Mapinguari National Park
Mapinguari National Park, located in the Amazon region of Brazil, is a protected area distinguished by its rich biodiversity and vast expanse of untouched tropical rainforest (2). It was officially created on June 5, 2008, by decree, covering an area of 1,776,914.18 hectares (2). The Chico Mendes Institute for Biodiversity Conservation (ICMBio) manages the park. It is linked to a management plan encompassing several nearby conservation units and their areas of influence (2, 3). Its main goal is to preserve the valuable natural ecosystems and scenic landscapes of the Purus-Madeira interfluvial region, which includes savanna enclaves (2, 3). The ecoregion where it is located has a high priority for botanical conservation due to parameters such as species richness and endemism (3). Additionally, the area presents great environmental heterogeneity, with several isolated and unique ecosystems, aspects that have been considered for fostering scientific research and public visitation, with programs for environmental education, recreation in contact with nature, and ecotourism (3). On March 8, 2013, an advisory council for the park was established to involve various stakeholders in decision-making and the effective conservation of the park (2), and in 2018 a Management Master Plan was established, seeking to develop an integrated approach for the protection and proper management of the region, especially considering the socio-environmental impacts of the construction of the BR-319 highway and the deforestation caused by fires, the expansion of soybean cultivation, land appropriation (7) and cattle ranching from the neighbouring state (3, 10). It was established as a Natural Park in 2008, but over the years it has undergone changes in land regulations, adding or decreasing its size as certain mining activities have been allowed in the buffer zone (2)
Nairobi River Basin Programme (NRBP)
Rapid urbanization and a population density of 6,247 people per km² have placed significant stress on Nairobi's natural resources (Ref 1). The 40-km long Nairobi River Basin, originating from the Ondiri Swamp, serves as a vital water source for the city (Ref 1, 2). However, it has suffered severe pollution from untreated sewage, solid waste, industrial contaminants, plastics, and agricultural runoff (Ref 1, 3). This degradation has had a serious impact on the ecosystem, local residents, and biodiversity (Ref 3).
To address these issues, the Nairobi River Basin Programme (NRBP), sponsored by UNEP, was launched in 1999 (Ref 4). Since then, government and non-state actors have worked together on solid waste management, riparian restoration, and wastewater control (Ref 1). The program was implemented in two phases: Phase I (2003–2006) and Phase II (2006–2009), involving stakeholders from the government, private sector, and civil society (Ref 1, 4, 5). Despite these efforts, a study from 2017 found significant tree removal along the river, and between 1988 and 2014, encroachment into the 30-meter riparian buffer zone dramatically increased, particularly between 2010 and 2014, further degrading the river’s health (Ref 1).
To address these issues, the Nairobi River Basin Programme (NRBP), sponsored by UNEP, was launched in 1999 (Ref 4). Since then, government and non-state actors have worked together on solid waste management, riparian restoration, and wastewater control (Ref 1). The program was implemented in two phases: Phase I (2003–2006) and Phase II (2006–2009), involving stakeholders from the government, private sector, and civil society (Ref 1, 4, 5). Despite these efforts, a study from 2017 found significant tree removal along the river, and between 1988 and 2014, encroachment into the 30-meter riparian buffer zone dramatically increased, particularly between 2010 and 2014, further degrading the river’s health (Ref 1).
Dog river watershed management plan
The Dog River Watershed Restoration project aims to protect and enhance the chemical, biological, and cultural integrity of the Dog River Watershed in Mobile County, Alabama (Ref 1). Guided by the Dog River Watershed Management Plan (WMP), the project addresses key issues such as pollution, litter, stormwater management, and habitat degradation (Ref 2). Funded by the National Fish and Wildlife Foundation's Gulf Environmental Benefit Fund and completed in partnership with stakeholders, the project focuses on implementing targeted restoration activities to improve water quality, protect critical habitats, and increase public awareness and access to the watershed (Ref 2). The Dog River Watershed faces significant hazards, including pollution, sedimentation, erosion, and the impacts of urban development (Ref 3). These challenges are intensified by the watershed’s role as an urban estuary, where land use heavily influences water quality and habitat conditions (Ref 3). To mitigate these threats, the project incorporates pollution prevention measures, shoreline restoration efforts, and community engagement initiatives (Ref 4). By prioritizing scientifically supported actions and aligning with broader environmental goals, the project seeks to restore ecological balance and ensure the long-term health and resilience of the watershed and its connected ecosystems in Mobile Bay (Ref 4).
The Watershed Management Plan for the Dog River Watershed is a key component of the Mobile Bay Shore Habitat Conservation and Acquisition Initiative, which focuses on acquiring, restoring, and preserving habitats and wildlife species affected by the environmental disasters of the Deepwater Horizon oil spill that occurred in 2010 (Ref 6). The project spans three critical areas: 300 acres in the Dog River Watershed (as detailed in this project profile), 450 acres within the Three Mile Creek Watershed, and 40 acres in the Garrows Bend Watershed (not in focus here) (Ref 7).
The Watershed Management Plan for the Dog River Watershed is a key component of the Mobile Bay Shore Habitat Conservation and Acquisition Initiative, which focuses on acquiring, restoring, and preserving habitats and wildlife species affected by the environmental disasters of the Deepwater Horizon oil spill that occurred in 2010 (Ref 6). The project spans three critical areas: 300 acres in the Dog River Watershed (as detailed in this project profile), 450 acres within the Three Mile Creek Watershed, and 40 acres in the Garrows Bend Watershed (not in focus here) (Ref 7).
