Adyváros Lake Rehabilitation and Recreational Area
The project was part of a series of development projects which addressed the water management issues of the city. (Reference 1) The rehabilitation of a lake in the Adyváros neighbourhood included the renewal of the water reservoir, surrounding green areas, footpaths, and vegetation, as well as the installation of a new street light system, benches, trash cans, and unique street installations such as an interactive message board. (Reference 2) The interventions transformed the lake and its surroundings into a popular recreational area, frequented by locals. Since the completion of the project in 2014, there have been minor developments to the lake and its area, such as the renovation of the playground. (Reference 4) Apart from Adyváros, several other lakes were rehabilitated in several neighbourhoods (Adyváros, Győr-Szabadhegy, Marcalváros). (Reference 6)
The Bio Washing Machine
The Bio Washing Machine is a combination of an Aquifer Thermal Heat Storage (ATES) system and biological natural attenuation of groundwater and is thereby mainly focused on groundwater decontamination and energy storage. The ATES system accelerates the biological degradation of groundwater contamination and provides sustainable energy because cold water is pumped through buildings during the summer to cool the buildings and hot water during winter for heating. The groundwater decontamination measurements are aimed at protecting water in order to provide safe drinking water (ref. 1, 2, 3)
Bradford Beck project
The Bradford Beck project is a pilot project looking at new ways of managing and improving rivers. The Bradford Beck is a small river system of around 11km that flows through the City of Bradford. The beck used to be known as the filthiest river in England. In this project, activities are aimed at bringing the becks back to life and full health, for long term restoration of the Beck. It will provide a new focus of water-based socio-economic regeneration in Bradford (reference 1). The project established that a large proportion of the Bradford Beck catchment could be monitored with observations at just 12 strategic points along the course of the Beck, so observations would be made at all 12 points on different days of the week and at different times of the day (ref 6). A record of the status of the Beck at each point would be taken. This would include the level of the water, the colour of the water, smell, turbidity and a photograph of each site (ref 6).
Leidsche Rijn sustainable urban drainage system
The surface water system in the VINEX location Leidsche Rijn near Utrecht is a special water system. Nowhere in the Netherlands is the surface water of such a large urban area treated in such a sustainable and climate-proof manner (ref. 2). In Leidsche Rijn, a relatively new city district of Utrecht, a sustainable closed circuit water system was introduced including natural wetlands, bioswales, pumping stations and permeable paving which filters stormwater organically. It is viewed as a more sustainable solution compared to traditional stormwater infrastructure because it benefits biodiversity (e.g. by means of fish passages) and prevents the need for storm water facilities and the influx of unfiltered surface water from elsewhere (ref. 1-3).
The Water of Leith (Flood Prevention Scheme)
The Water of Leith is home to a wide diversity of plants and animals. The river performs an important flood control function in the city. A management plan envisions to create a healthy river that flows through a green corridor from the hills to the sea and is a haven for wildlife, is enjoyed and managed by the public, and is valued for its built and cultural heritage. The current intervention is about an extensive Flood Prevention Scheme. Walls and other flood defence measures have been constructed from Murrayfield downstream to Bonnington. A re-modelling exercise is being carried out to include the impact of climate change on the river system and the efficacy of the flood prevention scheme. The Water of Leith Conservation Trust works to conserve and enhance the river, its heritage and wildlife. It also promotes education and recreation and works with volunteers and community groups (ref 1, 2, 3).
Morningside Park
The Morningside Park is classified within the Edinburgh Public Parks and Gardens Strategy as a “Community Park”. This is a small, pleasant, elongated park area with tennis court, multi-sport area, grass areas and tarred pathways that make the Park an attractive facility for children, young people, adults and senior citizens. The park provides an essential green space in the heart of Morningside with a design which lends itself to a range of activities. The layout of the park provides healthy and safe routes between linked road networks along tree-lined paths. (ref. 1)
River Main: Restoration and floodplain consolidation
The Fechenheimer Mainbogen is the largest undeveloped floodplain area in Frankfurt am Main and a special recreational area in the Frankfurt Green Belt Internal link. Today, the Main Arch is mainly used for agriculture, but still contains numerous relics of a typical floodplain landscape, such as smaller floodplain trees, meadows and wet bank areas. Since 2015, the curve of the Main has been transformed back into a near-natural meadow landscape with water, alluvial forests and meadows in several steps. Animals and plants are given new valuable habitats and places of retreat, and people are given attractive recreational spaces in nature (10).
Green Corridor on Platenstraße
Platenstrasse in the Ginnheim district of Frankfurt was laid out as a four-lane feeder in the 1960s. It leads through the settlement of the same name, which was formerly the housing area of the US armed forces. After their withdrawal in 1994, the settlement came into municipal ownership. Many large families, often with a migration background, moved in. Wild parking lots and storage spaces were created without any quality of stay. In 2000, discussion about the redesign of the Plattenstrasse started and in 2015 it was completely transformed into a green corridor. The street space was rearranged and the paved areas were reduced to the necessary extent. Sensitive planning and respect for the established structures helped to preserve the character of the district while significantly increasing the green area with recreational facilities. (1)
Eco-District Plateau de Haye
"This disctrict of "Plateau de Haye" is part of the EcoQuartier approach, is one of the most ambitious urban renewal projects. In line with the development of the New Urban Renewal Program, work was carried out this year [2012] on the challenges of opening up territory to its urban and forestry environment in order to confirm the "Forest City" approach initiated by the architect-town planner Alexandre Chemetoff" (Ref. 1). It received the EcoQuartier National Grand Prize (Ref. 2). A forest, community gardens and a green corridor are being developed with a rainwater recovery system (Ref. 2). Work is set to continue until 2024 (Ref. 10). "It will first allow work to be done on the functionalities of the district : development of spaces freed up by the demolition of the Blanc Sycamore and the Purple Beech, reconversion of the Tamaris and Ombelles into housing, shops and spaces dedicated to companies, creation of green spaces , shared gardens and parking" (Ref. 10).
Sainte Marie Park and Festival of Nature
Park Sainte-Marie is the second largest park in Nancy (Ref. 8). "The park Sainte-Marie hides varieties of splendid oaks and many other rare plants. It also hosts that annual "Nature in Festivities" event in the first weekend of May which represents the largest plant market in the region (Ref. 2). "This park was awarded the "Tourism and Handicap" labels in 2007 and "Outstanding Garden" in 2010" (Ref. 1). "An old Alsatian House , created for the International Exhibition of the East of France in 1909" is conserved within the park (Ref. 8).

