Redevelopment of the Marechal Humberto Delgado Square
The renovation of the "Marechal Humberto Delgado" Square focused on transforming the area into a more pedestrian-friendly and sustainable urban space. The project included reorganising the traffic system, creating a new urban green square, requalifying the bus terminal, enhancing the integration of different transport modes and improving pedestrian access (Ref 1). Key features of the intervention were the introduction of cycle paths, wider sidewalks, green spaces with 200 new trees, and recreational facilities such as a children's playground and water features (Ref 2). The project also addressed critical infrastructural needs, including constructing a rainwater collector as part of Lisbon's General Drainage Plan to mitigate the city's frequent flooding issues (Ref 3). The renovation, completed in 2024, was part of the 'A Square in Every Neighborhood' program, emphasizing community involvement and sustainable urban development (Ref 3).
Griffeen Valley Park Wetlands
The Dublin Urban Rivers LIFE (DURL) project incorporates two interconnected wetlands in Griffeen Park as part of its broader initiative to improve water quality, natural water management and aquatic biodiversity in urban areas. These wetlands were specifically designed as a natural sewage system to treat wastewater from the surrounding areas, addressing a significant environmental issue known as "domestic misconnection." Domestic misconnection occurs when household appliances, such as washing machines, dishwashers, and kitchen sinks, are incorrectly linked to surface water drains rather than the sewage system. This leads to untreated wastewater being directly discharged into local waterways, contributing to contamination.
In the River Griffeen catchment, which includes approximately 12,000 dwellings and associated infrastructure, domestic misconnections are a considerable threat to water quality. The DURL project focuses on identifying and rectifying these misconnected appliances to ensure that wastewater is properly treated before entering the river. This process will not only improve water quality but will also provide flood alleviation and support healthier aquatic ecosystems in the area.
The project is aligned with broader environmental policies, including the River Basin Management Plan 2022-2027, the Water Framework Directive, the Climate Change Action Plan, the Floods Directive, and the draft Biodiversity Plan. One of the key strategies is to use a Geographic Information System (GIS) to streamline inspections for domestic misconnections, making the process faster and more cost-effective.
The constructed wetlands in Griffeen Park, with a standing water depth of approximately 30 cm, are planted with a variety of native Irish species. These wetlands offer a natural, sustainable solution to wastewater treatment, with the potential for similar applications across Europe. (Ref. 2, 4)
In the River Griffeen catchment, which includes approximately 12,000 dwellings and associated infrastructure, domestic misconnections are a considerable threat to water quality. The DURL project focuses on identifying and rectifying these misconnected appliances to ensure that wastewater is properly treated before entering the river. This process will not only improve water quality but will also provide flood alleviation and support healthier aquatic ecosystems in the area.
The project is aligned with broader environmental policies, including the River Basin Management Plan 2022-2027, the Water Framework Directive, the Climate Change Action Plan, the Floods Directive, and the draft Biodiversity Plan. One of the key strategies is to use a Geographic Information System (GIS) to streamline inspections for domestic misconnections, making the process faster and more cost-effective.
The constructed wetlands in Griffeen Park, with a standing water depth of approximately 30 cm, are planted with a variety of native Irish species. These wetlands offer a natural, sustainable solution to wastewater treatment, with the potential for similar applications across Europe. (Ref. 2, 4)
Recovery project for La Cienaga de la Virgen
The Ciénaga de la Virgen is a coastal wetland (cienaga) located on the north side of the border of the city of Cartagena, separated from the sea by La Boquilla's sandy beach. It has a maximum width of 4.5 km, a length of approximately 7 km, a water body area of about 22.5 km², and depths of up to 1.6 m. It is connected to the city's canal system (ref 1). The recovery project of la Cienaga de la Virgen, led by EPA Cartagena, is proposed as a strategy to address the issues affecting the water body, local communities, the economic activities that depend on it, and the ecosystems that regulate the water cycle and provide multiple services, many of them essential, with an integrated and global management approach based on the basin as the unit for planning and resource management (ref 14). Some of the main problems of the wetland are related to illegal settlements on its shore, as well as illicit dumping of waste, pollution by wastewater from the illegal settlements and deforestation of mangroves (ref 4). Key activities include stopping illegal occupation by relocating established families, improving roads, promoting reforestation, encouraging social participation, managing wastewater, and enhancing tidal systems (ref. 1 and 15).
Alonside the EPA, other stakeholders involved include the regional authority "Regional Autonomous Corporation of the Canal del Dique" (Cardique), with jurisdiction in the rural area, and Cartagena Mayor's Office, and the local community, involved in all the stages of the plan thanks to the “mesas de governance” or "governance tables", discussion spaces where different actors participate in the decision-making (ref 2).
