Aarhus River Project
The project was about restoration of the Aarhus river. The river was piped during the 1930s for hygienic reasons and to give space for road infrastructure. In 1989, the city decided to resurface the river. The river acts as a green and blue corridor running through the city centre. Furthermore, The City Council approved a plan for the recreational vision of the Aarhus River and e.g. flood prevention measures have been taken. (Ref. 1, 2, 3) The Aarhus Å project was completed in the years from 2006 to 2013. (Ref. 15)
Rene Dumont Park
Opened in 2019, the René-Dumont Park which runs adjacent to a railway is "a centerpiece of the urban composition of the Nouveau Saint-Roch neighborhood" in Montpellier. (Ref. 1 and 2). This north/south 1.2-1.3 ha vegetation corridor represents a major of the city's urban renewal plan and "allows a great articulation among existing habitats, infrastructures and a contemporary neighborhood" (Ref. 2). The large area is considered to be exceptional for dense urban centres (Ref. 2). "The Nouveau Saint-Roch district is an example of a social, generational and functional diversity" (Ref. 2).
The Butterfly Park
The Street Office (Gatukontoret) and VA Syd rebuilt Fjärilsparken (The butterfly park) in Bunkeflostrand (Malmö). For the shallow stream that runs through the park the slopes of the dikes have been made flat, meadow vegetation and wetland-plants planted in the wetlands. An area east of the park was built with houses and stormwater was managed in new ways (ref. 1). Opening the park up to the sea, flower beds were planted for richer plant and wildlife, butterfly-attracting plants were planted, lighting for safety was installed and areas with benches and bridges were created (ref. 1).
The Anfield Project
The Anfield Regeneration project was founded in 2013 with the aim to improve the area and its neglected housing stocks. It was set up by the Liverpool council and the Liverpool Foot Club, along with developers Your Housing Group and Keepmoat. The activities include the development of new and refurbished housing, the development of a new public square including commercial and retail premises, a revitalised high street and the expansion of Anfield Stadium (Reference 6) . It also includes the creation of public spaces and selective garden extensions in the area following the demolition of a number of derelict homes (Reference 1).
The partnership has stated that more than 600 new homes have been built, with 600 existing properties refurbished. The project aims to create 1000 new homes and is scheduled to be completed in 2020 (Reference 6, 8).
The partnership has stated that more than 600 new homes have been built, with 600 existing properties refurbished. The project aims to create 1000 new homes and is scheduled to be completed in 2020 (Reference 6, 8).
Green roof at the Museum of the Human Body
In 2013, architecture firm BIG's design was chosen for a proposed Museum of the Human Body in Montpellier (Ref. 1). The plan was "An ambitious scenographic project resulting from a simple and clear spatial design. The alliance of its architectural, environmental, and functional qualities". "The gentle slopes of its roofs transform into a landscape intertwining vegetable and mineral terraces that provide direct access to pedestrians on the urban sidewalk and the park" (Ref. 2). It would have involved a "park of eight hectares" (Ref. 12, page 4). The project has not yet become a reality (as of August 2, 2020).
Greener Sofielund
Sofielund invests in a sustainable area. Carpool/joint recycling centre were some of the proposals discussed when property owners, Malmö city and some experts discussed how Sofielund could become more sustainable in the future. The idea is that the environmental days in Malmö (e.g. a workshop) will lead to an action plan to make Sofielund greener. Property owners Sofielund has been at the forefront of a local sustainability work that can be a model for the rest of the country. In February 2017, a memorandum of understanding was signed about concrete efforts to strengthen the Sofielund area (Ref. 1, 2). There is a strong political support for the work that is being done in Sofielund and the BID concept is now upscaled to a sixth project area called Case Sofielund. (Ref. 6).
