Recreation park Bremen West (Walle and Gröpelingen)
Revitalization of a large urban park in the Walle and Gröpelingen districts of Bremen. The current park constitutes a neglected area of the former port and shipyards sites with around 4,000 small garden parcels.The local government consulted with numerous societal actors the envisioned project, which aims at the revitalization of the park's both green and blue infrastructure. The goal of the intervention is to create a large recreational park for the districts of Walle and Gröpelingen, which will improve the image of the districts, help with their economic revitalization and provide sustainable practices for urban green care and community gardening (Ref. 2, 3). "Between September 2017 and September 2020, the Green West of Bremen was the focus of the federally funded project "Green Urban Labs" (Ref. 5). As of 2020, "Several of these building blocks have already been started or implemented and have led to an improvement in the cooperation between the actors on site, to an upgrading of the infrastructure and biotopes as well as to an increase in the popularity of the previously rather unknown area" (Ref. 5).
Beach park in Bremen
A project of the local government developed with EU and federal funds that aimed at the development of the green and beach area in the course of the refurbishment of the flood protection system. The initiative sought to provide a model project for urban flood protection, which can showcase that flood protection measures do not require a separation between city and water and new recreational spaces at the water and shore can be created instead. The project involves redevelopment of the shore area, enlargement of the public space at the shore with additional sand deposit and greenery planting (Ref. 1, 2). The bank area with a beach and recreational facilities opened in May 2019 (Ref. 5).
Southern City Park
The multifunctional Southern City Park in Nurnberg was organized in the place of the large car park alongside the railway. Construction of the new green area between Celtisplatz and Tafelfeldstrasse was built in three construction sections. In the western part, the green playground with cableway, slide and climbing rocks was arranged, the Karl-Bröger-Platz was equipped with benches and a fountain, whereas to the east a large green area with 76 newly planted trees was established (1, 4) Perennial plantings were arranged in eastern section of the park, which members of the Bund Naturschutz maintain on a voluntary basis. The park is also a place where social and cultural events are organized. (4)
Abandoibarra's Green Oasis
Abandoibarra is an area of the town of Bilbao, next to the Bilbao estuary, sizing 348,500 square meters. Abandoibarra has been the industrial zone of Bilbao, where shipyards and other companies related to the industrial sector were located. Building upon the 1997 master plan completed by Balmori Associates, Pelli Clarke Pelli Architects and Aguinaga y Asociados, the area has been reinvented as an international cultural district and tourist destination. Two-thirds of the 30-hectare site is dedicated to parks and open spaces, creating a public oasis and grounds for a suite of buildings by master architects (Ref 1,2).
Blue-Green Infrastructure in Neighborhood
The project aims to completely redevelop ‘Rozemaai’, a neighborhood in Antwerp, focusing on climate change adaptation, green spaces, and recreation. This includes a sustainable drainage system in which storm water flows via swales into a water stream with nature-friendly river banks, trees and bushes in the neighborhood, green parking lots, allotments and recreational facilities such as picnic tables (Ref. 1, 2, 3, 4, 5). Since 2019, the district has had a new, accessible park in which the Donkse brook plays a leading role (Ref. 7).
Integrated Alcantarilla Parks (Green Lung)
The municipality aimed to establish a zone in Murcia that worked as a "green lung" for the city while making it its engine for economic, social and cultural development (Ref 2). For this, the municipality planned and implemented the project of "Integrated Alcantarilla Parks". It includes several parks, with the priority of creating one in the surroundings of the Ethnological Orchards Murcia's Museum (Ref 1). The project is called integrated as it is based on the integral values of sustainability where the environment, the economic development and the socio-cultural needs are compatible (Ref 2). For this, there will be sustainable architecture, recovery of the natural environment, as well as incorporating the historical heritage in the public green areas of a specific zone (Ref 3). There are many parks that are part of this project, the last one was the Ibarra de Murcia Park in 2020 (Ref 7 and 8).
Sustainable Park Spoor Noord (North Railway Park)
Park Track North (Park Spoor Noord) is built on a former railway territory and was aimed to provide a social, green and mobility 'corridor' as the territory disconnected parts of the city (Ref. 1,4). Now, the park has a sustainable drainage system, allows a maximum diversity of people to use the park and has trees that will last for a long time. The park is further considered sustainable because of the use of FSC wood, re-used materials and energy-efficient lighting while the historical railway elements are restored or reused (Ref. 1,7).
Regeneration of the Central station area
The Lolli-Malaspina area of the central station intervention aims to replace the current urban space and to replace it with a system that can complete and integrate the existing one, and generate a new centrality, transforming the current laceration into an urban seam. There are new gardens outside the central station, which link the different areas of the railway, and it has been implemented because the area of the central station is a strategical node for the city which has to be reinforced with new green areas. (Ref.1.)
Bidston Moss project
Until the 1990's Bidston Moss was a landfill site and was "unsafe for public access", thus giving a negative impression (close to several residential areas). Restoring work begun in 1995, and in 2006 development started in Bidston Moss through a Newlands scheme: including new features and landscape enhancements to “unlock the full potential” of the area (“as a valued and well-used community woodland for local people and wildlife.”). (Ref. 1, 2)
Wirral Waters project
Wirral Waters is the largest regeneration project in the UK. It will transform over 500 acres of the Birkenhead docklands into an internationally recognizable destination (where e.g. innovation and sustainability will thrive). (Ref. 1, 2). While the whole project will take up to 30 years to finish, the first phase has started in 2019 and building work has begun on three projects which will bring 1,000 homes and breathe new life into 500 acres of former dockland in the town. £220 million will be invested in the next three to four years alone in an effort to build high quality, high-density accommodation with lots of green space and employment opportunities close by (Ref 10,11).