Alonside the EPA, other stakeholders involved include the regional authority "Regional Autonomous Corporation of the Canal del Dique" (Cardique), with jurisdiction in the rural area, and Cartagena Mayor's Office, and the local community, involved in all the stages of the plan thanks to the “mesas de governance” or "governance tables", discussion spaces where different actors participate in the decision-making (ref 2).
Three Mile Creek Greenway Trail
The Three Mile Creek Greenway Trail project aims to transform the existing creek into a valuable community asset by developing a multi-use greenway trail (Ref 1). This greenway will connect various parts of the city through walking and biking paths, linking neighbourhoods, parks, and commercial districts while providing access to unique natural areas (Ref 2). The creek having been adandonned for decades (Ref 5), the initiative seeks to turn 3 Mile Creek (3MC) into a vibrant natural corridor that fosters recreation, education, and economic activities (Ref 1, Ref 2). The project aims also at reducing pollutants in the waterway, restoring natural stream channels, and maintaining flood protection (Ref 1).
The 3MC Greenway Trail is expected to become a key feature of Mobile's urban landscape, offering numerous benefits. These include enhancing community health, both mental and physical (Ref 2), and stimulating the local economy by increasing property values, tax revenues, and opportunities for recreation-related businesses and job development (Ref 2). Additionally, the trail will improve community connectivity by linking neighbourhoods, parks, and schools, thereby fostering a stronger sense of community and better access to public spaces (Ref 2). Lastly, the project will contribute to environmental restoration through stormwater management, pollution reduction, and natural habitat preservation (Ref 2).
The greenway is part of a plan to restore the health of the Three Mile Creek watershed and is the first major piece of a long-term Mobile Greenway Initiative (MGI) (Ref 4).
The 3MC Greenway Trail is expected to become a key feature of Mobile's urban landscape, offering numerous benefits. These include enhancing community health, both mental and physical (Ref 2), and stimulating the local economy by increasing property values, tax revenues, and opportunities for recreation-related businesses and job development (Ref 2). Additionally, the trail will improve community connectivity by linking neighbourhoods, parks, and schools, thereby fostering a stronger sense of community and better access to public spaces (Ref 2). Lastly, the project will contribute to environmental restoration through stormwater management, pollution reduction, and natural habitat preservation (Ref 2).
The greenway is part of a plan to restore the health of the Three Mile Creek watershed and is the first major piece of a long-term Mobile Greenway Initiative (MGI) (Ref 4).
NatureRx Rain Garden Pilot
The NatureRx Rain Garden Pilot is a community-driven initiative aimed at addressing urban runoff and its associated challenges, implemented by Bí URBAN, a community hub and social enterprise in Dublin focused on urban regeneration. The pilot project developed in Stoneybatter, Dublin involves diverting rainwater from residential rooftops into specially designed rain gardens (1). The area is used as the first trial area by installing around 100 rain gardens (3, 11). Built to fit neatly into available spaces, these self-sustaining planters will filter rainwater through the garden, with overflow pipes in place to prevent flooding during heavy downpours (1).
It is expected that these gardens will transform sterile urban spaces into green areas, enhancing biodiversity, providing habitats for pollinators, and acting as carbon sinks (1,3).
It is expected that these gardens will transform sterile urban spaces into green areas, enhancing biodiversity, providing habitats for pollinators, and acting as carbon sinks (1,3).
Nong Peung Wetland Rehabilitation
The frequent and severe floods that many cities in Lao PDR have been experiencing are causing a significant impact on the livelihood of local and vulnerable communities. To address the issues of flood and climate events, the Green Climate Fund has provided funding for the Lao DPR government to initiate the 'Build Resilience of Urban Populations with Ecosystem-Based Solutions in Lao DPR' project. The Ministry of Natural Resource and Environment of Lao, in collaboration with other related departments, universities, and provincial governments, is leading this project. The funding was approved in 2019, and the project is set to conclude by 2025. The project consists of four sub-projects, which will be implemented in four cities, including Paksan, Vientiane, Savannakhet, and Pakse. One of the sub-projects involves rehabilitating the Nong Peung wetland in Paksan city, which currently has no management plan and is negatively impacted by human activities and has been degraded in certain aspects. Natural vegetation has been lost in parts of the wetland, invasive alien plants are encroaching, and the natural water flow has been disrupted in places. The objective of this project is to develop a comprehensive management plan for Nong Peung wetland and implement various nature-based solutions to improve the ecosystem. This will involve removing invasive alien plant species, eliminating human-made barriers that obstruct natural flow, and planting appropriate native species. Currently, the project is in the planning stage with relevant stakeholders to determine the physical implementation site. (Ref.1,2,3)
City of 1,000 Tanks
The ‘City of 1,000 Tanks’ project offers a holistic solution to the problems of floods, water scarcity and pollution in Chennai (Ref. 1). The project's primary objective is to develop a "Water Balance Model" for the city, which involves collecting rainwater, treating wastewater and runoff pollution with decentralized nature-based solutions, as well as prevent climate-change-induced droughts and saline intrusion due to sea-level rise (Ref. 1, 2). This is achieved through developing various nature-based water management solutions and improving the recharge capacity of traditional temple tanks (Ref 1).
