Displaying 171 - 180 of 1268

The Three Mile Creek Hydrological Restoration

The Three Mile Creek Hydrological Restoration project is taking place in one historic channel of the Three Mile Creek, located east of Dr. Martin Luther King, Jr. Avenue, and covering approximately 1,800 linear feet (Ref 3). This project, led by the City of Mobile, aims to remove sediment from the stream channel. This segment of the Creek was bypassed with a straight channel in the early 1980s to control flooding in the area, thus accelerating the accumulation of sediments in the historic channel (Ref 1).
The project's goal is to restore and maintain the natural flow to the historic channel and create a connection to the City and County's Blueway initiatives (Ref 3). This will improve habitat conditions and water quality and help to protect the area’s estuarine and marine water resources (Ref 8). It will also contribute to revitalizing the Three Mile Creek Watershed and provide increased recreational opportunities for citizens, like kayaking and canoeing (Ref 6). Construction work occurred in 2022 and 2023 (Ref 3).
The Three Mile Creek Hydrological Restoration is a key component of the Mobile Bay Shore Habitat Conservation and Acquisition Initiative, which focuses on acquiring, restoring, and preserving habitats, including riparian, wetland, and upland areas that support various fish and wildlife species affected by the environmental disasters of the Deepwater Horizon oil spill that occurred in 2010 (Ref 1). The project spans three critical areas: 450 acres within the Three Mile Creek Watershed (as detailed in this project profile), 300 acres in the Dog River Watershed, and 40 acres of bay shore property in the Garrows Bend Watershed (with the latter two areas being part of separate initiatives) (Ref 4).

Forest Park La Molina

The intervention of the Ecological Park of La Molina is an urban-landscape design project developed between the San Martín de Porres University, through the IVUC, the Institute of Housing, Urban Planning and Construction, and the Municipality of La Molina (7). This is the first ecological park in the city of Lima, located in a characteristic ecosystem such as Las Lomas, between 600-1000 m.a.s.l. (1). It is a natural area that is part of the hill system of Villa María del Triunfo, located in the Subtropical Coastal Desert ecoregion, and is part of the Regional Conservation Area ‘Sistema de Lomas de Lima’ (7). The City Council decided to open this space in 2022 to the public, as a 200-hectare area, designed to bring people closer to nature, through outdoor activities and environmental education about its fauna, flora and microclimates (1). Thus, citizens can enjoy a recreational area with multi-purpose spaces and sports circuits; a cultural area where workshops and an open-air amphitheatre are held; an ecological interpretation area with exhibition galleries and an interpretative route; and an administrative and control area (1). The park also envisages reforestation efforts in areas that are currently arid and infertile to convert them into green areas for the enjoyment of citizens (1). In 2023, conservation efforts were reinforced for an additional 50 hectares, due to the danger posed by encroachment and land trafficking (4).

Medicinal plant library in Tivoli

The first medicinal plant library in Martinique was created by the Ypiranga Martinique association, which inaugurated the project in 2019. The initiative was developed to preserve and revitalize traditional knowledge of medicinal plants in Martinique, integrating agroecology , modern scientific understanding, and ancestral practices.
The project is located on land provided by the municipality in the Tivoli neighborhood, and it serves as an educational resource, a functional pharmacy, and includes a small shared vegetables garden. Visitors, local residents, and researchers can access information on over 150 native Caribbean plants and their medicinal properties. The site includes two educational trails: one following the river that crosses the garden and a sensory trail designed to help visitors "reconnect with nature." Each plant is identified with information boards detailing its medicinal uses, including whether these uses are scientifically validated.
The project also aims to address social exclusion by offering reintegration workshops to troubled teenagers and the unemployed.
The project was financed through a combination of sources: an EU-funded call for projects, a crowdfunding campaign, and regional and national public subsidies.
As a result of its success, in 2021 the initiative was formally replicated with the support of the Caribbean Interreg "OSAIN" project, which led to the creation of 14 additional plant libraries in schools and public spaces. Volunteers and community-based efforts continue to sustain the project, and it has become a model for similar initiatives. (Ref. 1,2,4,5,6,7)

