Poppintree Park
Ballymun is a suburban area on the north side of Dublin, Ireland. Originally developed in the 1960s, Ballymun was built to address Dublin’s post-war housing shortages, with iconic high-rise towers and flat complexes. However, over the years, the area faced social and economic challenges, leading to a reputation for issues such as poverty, unemployment, and lack of services.
In response, the Irish government launched the Ballymun Regeneration Project in the late 1990s. As part of the Ballymun Regeneration, Poppintree Park has been transformed into a 45-acre public space at the heart of Ireland’s celebrated urban renewal project in Ballymun Town Centre. This redevelopment followed an extensive public consultation process, incorporating input from local residents, sports clubs, community groups, and youth organizations.
Poppintree Park now offers a range of upgraded amenities, including a Tree Trail featuring 15 native tree species, enhanced biodiversity, extensive wetlands, sustainable drainage systems, and spaces for passive and active recreation. The park also features a 1.25-acre playground for children aged 0-12, an amphitheater with a permanent pond, and a fully accessible pathway network with abundant seating and viewing areas. Over 50,000 plants have been added to enhance the park’s natural beauty.
The park’s transformation, led by Ballymun Regeneration Ltd., involved significant engineering and landscaping efforts. Mitchell + Associates provided the detailed landscape design, construction drawings, and supervised the landscape works.
Completed in 2010, Phase 1 of Poppintree Park’s redevelopment represents an investment exceeding €6 million. The project includes substantial earthworks, drainage systems, gabion walls, three limestone-paved entrance plazas, structural retaining walls, a cantilevered pond walkway, diverse path surfaces, and high-quality playground construction. (1-7, 10)
In response, the Irish government launched the Ballymun Regeneration Project in the late 1990s. As part of the Ballymun Regeneration, Poppintree Park has been transformed into a 45-acre public space at the heart of Ireland’s celebrated urban renewal project in Ballymun Town Centre. This redevelopment followed an extensive public consultation process, incorporating input from local residents, sports clubs, community groups, and youth organizations.
Poppintree Park now offers a range of upgraded amenities, including a Tree Trail featuring 15 native tree species, enhanced biodiversity, extensive wetlands, sustainable drainage systems, and spaces for passive and active recreation. The park also features a 1.25-acre playground for children aged 0-12, an amphitheater with a permanent pond, and a fully accessible pathway network with abundant seating and viewing areas. Over 50,000 plants have been added to enhance the park’s natural beauty.
The park’s transformation, led by Ballymun Regeneration Ltd., involved significant engineering and landscaping efforts. Mitchell + Associates provided the detailed landscape design, construction drawings, and supervised the landscape works.
Completed in 2010, Phase 1 of Poppintree Park’s redevelopment represents an investment exceeding €6 million. The project includes substantial earthworks, drainage systems, gabion walls, three limestone-paved entrance plazas, structural retaining walls, a cantilevered pond walkway, diverse path surfaces, and high-quality playground construction. (1-7, 10)
Afforestation of the Mallasa Landfill
This initiative was launched by the local government of La Paz, focusing on afforestation of the Mallasa landfill, which was closed in 2004 (1-4 & 6-10). While some plantations were established in the area when the landfill was closed, the overall plan aimed to manage the waste until the site was sufficiently clean for new projects—a process expected to take at least a decade (6). By 2021, signs of biodiversity, including flora and fauna, had begun to return to the former landfill. In response, the municipality of La Paz implemented a project to plant 6,000 native tree species, along with other shrub species, to further enhance biodiversity regeneration and establish a second urban forest in the city (3 & 4 & 7 & 8).
The afforestation efforts took place between 2021 and 2022, coordinated through "forestry brigades" made up of diverse volunteer groups. These groups included members from public institutions, private company representatives, NGOs (both environmental and non-environmental), universities, religious organizations, and local citizen groups (8-10). A total of 12 hectares were reforested out of the 33-hectare area (1 & 7). Following this, the area was closed to the public and is expected to become a biodiversity sanctuary within ten years, with ongoing monitoring by the municipal environmental agency (7). Among the trees planted, some were chosen to attract birds with their fruit, others to support the pollination of hummingbirds and bees, while others were intended to enrich the soil with nutrients—all species being native to the region (3 & 7).
Additional goals of the initiative include raising awareness about climate change, fostering a sense of environmental stewardship through community engagement, and advancing the municipality's decarbonization plans (3 & 9). Some of the seedlings and saplings were purchased by the municipality at a cost of 6,160 euros, with private companies also contributing financial support to the initiative (1 & 7).
