Climate adaptation in Risvangen
“Cooperation between, residents, businesses and the local authority to facilitate the adaptation of a large urban area in Aarhus for more rainfall in the future. They will be able to influence urban development in the direction of more attractive use of rainwater. Local Rainwater Drainage (LRD) is a current trend derived from the political desire to deal with some of the expected increase in extreme rainfall by collecting and using it for recreational purposes. Society will thus be able to adapt to climate change better whilst providing more recreational facilities and environmental improvements.” (Ref. 1)
Environmental education project in the Green Play City
The "Green Play City", a nature experience park on 4,500 sqm exists since 1999. Initiated and administered by the non-profit organization "Wissenschaftsladen" (short WiLa), it combines nature experience and recreation for kids and grown-ups with education about the environment and nature-based design while also serving as a place for social interactions through intercultural events (3,4). The initiative "Raus aus'm Haus" aims at expanding the educational and participatory component of the Green Play City. By closely collaborating with schools and kindergartens on options for related on-site workshops, project days or open-air classrooms will be explored and conceptualized (1).
Bryggervej
Collaboration between the City of Aarhus and private property developer DOMIS Ejendomme has been recognised by the award of a silver certificate for sustainable urban planning for the Bryggervej project. The aim of the project is to try out various sustainability principles. Green and blue solutions are included in the project, e.g. green roofs, green facades, green open spaces and blue elements/water in the park areas to increase recreational values and add moisture to the dry urban air. (Ref. 1, 2, 3)
By 2020, the first residential project was built called Risskov Brynet (Ref 8). Information in the project since 2017 is about this project. The project is certified according to DGNB Gold because it is based on a high standard for both social, economic, and environmental sustainability. An important part of this project is a 'highly insulated climate screen', a technology of the project that is incorporated into the project to address climate change (Ref 8, 9, 10).
By 2020, the first residential project was built called Risskov Brynet (Ref 8). Information in the project since 2017 is about this project. The project is certified according to DGNB Gold because it is based on a high standard for both social, economic, and environmental sustainability. An important part of this project is a 'highly insulated climate screen', a technology of the project that is incorporated into the project to address climate change (Ref 8, 9, 10).
Swimming pool on the Odra river - swim in the river!
The project aims to create a floating swimming pool on the Odra river, similar to a floating pool in Berlin. The pool would serve as a meeting place and the recreational area, but also as an impressive architectural and floating artwork. The pool would consist of three modules: a relaxation zone; filter module, composed of suitable plants responsible for clearing water straight from the river; and the pool/swimming area, filled with filtered water from the river. The pool should be mobile - made in such a way that by conventional means it could move within the urban waterfront [1].
Afforestation in the City of Aarhus
The City Council has passed an ambitious woodland plan designed to protect the municipality's groundwater.By planting woods in vulnerable areas where boreholes have been drilled for drinking water, the use of pesticides or other pollutants in the immediate area can be avoided. Aarhus residents will be ensured clean drinking water in 20 years even though the population is rising.(Ref. 2) New woodlands west of Aarhus will be a magnet for lovers of the open air, and secure clean drinking water for the city's population.(Ref. 1)
The National Park of Athens
A restructuring of the National Park of Athens is being done from the last few years to revitalize one of the tourists' attractions in the city. The restructuring is mainly focused on the conservation of animal species found in the park. The project also aims to transform the park into a meeting point for culture and sports as well as activities including workshops, yoga, pilates, music, theater, tours and educational games for kids (Ref 7). The park contains a duck pond and a small zoo. In addition to this, it opened a botanical museum and a library for children for educational purposes (Ref 1,2,3). The project was planned to carry out in two stages. In the first stage, Athens will tender a 2.9 million euros upgrade of the infrastructures, and a study that is budgeted at 370,000 euros for the restoration of the Garden’s zoological park, botanical museum, the famed Roman mosaic area, and restoration of the Herod Atticus wall. The second stage concerns restoration of the Garden’s flora and removal of damaged shrubbery (Ref 6).
Renovation of Jarun Sports Recreational Centre
The intervention included the renovation of lake Jarun and its surrounded park and recreational centre. Efforts were made to improve the amenities at the lake and park in order to bring it closer to the citizens, particularly to disadvantaged groups. It provides facilities for walking, bicycling, various outdoor sports, trim-track of 6500 meters of length, roller skating, etc. Sports facilities are related to an impressive 2250 meters long regatta path where international and world rowing, canoe and kayak contests are held. With daily training and performances, they give Jarun a special, sporting atmosphere (Ref 1, 2, 3, 4).
Restoration of the Lake Rusalka
Lake Rusalka is one of the key elements of Kasprowicz Park, which is a popular recreational area in Szczecin. The shoreline between the Summer Theater and the Japanese Bridge is an attractive stroll. The project aims to improve the functionality, attractiveness and aesthetic value of the coastline and an island on the lake. It envisions going back to the historical tradition of the boats rental as well as includes plans for the revitalization of the part of the shoreline, creation of the Japanese gazebo on the island and construction of mooring berth [1]. In 2020, the project was still on the waiting list in the city’s participatory budget distribution. Local authorities expect its implementation to take place by 2022, the earliest [6].
Aarhus River Project
The project was about restoration of the Aarhus river. The river was piped during the 1930s for hygienic reasons and to give space for road infrastructure. In 1989, the city decided to resurface the river. The river acts as a green and blue corridor running through the city centre. Furthermore, The City Council approved a plan for the recreational vision of the Aarhus River and e.g. flood prevention measures have been taken. (Ref. 1, 2, 3) The Aarhus Å project was completed in the years from 2006 to 2013. (Ref. 15)
Boathouse in Podjuchy by the Regalica river
The initiative aims to ensure open access to the river Regalica for the local community and to create a multifunctional recreational area there. Given current spatial development plans, the chosen location is the only feasible solution to facilitate public access to the river. The project will address multiple NBS domains as its plans include: building new water stand, fishing place, and an observation deck, developing an ecological and educational path along the riverside, developing recreational spaces for the community including outdoor and cultural activities. The project relates to the long-term brand strategy of the city: ‘Szczecin floating garden 2050’[1]. The architectural plan was accepted and put forward for the implementation in 2019; currently, in July 2020, the project is still in the planning phase [4].