Restoration of the Coastal Lagoon of El Laguito

The "Recuperación del Laguito" project aims to restore El Laguito, a coastal water body in Cartagena, Colombia, severely affected by sedimentation that blocks natural water exchange with the Caribbean Sea. This blockage has led to stagnant, low-oxygen water, degrading water quality and aquatic ecosystems (ref 1). The project seeks to restore El Laguito’s environmental and social functions by reestablishing seawater flow, reducing sediment impact, improving water quality, and reviving the ecosystem. Additionally, it aims to provide data to guide long-term solutions for sustainably managing this community resource (ref 1).
The project is a response to recurring ecological crises, such as frequent fish die-offs due to low oxygen levels. Local residents initially took matters into their own hands, manually attempting to reopen the channel. The formal intervention started following a 2019 directive from the Ministry of Environment and Sustainable Development, outlining a phased strategy: short-term installation of an axial pump for water exchange, medium-term studies for a permanent fix, and long-term construction plans (ref 3). Currently, the project involves using heavy machinery to clear sediment and allow seawater inflow, supported by the Gobernación de Bolívar, Cardique, and the Cartagena Mayor's Office. This phase serves as a transitional step towards a more sustainable, permanent solution (ref 2). The project’s impacts focus on ecological restoration. Short-term benefits include better oxygenation, reduced harmful algal blooms, and revived marine life. Long-term goals encompass sustainable water management, ecosystem stabilization, tourism enhancement, and the development of recreational and sports facilities in harmony with environmental conservation (ref 4).

Maskinparken

Maskinparken is a new park covering 3700 m2 in the Lindholmen district, a new neighbourhood in a previous industrial/harbour area [Ref. 5]. The park is described as a well-needed green oasis or green lung in the developing area. The park finished construction in 2022 and is intended to provide access to green space for people living and working nearby. It is also designed as a blue-green stormwater management solution, where about 500 m3 of rainwater can be stored in the lower areas during heavy rainfall. Stormwater will be leaked from surrounding grey areas to the park to protect them from flooding. The Swedish National Board of Housing, Building and Planning (Boverket) has highlighted the park as a good example of climate adaptation in urban planning. The park has a variety of plants such as different tree species and flowering meadows, and plants that can withstand being soaked in the lower areas. Plants can grow in different landscape structures, such as hills and a pergola. The park also has amenities such as benches and lights, which are designed to mirror the style of the surrounding, older industrial brick buildings [Ref. 1-4].

Urban regeneration of Depou CTP

The last large-scale park in Iași was opened in 1923, and since then, the city has lacked any significant new green spaces. With the European Union recommending at least 26 square meters of green space per resident and the city's increasing urban density, the need for a new park is undeniable.
To address this, the Municipality of Iași is launching its first major park project in over a century. The project aims to transform the current CTP depot (tram station) into a 4.5-hectare, accessible green space in a densely populated area with strong development potential. This new park is envisioned as a green oasis that will enhance residents' quality of life while promoting environmental sustainability and urban renewal.
The initiative has received widespread public support, with citizens proposing the creation of a local museum to honor the tram station’s historical significance—one of the oldest in the city, with over 100 years of history. A consultation process has been established, involving local residents, NGOs, and a group of experts, including urban planners, architects, and mobility and environment officials, all contributing to the planning stage. Public suggestions for the park include underground parking, recreational and exercise facilities, and a diverse range of vegetation. Ensuring accessibility for all citizens and visitors is also a key priority in the park's design.
The municipality has allocated 300,000 euros for a solutions contest to finalize the approach to redeveloping the tram station. (1, 2, 3, 4, 5, 8, 9)

Dodder Valley Park Wetlands

Two new wetlands were established in Dodder Valley Park as part of the Dublin Urban Rivers Life Project (DURL). This project aimed to create integrated constructed wetlands (ICWs) at strategic locations in South Dublin County to purify wastewater and storm-water before it discharged into rivers.
The ICWs consisted of a series of cells resembling shallow ponds, typically 200 to 300 mm deep. Heavily planted with specific vegetation, these cells treated water by removing nutrients and harmful impurities, resulting in cleaner, purer water being discharged. The water flowing into the wetlands came from wastewater of misconnected appliances and storm-water pipes located under public roads, which collected rainwater from roads, footpaths, and the roofs and patios of houses.
These wetlands also provided important benefits, including flood alleviation, bioretention of particulates and nutrients, improved habitat conditions, and enhanced biodiversity. The project aimed to promote the relationship between green infrastructure and public well-being, creating a complex biological system that supports a diverse range of plants, animals, microorganisms, and hopefully attracts frogs, newts, and birds.
To increase native biodiversity, the wetlands were designed with pollinator-friendly plants and trees, making them visually appealing for park users and the public. A Wetland Planting Day took place on September 9, 2022, with over 40 participants, including residents and representatives from local organizations. This phase of the project fulfilled not only the objectives of the LIFE project but also those of the River Basin Masin Management Plan 2022–2027, the Water Framework Directive, the Climate Change Action Plan, the Floods Directive. (1, 2, 5)