The afforestation efforts took place between 2021 and 2022, coordinated through "forestry brigades" made up of diverse volunteer groups. These groups included members from public institutions, private company representatives, NGOs (both environmental and non-environmental), universities, religious organizations, and local citizen groups (8-10). A total of 12 hectares were reforested out of the 33-hectare area (1 & 7). Following this, the area was closed to the public and is expected to become a biodiversity sanctuary within ten years, with ongoing monitoring by the municipal environmental agency (7). Among the trees planted, some were chosen to attract birds with their fruit, others to support the pollination of hummingbirds and bees, while others were intended to enrich the soil with nutrients—all species being native to the region (3 & 7).
Additional goals of the initiative include raising awareness about climate change, fostering a sense of environmental stewardship through community engagement, and advancing the municipality's decarbonization plans (3 & 9). Some of the seedlings and saplings were purchased by the municipality at a cost of 6,160 euros, with private companies also contributing financial support to the initiative (1 & 7).
Extension of the Tagus Estuary Linear Riverside Park
The Tagus Estuary Linear Riverside Park is a significant environmental and recreational project in Vila Franca de Xira. As part of a broader urban regeneration initiative, the park aimed to enhance the natural and cultural landscape by promoting ecological regeneration while providing public access to the Tagus River (Ref 1). Created in 2013, the park has won several international awards and since then, the park has undergone several extensions. In 2017, another 700-meter walkway was added towards Santa Iria, and the inhabitants of this urban area of Vila Franca de Xira widely use it (Ref. 6). The park covers over 14 hectares and includes pedestrian and cycling paths, environmental education facilities such as the Bird Observatory, and the Environmental and Landscape Interpretation Centre (Ref 2).
Recently announced in 2023, the park's newest expansion is set to extend the riverside trails further, creating a continuous route from Lisbon to Alhandra (Ref 5). With future phases planned, the project is expected to significantly increase public interaction with the riverfront and its biodiversity (Ref 5). In this new project phase, the Vila Franca de Xira Municipal Council begins the requalification and environmental and landscape conservation of another section of the riverfront of the Municipality of Vila Franca de Xira, between Alverca and Sobralinho, covering an extension of approximately 4.9 km and an area of approximately 14.1 hectares (Ref. 7). The extension of the park will be developed similarly to its existing infrastructure. New paths for pedestrians and cyclists will be created using elevated wooden structures (walkways). In total, two new cycle-pedestrian trails will be created – Trilho das Comportas (3.32 kilometres long) and the Trilho dos Salgados (594 metres long) –, and the Trilho do Tejo will be extended by a further 990 metres (Ref. 5).
Recently announced in 2023, the park's newest expansion is set to extend the riverside trails further, creating a continuous route from Lisbon to Alhandra (Ref 5). With future phases planned, the project is expected to significantly increase public interaction with the riverfront and its biodiversity (Ref 5). In this new project phase, the Vila Franca de Xira Municipal Council begins the requalification and environmental and landscape conservation of another section of the riverfront of the Municipality of Vila Franca de Xira, between Alverca and Sobralinho, covering an extension of approximately 4.9 km and an area of approximately 14.1 hectares (Ref. 7). The extension of the park will be developed similarly to its existing infrastructure. New paths for pedestrians and cyclists will be created using elevated wooden structures (walkways). In total, two new cycle-pedestrian trails will be created – Trilho das Comportas (3.32 kilometres long) and the Trilho dos Salgados (594 metres long) –, and the Trilho do Tejo will be extended by a further 990 metres (Ref. 5).
Kungsgärdet urban farm
Kungsgärdet Byaodling is an urban farm set up by local farming association Kungsbacka Tillsammansodling, in Kungsbacka south of Gothenburg. Since 2023, the project has been funded by a 78 000 EUR grant via the non-profit organisation Lokalt ledd utveckling Halland (locally led development) using funds from the EU and the Swedish Board of Agriculture (Jordbruksverket) [Ref. 1, 2, 4]. The goal is to grow food in a sustainable and circular way, building soil health and promoting biodiversity. Using a total area of 4500 m2 on former unused grassland, the urban farm includes: 1100 m2 of effective growing area, 1000 m2 of flowering meadows, fruit and berry trees and bushes, and functional and social areas. The meadows and trees are intended to contribute to biodiversity, while social areas are meant to create a sense of community and benefit the well-being of the people active at the farm [Ref. 1, 3]. The farming association has been around for a few years, but the project funds will allow them to expand and develop the farm over three years, invest in new equipment and arrange free lectures for the public about sustainable farming practices [Ref. 1, 4]. The grant will also allow them to take in more members without anyone having to pay anything, promoting social inclusion.
