Displaying 1 - 8 of 8

Ventanilla Wetlands

The "Ventanilla Wetlands" Regional Conservation Area (ACR) is an area of 275.45 hectares protected and administered by the Regional Management of Natural Resources and Environmental Management of the Regional Government of Callao (1, 2). It was established on December 20, 2006, by Supreme Decree No. 074-2006-AG, to conserve a representative sample of the coastal wetlands of the Subtropical Pacific Desert (2). With an ecosystem shaped by various hydrological and ecological processes, the "Ventanilla Wetlands" ACR is home to 126 bird species and 27 native plant species, making it an ideal area for ecotourism, recreational, educational, scientific, and cultural activities, thanks to its landscapes and biodiversity (2). However, the Ventanilla Wetlands face several challenges due to urban growth, water pollution, waste, traffic and plane overflights from the National Police and Navy, leading to a decline in bird populations due to noise exposure (5).
This area is fed by the hydrological system of the Chillón River, by surface waters from the Sedapal oxidation ponds, and by water seepage from nearby human settlements and populations adjacent to the wetland. The Ventanilla Wetlands are also influenced by the marine system, especially in the northwest zone. This gives the ACR area lagoon-like characteristics, meaning that its waters are slightly brackish despite being separated from the sea. The internal hydrological system supports the growth of species such as cattails, bulrushes, and reeds. In total, there are 27 native plant species, which serve the function of filtering and purifying the wetland's water. Additionally, the flora provides protection and food for various fauna species, particularly birds, with 126 species recorded, including resident and migratory birds from the Andes, local areas, and the Northern and Southern Hemispheres. Moreover, this protected natural area is home to five reptile species, including endemic species from Lima that are endangered (3).

Mapinguari National Park

Mapinguari National Park, located in the Amazon region of Brazil, is a protected area distinguished by its rich biodiversity and vast expanse of untouched tropical rainforest (2). It was officially created on June 5, 2008, by decree, covering an area of 1,776,914.18 hectares (2). The Chico Mendes Institute for Biodiversity Conservation (ICMBio) manages the park. It is linked to a management plan encompassing several nearby conservation units and their areas of influence (2, 3). Its main goal is to preserve the valuable natural ecosystems and scenic landscapes of the Purus-Madeira interfluvial region, which includes savanna enclaves (2, 3). The ecoregion where it is located has a high priority for botanical conservation due to parameters such as species richness and endemism (3). Additionally, the area presents great environmental heterogeneity, with several isolated and unique ecosystems, aspects that have been considered for fostering scientific research and public visitation, with programs for environmental education, recreation in contact with nature, and ecotourism (3). On March 8, 2013, an advisory council for the park was established to involve various stakeholders in decision-making and the effective conservation of the park (2), and in 2018 a Management Master Plan was established, seeking to develop an integrated approach for the protection and proper management of the region, especially considering the socio-environmental impacts of the construction of the BR-319 highway and the deforestation caused by fires, the expansion of soybean cultivation, land appropriation (7) and cattle ranching from the neighbouring state (3, 10). It was established as a Natural Park in 2008, but over the years it has undergone changes in land regulations, adding or decreasing its size as certain mining activities have been allowed in the buffer zone (2)