D'Olive Watershed Restoration
The D'Olive Creek Restoration project is designed to address the significant environmental challenges facing the D’Olive Creek Watershed and its tributaries (Tiawasee and Joe’s Branch), primarily caused by increased urbanization. Over the last several decades, the area has experienced severe erosion, sedimentation, and habitat degradation due to stormwater runoff from new residential and commercial developments. This runoff has led to stream channel instability, loss of wetlands, and impaired water quality in both D'Olive Creek and Mobile Bay, threatening aquatic and wildlife habitats (Ref 2).
The project involves restoring degraded streams and implementing management measures to reduce the downstream impacts within the watershed. Key activities include stormwater retrofits, stream restorations, and continuous monitoring. These efforts aim to stabilize stream segments and significantly reduce sediment loading into the northeast quadrant of Mobile Bay. This is crucial for improving water quality and clarity, which is necessary for re-establishing submerged aquatic vegetation (SAV) beds that serve as critical nursery areas for shellfish and finfish (Ref 1). By using natural materials like rock and living plants, the project also seeks to create a sustainable and ecologically balanced watershed system (Ref 3).
The anticipated outcomes include enhanced water quality in D'Olive Creek and Mobile Bay, reduced erosion and sedimentation, and the restoration of vital habitats, which will contribute to the region's overall ecological health (Ref 1, 3). This restoration project is part of a broader strategy outlined in the 2002 Comprehensive Conservation Management Plan for the Mobile Bay Estuary (Ref 1).
The project involves restoring degraded streams and implementing management measures to reduce the downstream impacts within the watershed. Key activities include stormwater retrofits, stream restorations, and continuous monitoring. These efforts aim to stabilize stream segments and significantly reduce sediment loading into the northeast quadrant of Mobile Bay. This is crucial for improving water quality and clarity, which is necessary for re-establishing submerged aquatic vegetation (SAV) beds that serve as critical nursery areas for shellfish and finfish (Ref 1). By using natural materials like rock and living plants, the project also seeks to create a sustainable and ecologically balanced watershed system (Ref 3).
The anticipated outcomes include enhanced water quality in D'Olive Creek and Mobile Bay, reduced erosion and sedimentation, and the restoration of vital habitats, which will contribute to the region's overall ecological health (Ref 1, 3). This restoration project is part of a broader strategy outlined in the 2002 Comprehensive Conservation Management Plan for the Mobile Bay Estuary (Ref 1).
Upper Detroit Riverfront Parks Habitat Restoration
The Upper Detroit Riverfront Habitat and Parks Restoration Project aims to restore and enhance vital fish and wildlife habitats along the Detroit River. This initiative seeks to rehabilitate approximately 30 acres of upland and shoreline habitats within Riverfront-Lakewood East Park, A.B. Ford Park, and Mariners Park (all located alongside the river), covering nearly one mile of the Detroit River and its shorelines.
Key outcomes include improving approximately 1,000 linear feet of existing shoreline along the Detroit River by incorporating native wetland edges and fish spawning shelves into the restoration efforts. The project also plans to enhance around 2,000 linear feet of canal shoreline and 800 linear feet along Fox Creek to create or improve habitats for fish and herpetological species. In Riverfront-Lakewood East Park, 28 acres are targeted for the establishment or enhancement of native vegetation to support birds, mammals, and pollinators. If feasible, the creation of about 7 acres of wetlands, along with shallow and deep-water habitats, is also part of the vision.
The project is guided by the City of Detroit's 2017 Parks and Recreation Improvement Plan and represents part of a broader strategy to revitalize the city’s green spaces after years of underfunding. With renewed commitment, the city has allocated nearly $12 million to enhance neighborhood parks, particularly in areas that have lacked investment over the past decade.
However, the project was temporarily halted in 2020 due to high water levels causing flooding in the adjacent neighborhood. As of 2024, it remains on hold while the City of Detroit conducts a flood mitigation study. Despite this delay, the project remains a critical step toward fostering community stewardship and creating sustainable green spaces that improve the quality of life for all Detroit residents.
(Ref. 1, 4, 5)
Key outcomes include improving approximately 1,000 linear feet of existing shoreline along the Detroit River by incorporating native wetland edges and fish spawning shelves into the restoration efforts. The project also plans to enhance around 2,000 linear feet of canal shoreline and 800 linear feet along Fox Creek to create or improve habitats for fish and herpetological species. In Riverfront-Lakewood East Park, 28 acres are targeted for the establishment or enhancement of native vegetation to support birds, mammals, and pollinators. If feasible, the creation of about 7 acres of wetlands, along with shallow and deep-water habitats, is also part of the vision.
The project is guided by the City of Detroit's 2017 Parks and Recreation Improvement Plan and represents part of a broader strategy to revitalize the city’s green spaces after years of underfunding. With renewed commitment, the city has allocated nearly $12 million to enhance neighborhood parks, particularly in areas that have lacked investment over the past decade.
However, the project was temporarily halted in 2020 due to high water levels causing flooding in the adjacent neighborhood. As of 2024, it remains on hold while the City of Detroit conducts a flood mitigation study. Despite this delay, the project remains a critical step toward fostering community stewardship and creating sustainable green spaces that improve the quality of life for all Detroit residents.
(Ref. 1, 4, 5)