Sustainable Urban Drainage System in Potsdamer Platz
In an architecturally important area of Berlin, situated between the Landwehr Canal, the Kulturforum (the Berliner Philharmonie and the Berlin State Library) and the new construction on Potsdamer Platz, a combination of green and grey infrastructure has been realised to minimise the burden on Berlin’s existing water infrastructure.
Green and non-green roofs harvest annual rain, which flows through the site’s buildings and is used for toilet flushing, irrigation, and fire systems. The roofs retain and then release water to the large on-site buffer pond, which has five underground storage tanks. Next to the roofs, a series of urban ponds and connecting canals have been implemented, with a combined area of approximately 1.2 hectares. They are filled with rainwater, creating an oasis for urban life. Vegetated biotopes are integrated into the overland landscape and serve to filter and circulate the water that runs along streets and walkways. The lake’s water quality is excellent, forming a natural habitat for animals and cooling the surroundings, while fresh water usage in the buildings has been reduced. (Ref. 1; Ref. 2; Ref. 3; Ref. 6)
The project was implemented in the 1990s as part of the development of Potsdamer Platz in the wake of the reunification of Germany. Several architects collaborated on the implementation that was completely privately funded. Beyond its ecological and technical features, the site is a blue natural site in the heavily built city centre of Berlin and allows people to linger and enjoy natural features. The drainage system won several sustainability prices and is considered a successful integration of nature and technology-based mechanisms to foster climate change adaptation. As the rainwater system stores rainwater in underground tanks and ponds, the urban sewage system is relieved during heavy rain, and water can evaporate. Therefore, the small water circle is closed, and the microclimate is cooled. (Ref. 2; Ref. 6)
Green and non-green roofs harvest annual rain, which flows through the site’s buildings and is used for toilet flushing, irrigation, and fire systems. The roofs retain and then release water to the large on-site buffer pond, which has five underground storage tanks. Next to the roofs, a series of urban ponds and connecting canals have been implemented, with a combined area of approximately 1.2 hectares. They are filled with rainwater, creating an oasis for urban life. Vegetated biotopes are integrated into the overland landscape and serve to filter and circulate the water that runs along streets and walkways. The lake’s water quality is excellent, forming a natural habitat for animals and cooling the surroundings, while fresh water usage in the buildings has been reduced. (Ref. 1; Ref. 2; Ref. 3; Ref. 6)
The project was implemented in the 1990s as part of the development of Potsdamer Platz in the wake of the reunification of Germany. Several architects collaborated on the implementation that was completely privately funded. Beyond its ecological and technical features, the site is a blue natural site in the heavily built city centre of Berlin and allows people to linger and enjoy natural features. The drainage system won several sustainability prices and is considered a successful integration of nature and technology-based mechanisms to foster climate change adaptation. As the rainwater system stores rainwater in underground tanks and ponds, the urban sewage system is relieved during heavy rain, and water can evaporate. Therefore, the small water circle is closed, and the microclimate is cooled. (Ref. 2; Ref. 6)
Real Dos Living Walls and Green Roofs
Located in the Lima district of San Isidro - the heart of commercial activity in Peru - the Real Dos Tower is a prime office building in the Centro Empresarial Real de San Isidro. It was inaugurated in 2018, and it is distributed over 23 levels (14 floors and 9 basements) and enjoys a landscaped green roof (1162 m2) at the crown of the building and numerous outdoor vertical gardens at full height (2365 m2) on the three main fronts (1, 4). This project was a finalist in the 2018 Mipim Awards, considered the ‘Oscars’ of world architecture, and stood out for its architecture and design, due to its attributes of innovation and sustainability (2).
This building has managed to create harmony between design and efficient use of resources. It is characterised by a glass façade with colourful movable shutters and symbolic Peruvian designs (2, 3, 6). It has green walls on the three main fronts, four daylight fronts and a roof garden (2). The architect, Jean Nouvel, worked together with ARVE Peru on the overall landscape plans for the Real Dos tower (1, 3).
This is part of the façade remodelling project of the Camino Real Towers in the Real Business Centre, led by the real estate company Grupo Centenario (1, 2, 3, 4, 5, 6). This overarching Project has sought to develop 4,475 m2 of vertical gardens and roof gardens, which have a technified irrigation system to generate efficiencies in water use, meeting the plants' water requirements in the different seasons of the year. Their implementation helps to filter CO2 and renew the O2 in the office complex.