Requalification of Poetto Beach

The project at Poetto Beach in Cagliari, Italy, implemented by the municipality of Cagliari, began in 2022. It focuses on protecting and restoring the dune system while raising public awareness about the importance of preserving the coastal ecosystem. The project recognizes the delicate balance between environmental preservation and public enjoyment of Poetto Beach.
Key activities include installing barriers and signs to prevent trampling and littering, modifying beach access points to reduce erosion, and implementing significant interventions to restore the beach. These interventions involve strengthening anti-erosion measures with dune confinement and sand retention systems, as well as creating natural barriers (natural repopulation of native plants ) to protect the seashore. Public education initiatives aim to encourage responsible beach use and enhance understanding of the dunes' fragility. Additionally, new access walkways will be installed, and existing ones will be improved, including the creation of four wheelchair-accessible pathways to the water, designed for easy entry.
This comprehensive plan for protecting and enhancing Poetto's environmental resources is valued at €945,000 and is funded by the European Regional Development Fund.
Overall, the goal is to enhance environmental quality, promote sustainable beach use, and prevent both natural and economic losses. By balancing enjoyment of Poetto's natural resources with their protection, the project aims to ensure the long-term preservation of this valuable coastal area (Ref. 1, 2 & 4).

Corridor of Cartagena - Barranquilla

The Cartagena-Barranquilla Road Corridor project, led by the National Infrastructure Agency (Agencia Nacional de Infraestructura (ANI)), covers 146.7 km to enhance connectivity between Cartagena and Barranquilla (ref 2). While primarily a transportation initiative, the project stands out for its focus on environmental conservation and community development. A major goal is the restoration of ecosystems and biodiversity protection. To this end, over 40,000 mangrove seedlings have been planted in the 34.13-hectare Ciénaga de la Virgen, a vital coastal wetland in Cartagena. These mangroves play a crucial role in restoring habitats, capturing carbon, and acting as natural flood barriers, thereby safeguarding nearby communities (ref 1,4,6). The project also tackles hazards like wildlife-vehicle collisions and habitat fragmentation. Seven wildlife crossings have been built to facilitate the safe movement of species, including the endangered Blue Crab (Cardisoma guanhumi) in the Ciénaga de Mallorquín. These crossings are essential for preserving local wildlife (ref 1,7).
In terms of socio-economic impact, the project has created over 9,000 jobs and established six bioclimatic nurseries, which provide sustainable livelihoods for communities in La Boquilla, Villa Gloria, Tierra Baja, and Puerto Rey. These nurseries support mangrove restoration and offer local people opportunities to participate in planting, monitoring, and maintenance activities. This approach fosters a circular economy, empowering community members, both men and women, to engage in sustainable economic practices (ref 1,2,6).
Overall, the Cartagena-Barranquilla Road Corridor is more than a transport project; it acts as a green corridor with a comprehensive approach that combines environmental conservation, hazard mitigation, and socio-economic development.

Rike Park

Rike Park, centrally located on the riverbank of the Kura River, is one of the most recently developed Parks in Tbilisi. It was announced by the city hall in 2009 with the aim to increase the amount of accessible green space in the densely developed city center and stretches over an area of 7.5 ha (Ref. 1). Being the only location in the city where such a project could have been developed, it also serves as a pedestrian-friendly way to cross from the newer part of the city towards the old town via the adjacent "Peace Bridge" (Ref. 1,3). Next to its various amenities for recreation, the park has become a symbol of national identity through its design (Ref. 2). From above, one can identify the grid abstraction of the map of Georgia while in the center of the park lies a large Rose shaped mosaic, making a symbolic reference to the Rose Revolution (Ref. 3,5). Furthermore, Rike Park hosts several cultural festivities and artistic performances that invite the public to interact and socialize (Ref. 4).
Despite the park's success, its development has been criticised due to the city hall's exclusion of public consultations and transparency (Ref. 1).