Green facade at physics institute

The Institute of Physics at Humboldt University of Berlin is an outstanding example of ecological urban development and a global pilot project integrating rainwater management with building cooling through greening. A key feature is the cooling system, which relies on air circulation processes supported by green roofs, facades, and an artificial wetland/pond incorporated into the building's exterior and courtyard.
Rainwater is collected in cisterns and used to irrigate the green façade, enabling evaporative cooling in air conditioning systems. Excess water is either evaporated in the inner courtyard through a pond or allowed to seep away. (Ref. 1; Ref. 4) The greening of the façade is directly linked to energy optimization. During summer, the green façade provides solar shading against extreme heat, while in winter, sunlight passes unobstructed through the glass façade. Additionally, evaporative cooling improves the microclimate inside the building and its surroundings. (Ref. 3)
Berlin, as a densely built city, faces challenges like urban heat and high energy demands for cooling. This project offers a research-driven solution. Monitoring measures water usage for various plants, evaluates evaporative cooling effects, and assesses impacts on the building's energy balance and overall economic and ecological performance. The findings aim to create a foundation for the long-term implementation of innovative, cost-effective technologies. This process is conducted by multiple regional universities. (Ref. 1)
The project was initiated and financed by the state of Berlin and implemented after the building's construction. (Ref. 4; Ref. 5) It serves as a benchmark for sustainable urban development and a research model for similar initiatives worldwide.

Dodder Valley Park Wetlands

Two new wetlands were established in Dodder Valley Park as part of the Dublin Urban Rivers Life Project (DURL). This project aimed to create integrated constructed wetlands (ICWs) at strategic locations in South Dublin County to purify wastewater and storm-water before it discharged into rivers.
The ICWs consisted of a series of cells resembling shallow ponds, typically 200 to 300 mm deep. Heavily planted with specific vegetation, these cells treated water by removing nutrients and harmful impurities, resulting in cleaner, purer water being discharged. The water flowing into the wetlands came from wastewater of misconnected appliances and storm-water pipes located under public roads, which collected rainwater from roads, footpaths, and the roofs and patios of houses.
These wetlands also provided important benefits, including flood alleviation, bioretention of particulates and nutrients, improved habitat conditions, and enhanced biodiversity. The project aimed to promote the relationship between green infrastructure and public well-being, creating a complex biological system that supports a diverse range of plants, animals, microorganisms, and hopefully attracts frogs, newts, and birds.
To increase native biodiversity, the wetlands were designed with pollinator-friendly plants and trees, making them visually appealing for park users and the public. A Wetland Planting Day took place on September 9, 2022, with over 40 participants, including residents and representatives from local organizations. This phase of the project fulfilled not only the objectives of the LIFE project but also those of the River Basin Masin Management Plan 2022–2027, the Water Framework Directive, the Climate Change Action Plan, the Floods Directive. (1, 2, 5)

Upper Detroit Riverfront Parks Habitat Restoration

The Upper Detroit Riverfront Habitat and Parks Restoration Project aims to restore and enhance vital fish and wildlife habitats along the Detroit River. This initiative seeks to rehabilitate approximately 30 acres of upland and shoreline habitats within Riverfront-Lakewood East Park, A.B. Ford Park, and Mariners Park (all located alongside the river), covering nearly one mile of the Detroit River and its shorelines.
Key outcomes include improving approximately 1,000 linear feet of existing shoreline along the Detroit River by incorporating native wetland edges and fish spawning shelves into the restoration efforts. The project also plans to enhance around 2,000 linear feet of canal shoreline and 800 linear feet along Fox Creek to create or improve habitats for fish and herpetological species. In Riverfront-Lakewood East Park, 28 acres are targeted for the establishment or enhancement of native vegetation to support birds, mammals, and pollinators. If feasible, the creation of about 7 acres of wetlands, along with shallow and deep-water habitats, is also part of the vision.
The project is guided by the City of Detroit's 2017 Parks and Recreation Improvement Plan and represents part of a broader strategy to revitalize the city’s green spaces after years of underfunding. With renewed commitment, the city has allocated nearly $12 million to enhance neighborhood parks, particularly in areas that have lacked investment over the past decade.
However, the project was temporarily halted in 2020 due to high water levels causing flooding in the adjacent neighborhood. As of 2024, it remains on hold while the City of Detroit conducts a flood mitigation study. Despite this delay, the project remains a critical step toward fostering community stewardship and creating sustainable green spaces that improve the quality of life for all Detroit residents.
(Ref. 1, 4, 5)