The ARVE group describes these actions as conducive to creating thermal barriers and sound insulation, a better environment for rest, work and entertainment and increasing property value (7)
This building has managed to create harmony between design and efficient use of resources. It is characterised by a glass façade with colourful movable shutters and symbolic Peruvian designs (2, 3, 6). It has green walls on the three main fronts, four daylight fronts and a roof garden (2). The architect, Jean Nouvel, worked together with ARVE Peru on the overall landscape plans for the Real Dos tower (1, 3).
This is part of the façade remodelling project of the Camino Real Towers in the Real Business Centre, led by the real estate company Grupo Centenario (1, 2, 3, 4, 5, 6). This overarching Project has sought to develop 4,475 m2 of vertical gardens and roof gardens, which have a technified irrigation system to generate efficiencies in water use, meeting the plants' water requirements in the different seasons of the year. Their implementation helps to filter CO2 and renew the O2 in the office complex.
The ARVE group describes these actions as conducive to creating thermal barriers and sound insulation, a better environment for rest, work and entertainment and increasing property value (7)
Restoration of the Rio Mannu-Cixerri
In 2020, the Metropolitan City of Cagliari launched a project to enhance flood resilience and ecological integrity in the Mannu-Cixerri river system in southern Sardinia. The river traverses several communes within the metropolitan area, ultimately feeding into the Santa Gilla Lagoon, a vital wetland ecosystem west of the city.
The project, with a budget of €21 million, focuses on three key communes: Assemini, Decimomannu, and Uta. Rather than solely emphasizing structural flood defenses, the initiative integrates nature-based solutions (NbS) to mitigate flood risks while restoring riverine ecosystems. The Metropolitan City of Cagliari, in collaboration with the Sardinian Regional Public Works Department, is responsible for its implementation.
Key interventions include reinforcing and revegetating embankments, improving water flow along the Rio Mannu, and constructing new levee sections in a manner that enhances natural water retention. Additionally, the project involves upgrading bridges to facilitate better floodwater management. These measures align with the Sardinian Flood Risk Management Plan (PGRA) and aim to reduce flood hazards while promoting ecological benefits.
The project timeline began with a two-year preparation phase for the Preliminary Design Document, followed by a year-long tendering process for construction. These efforts represent a crucial step toward long-term flood resilience and environmental sustainability in the region. (Ref. 1, 2, 3)
The project, with a budget of €21 million, focuses on three key communes: Assemini, Decimomannu, and Uta. Rather than solely emphasizing structural flood defenses, the initiative integrates nature-based solutions (NbS) to mitigate flood risks while restoring riverine ecosystems. The Metropolitan City of Cagliari, in collaboration with the Sardinian Regional Public Works Department, is responsible for its implementation.
Key interventions include reinforcing and revegetating embankments, improving water flow along the Rio Mannu, and constructing new levee sections in a manner that enhances natural water retention. Additionally, the project involves upgrading bridges to facilitate better floodwater management. These measures align with the Sardinian Flood Risk Management Plan (PGRA) and aim to reduce flood hazards while promoting ecological benefits.
The project timeline began with a two-year preparation phase for the Preliminary Design Document, followed by a year-long tendering process for construction. These efforts represent a crucial step toward long-term flood resilience and environmental sustainability in the region. (Ref. 1, 2, 3)
Archipelagos Square
The project to redevelop Archipelagos Square in Cagliari aims to transform this key urban space, which serves as a gateway between the city and its coastal areas, into a more functional and aesthetically pleasing environment. Currently, the area lacks cohesive design, leading to unregulated use and its transformation into an informal parking lot. The redevelopment will address these issues by enhancing the pedestrian experience and reducing vehicular traffic. Improvements in public comfort and safety will include better rainwater drainage, the removal of architectural barriers, and the creation of accessible pathways for all.
This project emphasizes environmental sustainability and the preservation of the local landscape. Key interventions include revitalizing green spaces, safeguarding native vegetation, and removing invasive species. Integrating walking and cycling paths will improve connectivity between the city, Marina Piccola, and Poetto beach, fostering outdoor recreational activities. A designated eco-system filter will recreate the natural dune environment, blending pedestrian areas with the surrounding landscape.
