and green urban areas as well as reuse of the collected water for watering urban greenery [1,2].
Address

Bydgoszcz
Poland

Timeline of intervention
Start date of the intervention (planning process)
unknown
Start date of intervention (implementation process)
2017
End date of the intervention
2021
Present stage of the intervention
Please specify "other" stage of the intervention
The intervention is expected to end in 2021.(2)
Goals of the intervention
1) Solving the problem of the frequent flooding which is caused by the malfunctioning of rain drainage system;
2) Improving the comfort of living of the residents of Bydgoszcz;
3) Better protection of the roads, tram tracks, communication lines and buildings from water damage; 4) Water retention and provision of rain water for watering urban greenery [1,2].

Quantitative targets
1) Thorough renovation, reconstruction, and cleaning of over 90 km of existing canals;
2) Construction of about 14 km of new drains for rain;
3) Building several dozen retention tanks with capacities from 26 to 1800 cubic meters, including reservoirs with the possibility of reusing water for watering urban greenery;
4) Creating 22 storm water purification plants [1,2].

Monitoring indicators defined
1) Effective management of rainwater in the city;
2) Less frequent flooding episodes in the city;
3) Decreased rainwater damage of the urban infrastructure [1,2]
Implementation activities
1) Thorough renovation, reconstruction, and cleaning of over 90 km of existing canals;
2) Construction of about 14 km of new drains for rain;
3) Building several dozen retention tanks with capacities from 26 to 1800 cubic meters, including reservoirs with the possibility of reusing water for watering urban greenery;
4) Creating 22 storm water purification plants [1,2].
NBS domain and interventions
Ecological domain(s) where the NBS intervention(s) is/are implemented
Blue infrastructure
Rivers/streams/canals/estuaries
Green areas for water management
Sustainable urban drainage systems
What is the level of innovation / development of the NBS related to water management?
Amenities offered by the NBS
Services
Expected ecosystem services delivered
Regulating services
Flood regulation
Water purification / filtration
Scale
Spatial scale
Meso-scale: Regional, metropolitan and urban level
Sub-microscale: Street scale (including buildings)
Beneficiaries
Governance
Governance arrangements
Please specify the roles of the specific government and non-government actor groups involved in the initiative
Municipal Waterworks and Sewage System in Bydgoszcz sp. Z o.o. (Miejskie Wodociągi i Kanalizacja w Bydgoszczy sp. z o.o.) have prepared a program of modernization of rain drainage system "Construction and reconstruction of rain drainage system and adjustment of rain drainage network to climate change in the city of Bydgoszcz", which was accepted by the Ministry of Environment and received relevant EU funding [1,2].
Key actors - initiating organization
Key actors - Other stakeholders involved (besides initiating actors)
EU body
National government
Local government/municipality
Citizens or community group
Participatory methods/forms of community involvement used
Policy drivers
NBS intervention implemented in response to an Regional Directive/Strategy
Unknown
NBS intervention implemented in response to a national regulations/strategy/plan
Unknown
NBS intervention implemented in response to a local regulation/strategy/plan
Yes
Please specify the "local regulation/strategy/plan"
Municipal Waterworks and Sewage System in Bydgoszcz sp. Z o.o. (Miejskie Wodociągi i Kanalizacja w Bydgoszczy sp. z o.o.) have prepared a program of modernization of rain drainage system called "Construction and reconstruction of rain drainage system and adjustment of rain drainage network to climate change in the city of Bydgoszcz", which was accepted by the Ministry of Environment.(1)(2)