The project began in 2018, following the call for action event of the "Water as Leverage for Resilient Cities Asia" (a bilateral program spanning several Asian countries). The Water Balance Model is developed as a strategy with an incremental implementation process (Ref 1, 2). The project started with pilot projects and then progressed to flagship projects before full city-wide implementation (Ref. 3).
The project began in 2018, following the call for action event of the "Water as Leverage for Resilient Cities Asia" (a bilateral program spanning several Asian countries). The Water Balance Model is developed as a strategy with an incremental implementation process (Ref 1, 2). The project started with pilot projects and then progressed to flagship projects before full city-wide implementation (Ref. 3).
Rajokri Lake Rejuvenation Project
The Rajakori lake rejuvenation project aimed at reviving an existing lake using a natural and sustainable treatment system, the "Scientific Wetland with Active Biodigester (SWAB)". SWAB technology uses a two-step process involving (i) a sedimentation tank equipped with a biodigester and (ii) a constructed wetland system. The untreated sewage waste is passed through this two-step process that uses microbes and plants to reduce pollutant levels. The project also involved redeveloping the public space around the lake for community use (Ref 1,2). Before 2017, the lake was overfilled with sewage and waste from nearby neighbourhoods due to a lack of proper sewage management. Initiated by the Delhi Government, the project aimed at using low-cost natural methods rather than conventional techniques involving concretized bases and chemicals to treat water (Ref 1, 4). Due to its success and cost-effectiveness, this project now serves as an excellent example for other projects within Delhi (Ref 5).
Vinh River Rehabilitation Project
Vinh is the biggest city in north-central Vietnam and is the hub for economic and cultural development in the region. As of 2018, the city has a population of approx. 500,000 inhabitants and is located on the Ca River delta, 160 miles (260 km) south of Hanoi. Flooding and poor environmental sanitation are major impediments to the development of Vinh City. The drainage system of the city is comprised of four catchment basins connected to Rao Dung, Ke Gai, Vinh and Lam Rivers. Among the four, the Vinh River is flowing through the central wards and communes of Vinh City and is one that becomes sensitive to severe flooding events frequently (2,3).
Recently (in 2021), with support from the World Bank, the government initiated a program, the Vinh City Priority Infrastructure and Urban Resilience Development Project (VPIUR), which is expected to bring a new look to the river, reduce the risk of flooding in urban areas and strengthen urban management capacity to adapt to climate change. This project has several sub components and one of them is a river rehabilitation and upgrade under the form of riverbank green, sanitation, and flood risk management (1, 3).
The implementation includes a comprehensive set of structural and non-structural interventions, including flood control systems and nature-based solutions, wastewater collection and treatment infrastructure, and key transport links. The project aims to transform it into green public spaces which are to be constructed under the project. The project also aims to invest in developing green public spaces along the Vinh riverbank and a new regulation lake. (3)
Recently (in 2021), with support from the World Bank, the government initiated a program, the Vinh City Priority Infrastructure and Urban Resilience Development Project (VPIUR), which is expected to bring a new look to the river, reduce the risk of flooding in urban areas and strengthen urban management capacity to adapt to climate change. This project has several sub components and one of them is a river rehabilitation and upgrade under the form of riverbank green, sanitation, and flood risk management (1, 3).
The implementation includes a comprehensive set of structural and non-structural interventions, including flood control systems and nature-based solutions, wastewater collection and treatment infrastructure, and key transport links. The project aims to transform it into green public spaces which are to be constructed under the project. The project also aims to invest in developing green public spaces along the Vinh riverbank and a new regulation lake. (3)
Engineering with nature in the Upper Kinta River Basin
The Upper Kinta River Basin covers an area of about 31,470 hectares above Ipoh City, and it is the main water catchment resource for the residents of the city and its surrounding areas. The Kinta river basin is now threatened by land erosion, land development, improper sewage treatment and irresponsible waste discharges (Ref 1). In 2021, a pilot project was implemented near the city of Ipoh along the SimpangPulai Highway and experimented with river bio-engineering techniques to reduce soil erosion and subsequently prevent sedimentation downstream (Ref 3). The pilot site was established as part of the Mainstreaming Biodiversity Conservation into River Management project, which focused on applying nature-based solutions for mainstreaming biodiversity into riverine landscape planning and watershed management in Malaysia. To provide seedlings for the bio-engineering project and also other related initiatives, a nursery was established in the indigenous Pawong Orang Asli Village. The nursery also provided additional income for communities (Ref 4). The pilot was developed with the expectation to be upscaled and replicated in other parts of the UKB, especially along the SimpangPulai Highway. (Ref. 6)

