Displaying 641 - 650 of 764

Lower Ouseburn Valley Redevelopment: The Malings

Carillion-igloo, a joint venture company formed between The igloo Regeneration Partnership and Carillion plc was selected by Newcastle City Council and the Homes and Communities Agency to work in partnership with them in the redevelopment of a number of sites in the Lower Ouseburn Valley, Newcastle.
The regeneration project has been carried out in line with the sustainable investment policy of Igloo and consists of 5 phases. Phase 1: The Mailings focused on the transformation of a former industrial brownfield into a vibrant residential area on the banks of the Ouseburn promoting sustainable, low-energy living, flood protection and community building. These objectives were achieved by green areas creation, sustainable drainage system application and unique urban planning measures. (2, 15)

The River's Purification

In their application for funds from the city’s participatory budget, the citizens introduced the cleaning of the river Glowna (riverbed and riverbank) in Poznan along the entire length of the river within the city area (excluding private and inaccessible areas). The initiative aimed to clean the stream and to increase the attractiveness of the riverside. The action was implemented with the voluntary help of the residents as a way of promoting ecological behaviours [1].

Inspiring Water Action in Torne (IWAIT)

46.5 hectares of nationally-important habitat was restored in Doncaster as part of an Environment Agency-led project benefiting communities and wildlife. The work across seven woodland areas was designed to help improve water quality, reduce flood risk, and enhance natural habitats for protected species. By providing additional flood storage the project is able to help attenuate both peak and flood flow from rainfall events, reducing flood risk and damage and reducing the financial and carbon cost of pumping water from the Torne catchment. Although this project extended beyond Doncaster, Sandall Beat in Doncaster was part of the key sites (Ref 1).

Frankfurt Green Belt Regeneration

The Green Belt in Frankfurt am Main spans in the inner area of the city and covers almost a third of the city's wider area which is around 80 square kilometres, around half of which is the city forest (6). In 1991, as stated in the city council's Green Belt Constitution, the Belt has been declared a protected open space while it also outlined the long term goal of securing and developing it (1). The green belt with its landscapes, excursion destinations and the large network of paths is important for the quality of life in Frankfurt and at the same time offers a place of retreat for plants and animals. It is essential for a good urban climate (1).

Eco-district Desjoyaux

The Desjoyaux ZAC in the Crêt-de-Roc district, was created in 2005. Since then, this three-and-a-half-hectare site, which is involved in the process of receiving the "eco-district" national label certification since 2015, has metamorphosed (Ref. 1). Some works aim to renew and embellish the public spaces located near the residences of the street and the impasse Desjoyaux to preserve biodiversity in the city center of Saint Etienne and for the well-being of citizens. (Ref. 1, 2 and 3). Community gardens, park, ephemeral gardens, swales and sustainable water filtration system are being developed in this project (Ref. 1, 2 and 3).

The Nesttun Watercourse

The restoration of the Nesttun watercourse was made in order to secure the watercourse’s surroundings against damaging floods and to develop its urban qualities as a blue/green structure traversing this part of the city. The City of Bergen has exploited possibilities in flood control measures to develop the watercourse’s natural qualities and improve accessibility. A number of measures were completed in order to give the watercourse a positive ecological status and make it into an attractive recreation corridor, learning arena and secure ‘blue-green’ urban structure. (Ref 1, 2)

Brunton Park Flood Alleviation Scheme

The Brunton Park residential area in the northern part of Newcastle had a history of flooding as a result of urban growth in the local area and developments in the upper parts of the Ouseburn catchment. A total of 62 properties were at risk of sewer flooding whilst 74 properties were located within a flood zone. In 2014, the collaboration of the Northumbria Water, the Environmental Agency and the Newcastle City Council created the Brunton Park Flood Alleviation Scheme with the strategic objective to reduce the potential for flooding of adjacent properties from surface water and the Ouseburn, whilst also developing a sustainable, self-maintaining channel which supports environmental, social and economic purposes at the same time. (12)

The project included physical measures of embankment building, diverting part of the Ouseburn river, installation of sewage storing tank, and creating new water-dependent habitat (12)

Granja horticultural park

In 2007 the Lisboa City Hall began the development of a strategy for urban agriculture, having created in 2011 several allotment parks. Beyond the provision of plots, the Council also provided the fences, shelters for storage, water irrigation, training and technical support. In 2011 there were already 56 plots of 150 m2 at a location named Granja Farm (2)

Green and Blue Corridors Enhancement Plan

"On June 1st 2017, Saint-Etienne Métropole officially committed itself to the implementation of measures to promote the circulation of wildlife between the different green spaces with important biodiversity in its territory" (Ref. 3). "Saint-Etienne Métropole has signed with 13 partners a new contract called "green and blue". It is a new blue and green framework for the whole territory, a regulatory tool for the protection of biodiversity" (Ref. 2). "It aims to continue and reinforce the actions already undertaken with a transversal and urban dimension" (Ref. 2).

Ouseburn River Restoration Project

The nonprofit organisation of Groundwork North East & Cumbria is working with partners from across the region to protect and preserve the upper part of the Ouseburn River. The Ouseburn River Restoration Project includes several physical measures and a number of enhancements to the river and the surrounding environment to slow the flow of the river, restore its ecosystem and improve water quality. The Project also works with farmers and landowners about how to manage fertiliser and sediment runoff, thus decreasing water contamination. The project will improve in-river and bankside habitats and provide with more water monitoring data and analysis.” (1)