Modernization of the Brodowski Pond
Revitalization of the Brodowski Pond and its surroundings that include: revitalization of the pond itself, modernization of the viewpoints, building alleys, new lighting system, senior corner, playground, gym, greenery, recreational areas and a dog run. The justification for the project emphasizes revitalization of the area, improving its functionality and usefulness as well as aesthetics while preserving the terrain and raising the importance of the pond as a public space of a city of particular aesthetic values. (1)(2)
Agora Budapest: the new citycenter
Agora Budapest is a large scale urban redevelopment project initiated by private investors. Besides implementing five high-quality office buildings, the investors aim at creating green public spaces the size of 7000 square metres in order to provide a healthy and vivid working environment. The green surface involves green roofs, parks and tree lines, all which will be irrigated using collected rainwater. The solar panels on the roofs of the buildings are also part of the sustainability plans of the investors. (Ref 1. and Ref 4.)
The Sprouting Building
The Sprouting Building is an apartment complex which was built in 2000 in such a way as to have seeds grow from the exterior walls of the building. "There are "balcony-gardens" to dine in with many friends, "balcony-cabins" perched among the trees for more intimate encounters, "balcony-lookouts" to curiously explore the foliage of the treetops, and "balcony-terraces" for reflection and contemplation. The project could have been called “the balcony in all its forms" but instead it was named "the building that grows." The building "grows" thanks to plants on the building's walls. Its skin has become a kind of mini-ecosystem" (Ref. 1).
Regenerating Liverpool - Festival Park
The Festival Park Liverpool project involves the transformation of the former International Garden Festival site into an internationally recognized riverside suburb with strong neighbourhood connections and leisure facilities. The 36-hectare site is split into three different zones namely 1) Development Zone 2)Southern Grasslands and 3) Festival Gardens. The project masterplan was created by K2 Architects and was launched by the Liverpool City Mayor Joe Anderson. (Reference 1, 4, 7).
The Festival Park Liverpool masterplan consists of 1) a mixed-use housing including residential zone, primary school, medical centre and a culture hub 2) social heart of the residential area with hotels, bars and restaurants 3) a beachfront neighbourhood with residential apartments, pavement cafes, restaurants and bars, designed around an ‘Amsterdam’ styled canal frontage 4) festival gardens 5) grasslands to be remodelled into a natural habitat for wildlife and leisure activities (Reference 1).
In 2017, a set of land surveys and environmental assessments, along with the first phase of site mediation, were carried out. A consent to develop 1380 residential units were provided with validity until December 2022 (Reference 1). Detailed site investigations have been undertaken in the Development Zone and now underway on the Gardens and Southern Grasslands (Reference1, 8). A 9.9M pound remediation programmed funded by a grant from Homes England will begin in Spring 2020 in order to prepare the site to deliver 1,500 homes with supporting retail leisure and community uses. Liverpool City Council has started to engage prospective investors, developers and operators in discussions for bringing forward the project. It has opened opportunities for investor involvement which includes equity partners, co-investment or development funding, offering a potential for a long-term relationship with a public sector partner or investor. The project will be built in several phases commencing in Summer 2021 (Reference 9).
The Festival Park Liverpool masterplan consists of 1) a mixed-use housing including residential zone, primary school, medical centre and a culture hub 2) social heart of the residential area with hotels, bars and restaurants 3) a beachfront neighbourhood with residential apartments, pavement cafes, restaurants and bars, designed around an ‘Amsterdam’ styled canal frontage 4) festival gardens 5) grasslands to be remodelled into a natural habitat for wildlife and leisure activities (Reference 1).
In 2017, a set of land surveys and environmental assessments, along with the first phase of site mediation, were carried out. A consent to develop 1380 residential units were provided with validity until December 2022 (Reference 1). Detailed site investigations have been undertaken in the Development Zone and now underway on the Gardens and Southern Grasslands (Reference1, 8). A 9.9M pound remediation programmed funded by a grant from Homes England will begin in Spring 2020 in order to prepare the site to deliver 1,500 homes with supporting retail leisure and community uses. Liverpool City Council has started to engage prospective investors, developers and operators in discussions for bringing forward the project. It has opened opportunities for investor involvement which includes equity partners, co-investment or development funding, offering a potential for a long-term relationship with a public sector partner or investor. The project will be built in several phases commencing in Summer 2021 (Reference 9).