Gardens in schools project

The "Gardens in Schools" project (September 2021 to December 2022) aimed to establish gardens in 15 schools across four municipalities within the Communauté d'Agglomération du Centre de la Martinique (CACEM), including Fort-de-France. The goal was to provide educational and technical resources for teachers to conduct workshops on sustainable development, pollution, and agroecology. The project encouraged schools to maintain these gardens autonomously as long-term educational tools. Students were involved in greening their schools and growing their own fruits and vegetables, while teachers received three training sessions and ongoing support through the community-based "Koudmen" tradition (Ref 1; 3). The project also involved distributing 45 gardening kits to schools across the island.( 1; 2; 3).

The project was led by the Ypiranga da Pastinha Popular Cultural Center (CCYPM) in collaboration with the STE2D academic mission on sustainable development education (a joint effort of the Martinican School Rectorate and CACEM). Financial support came from the Ministry for Food, Agriculture, and the Forest (DAAF) and CACEM (Ref 1; 3).

The project was designed to promote sustainable development education, enable self-sustaining school gardens, and raise awareness about pollution and agroecology among students and teachers.

The project supported the municipal strategy to develop urban gardens and aimed to integrate environmental education into school curriculums and it aligned with the urban gardening strategy "Jaden l’anmou," which included the municipality of Fort-de-France (Ref 1; 2; 3). (Ref 1; 2; 3)

Griffeen Valley Park Wetlands

The Dublin Urban Rivers LIFE (DURL) project incorporates two interconnected wetlands in Griffeen Park as part of its broader initiative to improve water quality, natural water management and aquatic biodiversity in urban areas. These wetlands were specifically designed as a natural sewage system to treat wastewater from the surrounding areas, addressing a significant environmental issue known as "domestic misconnection." Domestic misconnection occurs when household appliances, such as washing machines, dishwashers, and kitchen sinks, are incorrectly linked to surface water drains rather than the sewage system. This leads to untreated wastewater being directly discharged into local waterways, contributing to contamination.
In the River Griffeen catchment, which includes approximately 12,000 dwellings and associated infrastructure, domestic misconnections are a considerable threat to water quality. The DURL project focuses on identifying and rectifying these misconnected appliances to ensure that wastewater is properly treated before entering the river. This process will not only improve water quality but will also provide flood alleviation and support healthier aquatic ecosystems in the area.
The project is aligned with broader environmental policies, including the River Basin Management Plan 2022-2027, the Water Framework Directive, the Climate Change Action Plan, the Floods Directive, and the draft Biodiversity Plan. One of the key strategies is to use a Geographic Information System (GIS) to streamline inspections for domestic misconnections, making the process faster and more cost-effective.
The constructed wetlands in Griffeen Park, with a standing water depth of approximately 30 cm, are planted with a variety of native Irish species. These wetlands offer a natural, sustainable solution to wastewater treatment, with the potential for similar applications across Europe. (Ref. 2, 4)

Patch of Heaven

The himmelbeet is an intercultural, inclusive community garden in Berlin that has been inviting people to garden and harvest their own produce since 2013. The garden offers around 200 raised beds that are communal and can be rented by neighbors, individuals and institutions (Ref. 1; Ref. 3). The project aims to familiarize children and adults with ecology, sustainability and healthy eating and to offer space for social exchange and education, while being inclusive to people with different (dis)abilities and backgrounds (Ref. 2; Ref. 6). The design and implementation of environmental education workshops are a vital part of the work. (Ref. 1; Ref. 6) With its own café and vegetable production, himmelbeet is strongly oriented towards the principles of the economy for the common good. The garden team also looks after other gardens in the city - on behalf of educational institutions, social institutions, housing associations and neighborhoods. (Ref. 1; Ref. 6)
Originally located in Ruheplatzstrasse, the garden moved in 2021 to Gartenstrasse, because of land disputes with the providing land owners and the demand of the space for other social projects. (Ref. 8; Ref. 11)