Montreynaud Park in the new district urban planning
The Montreynaud Park is composed of a great diversity of spaces (dense woodlands, undergrowth, meadow spaces, small group of trees ) and presents a richness of fauna and flora. The challenge of rebuilding this area is to create a real urban park, a green lung that provides the junction between the upper and lower parts of the neighborhood and links it to the rest of the city. The redevelopment of the park must meet the needs of the inhabitants by developing a place of contemplation, pedestrian paths, sports and recreational paths, and in connection with scientific, technical and industrial culture (Ref.1).
Riverbanks restoration of Janon River
This intervention is about the restoration of the riverbanks of the Janon River along a street in the Terrenoire District of Saint Etienne. This area was abandoned for more than 10 years, without maintenance and cleaning. Therefore, this intervention was mandatory for clean up to avoid flood as well as bringing back vegetation and offering some quality walking areas for citizens (Ref. 1).
Monsanto green corridor
In 2012, the City of Lisbon has implemented a 2,5 km green corridor connecting Monsanto Forest Park ( 900ha) and the city centre through Eduardo VII Park. (1) It is a concept of continuous natural structure, consisting of a coordinated set of green spaces that intend to continuously bring the natural space to the interior of the city (ref.3)
This corridor is a fundamental part of the Ecological Structure, a matrix formed and articulated by systems: the Mobility System, the Water and Air Circulation System, the Fluvial-Estuarine Transition System and the Structural Ecological Units System.
This corridor is a fundamental part of the Ecological Structure, a matrix formed and articulated by systems: the Mobility System, the Water and Air Circulation System, the Fluvial-Estuarine Transition System and the Structural Ecological Units System.
Lisbon Biodiversity Route
Lisbon's Biodiversity Route is a pedestrian route of 14 km, marked according to the norms of the Portuguese Federation of Camping and Mountaineering. It connects the Forest Park of Monsanto to the Tejo river, which aims to contribute to raising the awareness of the value of the city's biodiversity (ref. 4). The position and dimension of these connected areas important in relation to the climate regulation, air quality and for the diversity of habitats that the city offers. The Biodiversity Route is a circular route, which can be done on foot or by bicycle where each species of fauna and flora that can be observed (Ref.1).
Blackburn Meadows Wastewater Treatment Plant Upgrade
Blackburn Meadows Wastewater Treatment Plant (WWTP) has a mesophilic anaerobic digestion facility, which enables the recycled sludge to be used on neighbouring farmlands as manure. It also enables the generation of renewable energy using combined heat and power units. All the upgrade works were to improve the quality of effluent being discharged into the River Don (ref 3). Sheffield City Council and Yorkshire Water leased an unused part of the former sewage works, to turn into a nature reserve which provides habitat for migrating birds. A water meadow created on vacant land promotes ecological biodiversity and floodwater attenuation (Ref5). In 2013, the works handle a dry weather flow of more than 158,000 cu m of sewage per day, with the treated effluent pumped into the river. It is one of Yorkshire Water’s biggest assets, but with a projected dry weather flow set to hit 368,000 cu m per day by 2025, it is in need of an upgrade (ref 6). The project is fragmented into two phases as the 1st phase was completed in 2013 and the 2nd phase will be completed by 2021 (ref 3).
Sheffield University Green Roofs
The University of Sheffield has embraced green roof technology for its benefits to the built environment, and to support Sheffield City Council vision of Sheffield as the UK’s green roof capital. Most buildings the University feature intentionally vegetated green roofs and some existing buildings with suitable structures have been retrofitted with green roofs (ref 1). The first instrumented test plot for the green roof was installed on the Mappin Building roof. In 2009, Jessop West building and the Robert Hadfield – Green Roof Centre Demonstration Site are studied for replicating the model (ref 4).
Climate adaptation in Risvangen
“Cooperation between, residents, businesses and the local authority to facilitate the adaptation of a large urban area in Aarhus for more rainfall in the future. They will be able to influence urban development in the direction of more attractive use of rainwater. Local Rainwater Drainage (LRD) is a current trend derived from the political desire to deal with some of the expected increase in extreme rainfall by collecting and using it for recreational purposes. Society will thus be able to adapt to climate change better whilst providing more recreational facilities and environmental improvements.” (Ref. 1)
Environmental education project in the Green Play City
The "Green Play City", a nature experience park on 4,500 sqm exists since 1999. Initiated and administered by the non-profit organization "Wissenschaftsladen" (short WiLa), it combines nature experience and recreation for kids and grown-ups with education about the environment and nature-based design while also serving as a place for social interactions through intercultural events (3,4). The initiative "Raus aus'm Haus" aims at expanding the educational and participatory component of the Green Play City. By closely collaborating with schools and kindergartens on options for related on-site workshops, project days or open-air classrooms will be explored and conceptualized (1).
Hellenikon Metropolitan Park
Hellenikon Metropolitan Park will be a large urban park located in Hellinikon, Athens, Greece. The park will be the central attraction of the Hellinikon project. It will provide Athens with a much needed ecological boost. When finished the park will be the largest in Europe. It will be approximately 200 hectares spanning the site of the former Hellenikon International Airport (Ref 4). The project will follow an integrated approach to sustainability. The objective is to boost greenery and create high-quality spaces while minimizing the natural resources used, protecting and enhancing the ecosystems in the region, and also raising awareness and educating the public on sustainability issues (Ref 1). Initially, the project was planned to start in 2008 and to be completed by 2013, but with the unfortunate and unseeing financial crisis worldwide, was shelved. A part of the project has been completed in the first 5 years. In 2013, a new design strategy for the project was submitted as part of The Hellinikon Project. The team included Foster & Partners, Charles Anderson Landscape Architecture, ARUP and a group of Greek design consultants. The design was revised and resubmitted to the Greek government in 2018 (Ref 3). The project is now under the consideration of the Greek Ministry of Culture for infrastructure and monuments (Ref 1).
Natural Swimming Pool Brackwede
The Brackwede open-air pools have been a significant landmark of the city of Bielefeld and part of locals' life since 1926. After several renovations since its opening, in 2005, the maintaining company of the Brackwede open-air pools proposed to convert the pools into natural-water bodies through the application of natural water filtration systems. The pools are supplied from the natural underground stream of Ems-Lutter whose spring water is physically and biologically purified by natural mineral soil filter and water plants. Chlorine is prohibited in this pool - the nature itself ensures water quality (1). Since 2009, the Natural pool of Brackwede offers natural facilities for swimming and other water-related activities besides cultural, sport and recreational opportunities for all (1).