Funded by the Fondo Sviluppo e Coesione (FSC), the project has a total budget of 3 million euros, with construction lasting 10 months starting in October 2023. The redevelopment reflects the broader goals of Cagliari’s administration to promote sustainable urban mobility and improve the public realm, contributing to the city's vision of becoming a hub for nautical sports while enhancing the overall quality of life for residents and visitors (Refs. 1, 2, 3 & 4).
This project emphasizes environmental sustainability and the preservation of the local landscape. Key interventions include revitalizing green spaces, safeguarding native vegetation, and removing invasive species. Integrating walking and cycling paths will improve connectivity between the city, Marina Piccola, and Poetto beach, fostering outdoor recreational activities. A designated eco-system filter will recreate the natural dune environment, blending pedestrian areas with the surrounding landscape.
Funded by the Fondo Sviluppo e Coesione (FSC), the project has a total budget of 3 million euros, with construction lasting 10 months starting in October 2023. The redevelopment reflects the broader goals of Cagliari’s administration to promote sustainable urban mobility and improve the public realm, contributing to the city's vision of becoming a hub for nautical sports while enhancing the overall quality of life for residents and visitors (Refs. 1, 2, 3 & 4).
Metropolitan Lineal Park
The Metropolitan Linear Park is a project initiated by the national government of Bolivia, funded by the Inter-American Development Bank (IDB) (1-8). The proposed park will be located along a disused railway corridor between the cities of La Paz and El Alto, spanning 18.2 km (8, p. 8). The project involves the construction of a linear park, divided into five sections, each with distinct objectives, uses, and designs (8, p. 9). This large-scale initiative aims to improve access to public spaces in La Paz and El Alto, enhance connectivity between the two cities, protect surrounding biodiversity and natural spaces, and strengthen resilience to and mitigate the effects of climate change (3 & 8, pp. 11-12).
To achieve these goals, the project design includes outdoor sports and recreational facilities, pedestrian and cycling circuits, as well as the restoration of parks, squares, and public spaces adjacent to the park corridor (8, p. 9). Some features include balcony corridors, flower and food-producing urban gardens, and viewpoints (5). The project also plans for the re-vegetation of the area with native species and aims to stop the environmental degradation of surrounding natural environments, such as the Pura Pura forest, which has been suffering from ongoing deforestation and waste dumping (8, p. 9). These efforts are expected to increase and support biodiversity in the area (7 & 8, p. 12).
Additionally, the project emphasizes social inclusion, with policies designed to incorporate women, indigenous populations, and persons with disabilities (8, pp. 7-8). The park is intended to raise awareness about climate change and biodiversity, ultimately improving the quality of life and health of nearby residents and the citizens of La Paz and El Alto (8, p. 13).
To achieve these goals, the project design includes outdoor sports and recreational facilities, pedestrian and cycling circuits, as well as the restoration of parks, squares, and public spaces adjacent to the park corridor (8, p. 9). Some features include balcony corridors, flower and food-producing urban gardens, and viewpoints (5). The project also plans for the re-vegetation of the area with native species and aims to stop the environmental degradation of surrounding natural environments, such as the Pura Pura forest, which has been suffering from ongoing deforestation and waste dumping (8, p. 9). These efforts are expected to increase and support biodiversity in the area (7 & 8, p. 12).
Additionally, the project emphasizes social inclusion, with policies designed to incorporate women, indigenous populations, and persons with disabilities (8, pp. 7-8). The park is intended to raise awareness about climate change and biodiversity, ultimately improving the quality of life and health of nearby residents and the citizens of La Paz and El Alto (8, p. 13).
Recovery of Cienaga Juan Polo
The Recovery of Cienaga Juan Polo project is primarily aimed at reopening the natural mouth of the Manzanillos to restore water flow between the sea and the Juan Polo coastal wetland, which has been affected by human activities leading to high salinity and water stagnation issues (ref 2). The project is led by Fundacion Serena del Mar. Environmental and social sustainability are core components of the project design, which has included extensive community consultations since 2013. These consultations have resulted in agreements covering employment opportunities, education, and infrastructure development (ref 2). Key implementation activities include the reforestation of mangroves and targeted interventions to address ecological degradation, such as increased salinity, water stagnation, and biodiversity loss (ref 2). The project also seeks to enhance the quality of life for surrounding communities by restoring traditional economic activities, particularly fishing, and integrating sustainable urban planning elements such as canals, sluices, and navigable waterways. These features are designed to support the development of a "blue corridor" for aquatic mobility within Serena del Mar (ref 2, 3). In addition, it also contributes to local capacity building through environmental education programs that engage community members, researchers, and NGOs in biodiversity monitoring and sustainable practices (ref 1).