Mandatory or voluntary intervention
Voluntary (spontaneous)
Please specify other type of voluntary intervention
Local municipality developed project proposal on its own initiative.
Enablers
Presence of specific city-level GI/NBS vision/strategy/plan - mentioned in connection to the project
Yes
Please specify
A program of modernization of rain drainage system: "Construction and reconstruction of rain drainage system and adjustment of rain drainage network to climate change in the city of Bydgoszcz" [1].
Presence of specific city-level GI/NBS section/part in a more general plan - mentioned in connection to the project
Unknown
If there is a relevant strategy or plan, please specify the theme / type of the plan.
Presence of city network or regional partnerships focused on NBS - mentioned in connection to the project
Unknown
Presence of GI / NBS research project - mentioned in connection to the project
Yes
Please specify
The inventory carried out in Bydgoszcz by the Municipal Water Supply and Sewerage Company showed that 60-70% of the existing drainage network is blocked.(1)
Subsidies/investment for GI / NBS in the city - mentioned in connection to the project
Yes
Please specify
EU funding under the Operational Program Infrastructure and Environment.(1)
Co-finance for NBS
Unknown
Co-financing governance arrangements
Unknown
Was this co-governance arrangement already in place, or was it set up specifically for this NBS?
Financing
What is/was the Cost/Budget (EUR) of the NBS or green infrastructure elements?
130 million PLN (around 30 mln EUR)
What are the total amount of expected annual maintenance costs?
unknown
What is the expected annual maintenance costs of the NBS or GI elements?
unknown
Please specify cost savings
unknown
Please specify total cost (EUR)
130 million PLN (around 30 mln EUR) of EU funds for the modernization of the rain drainage system.(1)
Source(s) of funding
Non-financial contribution
Unknown
Business models
Which of the involved actors was motivated by this model?
Please specify technological innovation
Providing a well functioning sustainable rain drainage system for the first time in the city.(1)
Novelty level of the innovation
Please specify novelty level of the innovation
unknown
Please specify Replicability/Transferability
unknown
Impacts, benefits
Description of environmental benefits
The program of modernization of rain drainage system is still ongoing, but in its final stages and it is called "Construction and reconstruction of rain drainage system and adjustment of rain drainage network to climate change in the city of Bydgoszcz." Bydgoszcz has a well functioning water management and purification system, and city-wide floods should be less frequent [1,2].
Description of economic benefits
The program is supposed to alleviate the risk of damage by floods [1,2].
Social and cultural impacts
Description of social and cultural benefits
unknown
Type of reported impacts
Indicators
1) Effective management of rainwater in the city;
2) Less frequent flooding episodes in the city;
3) Decreased rainwater damage of the urban infrastructure [1,2].

Environmental, social and economic impacts
Analysis of specific impact categories
Job creation: The NBS created ...
Negative impacts: Did the project cause any problems or concerns?
No information was found regarding negative impacts of the project
COVID-19 pandemic
Unknown as of September of 2020.
Methods of impact monitoring
Process of recording NBS impacts
Methods used to evaluate the impacts of NBS
Evidence for use of assessment
Presence of an assessment, evaluation and/or monitoring process
Unknown
Presence of indicators used in reporting
No evidence in public records
Presence of monitoring/evaluation reports
No evidence in public records
Availability of a web-based monitoring tool
No evidence in public records
Impact assessment mechanism
Name of any specific impact assessment tools
unknown
Use of GIS in mapping impacts
No evidence in public records
Citizen involvement
Citizens involvement in assessment/evaluation
Unknown
Citizens involvement in the analysis of the assessment/evaluation
Unknown
Follow-up to the evaluation / assessment
Unknown
References
List of references
1.bydgoszcz.pl, (2017), ‘130 million co-financing for the modernization of rain drainage’ (‘130 mln zl dofinansowania na modernizację kanalizacji deszczowej’), https://www.bydgoszcz.pl/kategoria/tresc/130-mln-zl-dofinansowania-na-modernizacje-kanaliz/ (Accessed: 17 September 2020).
2.Stasiewicz, A., (2016), (‘Bydgoszcz zrobi porządek z kanalizacją deszczową),
http://www.pomorska.pl/wiadomosci/bydgoszcz/a/bydgoszcz-zrobi-porzadek-z-kanalizacja-deszczowa,11612186/ (Accessed: 17 September 2020).
Comments and notes
Public Images
Image
Source: https://pomorska.pl/bydgoszcz-zrobi-porzadek-z-kanalizacja-deszczowa/ga/11612186/zd/22020330
The need for a new drainage system in Bydgoszcz
Source: https://pomorska.pl/bydgoszcz-zrobi-porzadek-z-kanalizacja-deszczowa/ga/11612186/zd/22020330