Experimental Garden at The Cartonnerie
"Pending the creation of housing and new walks by 2020, the association Carton Plein and the EPA (Public Building Institution) of Saint-Etienne have created a temporary public space on the site known as "la Cartonnerie". A place for exchange and conviviality, the site hosts artistic installations, ephemeral installations and events. It is a laboratory conducive to imagining new ways of doing the city" (Ref. 1). The citizens also created shared gardens in this area called "Le Jardin Experimental"(Experimental garden) (Ref. 4).
Montreynaud Park in the new district urban planning
The Montreynaud Park is composed of a great diversity of spaces (dense woodlands, undergrowth, meadow spaces, small group of trees ) and presents a richness of fauna and flora. The challenge of rebuilding this area is to create a real urban park, a green lung that provides the junction between the upper and lower parts of the neighborhood and links it to the rest of the city. The redevelopment of the park must meet the needs of the inhabitants by developing a place of contemplation, pedestrian paths, sports and recreational paths, and in connection with scientific, technical and industrial culture (Ref.1).
Riverbanks restoration of Janon River
This intervention is about the restoration of the riverbanks of the Janon River along a street in the Terrenoire District of Saint Etienne. This area was abandoned for more than 10 years, without maintenance and cleaning. Therefore, this intervention was mandatory for clean up to avoid flood as well as bringing back vegetation and offering some quality walking areas for citizens (Ref. 1).
MOL: sustainable infrastructure
The petrol station is a result of a long-term project of MOL, called as the “The petrol station of the future”. The designers created a building with excellent thermal insulation, green walls, a green roof, solar panels, rainwater utilization and an alternative heating system. Even the interior of the building was created with as much environmentally friendly materials as possible. The building uses LED lighting only to save energy. These environmental efforts resulted in Energy savings of more than 50 percent, and the neutralization of 10 tons of CO2 gas emissions. (Reference 1)
Blackburn Meadows Wastewater Treatment Plant Upgrade
Blackburn Meadows Wastewater Treatment Plant (WWTP) has a mesophilic anaerobic digestion facility, which enables the recycled sludge to be used on neighbouring farmlands as manure. It also enables the generation of renewable energy using combined heat and power units. All the upgrade works were to improve the quality of effluent being discharged into the River Don (ref 3). Sheffield City Council and Yorkshire Water leased an unused part of the former sewage works, to turn into a nature reserve which provides habitat for migrating birds. A water meadow created on vacant land promotes ecological biodiversity and floodwater attenuation (Ref5). In 2013, the works handle a dry weather flow of more than 158,000 cu m of sewage per day, with the treated effluent pumped into the river. It is one of Yorkshire Water’s biggest assets, but with a projected dry weather flow set to hit 368,000 cu m per day by 2025, it is in need of an upgrade (ref 6). The project is fragmented into two phases as the 1st phase was completed in 2013 and the 2nd phase will be completed by 2021 (ref 3).
Sheffield University Green Roofs
The University of Sheffield has embraced green roof technology for its benefits to the built environment, and to support Sheffield City Council vision of Sheffield as the UK’s green roof capital. Most buildings the University feature intentionally vegetated green roofs and some existing buildings with suitable structures have been retrofitted with green roofs (ref 1). The first instrumented test plot for the green roof was installed on the Mappin Building roof. In 2009, Jessop West building and the Robert Hadfield – Green Roof Centre Demonstration Site are studied for replicating the model (ref 4).
Bispetorvet
The City Council transformed Bispetorve, from a public square, to a green urban space in the autumn of 2015 - available for a wide range of events and experiences - designed to attract life and activity. Bispetorvet was aimed to also play an important role as an attractive crossroads between Strøget, Store Torv, the new harbour area, light railway stop at Skolebakken and the harbour front car parks.” (Ref. 1)
SPARK project
The areas around MarselisborgCenter in Aarhus get a new and better life. The project will contribute to the world's first city park that handles excess rainwater and invites citizens to health-promoting lifestyles. The area around MarselisborgCenter will be converted into a public city park for both MarselisborgCenter's users (people in rehabilitation) and the citizens of Aarhus in general. At the same time, the area will make the city more robust to future heavy rainfall. (Ref. 1)
The purpose of SPARK is to create a new, vibrant urban space in and around the Marselisborg Center, which partly meets the need for outdoor rehabilitation activities for the center's users, and partly the need for a fully-fledged climate adaptation effort in the area. These needs are united by the construction of a new public park, which also has the potential to increase social inclusion by creating meetings between the users of the Marselisborg Center and the many residents in the district. (Ref. 6)
The purpose of SPARK is to create a new, vibrant urban space in and around the Marselisborg Center, which partly meets the need for outdoor rehabilitation activities for the center's users, and partly the need for a fully-fledged climate adaptation effort in the area. These needs are united by the construction of a new public park, which also has the potential to increase social inclusion by creating meetings between the users of the Marselisborg Center and the many residents in the district. (Ref. 6)
Natural Swimming Pool Brackwede
The Brackwede open-air pools have been a significant landmark of the city of Bielefeld and part of locals' life since 1926. After several renovations since its opening, in 2005, the maintaining company of the Brackwede open-air pools proposed to convert the pools into natural-water bodies through the application of natural water filtration systems. The pools are supplied from the natural underground stream of Ems-Lutter whose spring water is physically and biologically purified by natural mineral soil filter and water plants. Chlorine is prohibited in this pool - the nature itself ensures water quality (1). Since 2009, the Natural pool of Brackwede offers natural facilities for swimming and other water-related activities besides cultural, sport and recreational opportunities for all (1).
Joining two parks with a green mass corridor
"The main idea of the project is to join the two parks at the end of the intervention (Pedion Areos and Lofos Likavitou) with a green mass that will flow all along the intervention, bringing back the greenery to an area that used to be a green zone in the outside of the old Athens walls.That green corridor is formed by: (1) the existing trees preserved; (2) the new trees added; (3) a continuous floor all along the project with a pattern that is an abstraction from olive tree branches; (4) The artificial activity/bioclimatic trees they create" (Ref 1).

