Displaying 211 - 220 of 437

CITYWATER: Biofiltration at Maunulanpuisto Park

As part of the EU Life+ CITYWATER project (of 3 cities), a sustainable stormwater management solution based on biofiltration was implemented in Maunulanpuisto Park in Helsinki, in order to purify rainwater and meltwater and improve water quality in the Haaganpuro Brook.
As the drainage area is heavily trafficked and paved with asphalt, high solid, nutrient and oil levels have occasionally been measured in the rainwater and meltwater entering the Haaganpuro brook. Such contamination is harmful to the fish stocks (e.g. trout) and other organisms in the brook. The biofiltration solution was the first of its kind in Helsinki. The solution also supported the City of Helsinki stormwater strategy, which aims at changing management towards sustainable solutions and states that stormwater should in first hand be infiltrated on spot, where it is created (ref. 1).

Urban Orchards of Mallorca

The government of Mallorca promotes orchards, as part of an ecological movement in Spain. As a result, five orchards were constructed, reclaiming abandoned urban spaces by the Mallorca city government in 2010.
The project has three pillars: strengthening social cohesion and inclusion, creating opportunities for education and for recreation. They were also constructed with pensioners in mind (Ref 2).
There would be an annual draw to give to distribute the orchards. However, this got delayed since 2013. In 2019, the municipality took back the property from the previous owners, and one of the orchards was taken from the list of orchards due to its bad conditions (Ref 5). In 2020, there was going to be a new draw for the distribution of orchards with new focus groups requirements but due to Covid19, this project has been paused (Ref 5).

Green Infrastructure For Tomorrow in Medway

GIFT-T (Green Infrastructure For Tomorrow - Together!) is a four-year European project of which Medway was one of five case studies. In this project communities, businesses and governments were brought together to facilitate bottom up planning and implementation of green infrastructure (Ref 1). The product of this is a general business plan, and the planned intervention of focus here is the "Thames Terrace Invertebrates - corridors for wildlife" (Ref 2). Hoo Island already has areas that serve well to sustain invertebra species, but as of yet also has underutilised potential in this respect. This intervention addresses the latter.

Bioswales for flood protection

Following an extreme flood event on August 9th 2008 in Glendhu Park, eight houses experienced flooding and many more came within inches of being flooded. Two swales were constructed by Dublin City Council to provide surface water storage to ensure that no flooding will recur in a similar 100-year pluvial event. The swales are designed to self-drain back into the existing surface water sewer system following a severe storm event (Ref. 1).

Lodge Hill Settlement

Lodge Hill is a nature area allocated to become a settlement capable of delivering approximately 5000 dwellings by 2028 (original plans). Green infrastructure is a key component of the current plans and specific GI implementation will be based on the existing GI assets. Specifically, the plans include green corridors, sustainable urban drainage systems (SUDs), various parks and street greenery, community allotments, buffer zones around sites of special scientific importance (SSSIs) and woodland (Ref 1).
The plans for Lodge Hill have been controversial, as Chattenden Woods and Lodge Hill Site of Special Scientific Interest (SSSI) is a nationally important area of ancient woodland and rare grassland that supports one of the largest populations of nightingales in the UK (Ref. 7, 8, 9).
In 2018 Kent Wildlife Trust started a campaign (#SaveLodgeHill) to ask Medway Council to not to allocate Lodge Hill development, which has resulted in a scaled-back version of the original plans for Lodge Hill from the construction of 2,000 to 500 houses, avoiding any direct loss of the Site of Special Scientific Interest - which will still have an impact on the nightingale's population (Reg. 7).

The square of silence in Mariampol, Bydgoszcz

Owing to the city’s participatory budget, the residents created a well-equipped green recreational square in a vacant area of one of Bydgoszcz's neighbourhoods. The initiative involved the creation of an outdoor gym with several exercise equipment stations, as well as planting pollution-resistant trees and bushes - including oaks, maples, pine and spruce. The initiative aims to manage vacant space and increase access to the green space in this city district [1].

More trees and shrubs by the city lake

The initiative was funded from the participatory budget of the city and resulted in planting new greenery (including 70 trees and a thousand shrubs) by the local city lake 'Balaton' in Bydgoszcz. The justification of the project in its proposal highlights the practical and aesthetic values of green areas [1].

Malecon Botanical Garden Recovery

There have been different activities throughout the time to recover and improve the Malecon Botanical Garden. In 2012, the main activity was to recover the Malecon Botanical Garden by introducing a collection of Mediterranean species and of other ethnobotanicals plants and delivering some other environmental services to the location (Ref 1). In 2019, there were different works to rehabilitate the Garden for the September Fair, and also some other plans to create a cultural and artistic space within the Garden (Ref 10 and 11).
The project has completed its first stage, but there is an ongoing number of initiatives to rehabilitate and improve the garden (Ref 9 and 10).
Regarding the status of the project, the first stage has been completed, but an ongoing initiative to rehabilitate and improve the garden is taking place (Ref 9 and 10).

Constructed Wetland

Wetlands provide a varying degree of treatment of discharged water and are ideally suited for the containment and treatment of polluted water runoff, being a holistic example of Sustainable Drainage Systems (SuDS). The Dublin Local Authority installed an Integrated Constructed Wetland to treat polluted water discharged from the urban area, with the aim of cleaning urban runoff and drainage water. It was meant to purify water that discharges into a pond, and later on into the Tolka river. The project has been very successful in treating polluted water effectively, according to studies. (Ref. 1; Ref. 3)

Modernization of the rain drainage system in Bydgoszcz

The city of Bydgoszcz modernizes the rain drainage system with the support of EU funds. The current badly functioning rain drainage system (with sanded and littered canals) prevents from unobstructed rainwater flow to the Brda and Vistula Rivers or the Bydgoszcz Canal. This in turn leads to frequent floods in the city. The project is planned for the period between 2017 and 2021 and involves water purification and management of rainwater in the grey and green urban areas as well as reuse of the collected water for watering urban greenery [1,2].