Riverbanks restoration of Janon River
This intervention is about the restoration of the riverbanks of the Janon River along a street in the Terrenoire District of Saint Etienne. This area was abandoned for more than 10 years, without maintenance and cleaning. Therefore, this intervention was mandatory for clean up to avoid flood as well as bringing back vegetation and offering some quality walking areas for citizens (Ref. 1).
The Green Wedge and the Green Citizen Initiative
There are various projects under the Den Grønne Kile initiative or the Green Wedge. The Green Wedge passes through all 4 subdivisions of the new district Aarhus K, and has a building percentage of 25% within the boundaries of the "wedge". (Ref. 3) Citizens are invited to contribute with green projects through the municipal innovation project "Green Citizen" (Grøn Medborger). (Ref. 1) The first and most prominent is a park created by citizens on an old railway track. The park has the nickname 'Kilen' and is a new city park for everyone, including upcoming residents and companies in the new district 'Aarhus K'. The park helps to promote the creative energy in the area and is in line with the development of the new district; it differs from the other city parks in Aarhus by offering space for many different activities and temporary projects that give life to 'Kilen' and make the trip along the railway track an exciting experience. (Ref. 1)
Lisbon Biodiversity Route
Lisbon's Biodiversity Route is a pedestrian route of 14 km, marked according to the norms of the Portuguese Federation of Camping and Mountaineering. It connects the Forest Park of Monsanto to the Tejo river, which aims to contribute to raising the awareness of the value of the city's biodiversity (ref. 4). The position and dimension of these connected areas important in relation to the climate regulation, air quality and for the diversity of habitats that the city offers. The Biodiversity Route is a circular route, which can be done on foot or by bicycle where each species of fauna and flora that can be observed (Ref.1).
MOL: sustainable infrastructure
The petrol station is a result of a long-term project of MOL, called as the “The petrol station of the future”. The designers created a building with excellent thermal insulation, green walls, a green roof, solar panels, rainwater utilization and an alternative heating system. Even the interior of the building was created with as much environmentally friendly materials as possible. The building uses LED lighting only to save energy. These environmental efforts resulted in Energy savings of more than 50 percent, and the neutralization of 10 tons of CO2 gas emissions. (Reference 1)
Blackburn Meadows Wastewater Treatment Plant Upgrade
Blackburn Meadows Wastewater Treatment Plant (WWTP) has a mesophilic anaerobic digestion facility, which enables the recycled sludge to be used on neighbouring farmlands as manure. It also enables the generation of renewable energy using combined heat and power units. All the upgrade works were to improve the quality of effluent being discharged into the River Don (ref 3). Sheffield City Council and Yorkshire Water leased an unused part of the former sewage works, to turn into a nature reserve which provides habitat for migrating birds. A water meadow created on vacant land promotes ecological biodiversity and floodwater attenuation (Ref5). In 2013, the works handle a dry weather flow of more than 158,000 cu m of sewage per day, with the treated effluent pumped into the river. It is one of Yorkshire Water’s biggest assets, but with a projected dry weather flow set to hit 368,000 cu m per day by 2025, it is in need of an upgrade (ref 6). The project is fragmented into two phases as the 1st phase was completed in 2013 and the 2nd phase will be completed by 2021 (ref 3).
Sheffield University Green Roofs
The University of Sheffield has embraced green roof technology for its benefits to the built environment, and to support Sheffield City Council vision of Sheffield as the UK’s green roof capital. Most buildings the University feature intentionally vegetated green roofs and some existing buildings with suitable structures have been retrofitted with green roofs (ref 1). The first instrumented test plot for the green roof was installed on the Mappin Building roof. In 2009, Jessop West building and the Robert Hadfield – Green Roof Centre Demonstration Site are studied for replicating the model (ref 4).
SPARK project
The areas around MarselisborgCenter in Aarhus get a new and better life. The project will contribute to the world's first city park that handles excess rainwater and invites citizens to health-promoting lifestyles. The area around MarselisborgCenter will be converted into a public city park for both MarselisborgCenter's users (people in rehabilitation) and the citizens of Aarhus in general. At the same time, the area will make the city more robust to future heavy rainfall. (Ref. 1)
The purpose of SPARK is to create a new, vibrant urban space in and around the Marselisborg Center, which partly meets the need for outdoor rehabilitation activities for the center's users, and partly the need for a fully-fledged climate adaptation effort in the area. These needs are united by the construction of a new public park, which also has the potential to increase social inclusion by creating meetings between the users of the Marselisborg Center and the many residents in the district. (Ref. 6)
The purpose of SPARK is to create a new, vibrant urban space in and around the Marselisborg Center, which partly meets the need for outdoor rehabilitation activities for the center's users, and partly the need for a fully-fledged climate adaptation effort in the area. These needs are united by the construction of a new public park, which also has the potential to increase social inclusion by creating meetings between the users of the Marselisborg Center and the many residents in the district. (Ref. 6)
Climate adaptation in Risvangen
“Cooperation between, residents, businesses and the local authority to facilitate the adaptation of a large urban area in Aarhus for more rainfall in the future. They will be able to influence urban development in the direction of more attractive use of rainwater. Local Rainwater Drainage (LRD) is a current trend derived from the political desire to deal with some of the expected increase in extreme rainfall by collecting and using it for recreational purposes. Society will thus be able to adapt to climate change better whilst providing more recreational facilities and environmental improvements.” (Ref. 1)
Bryggervej
Collaboration between the City of Aarhus and private property developer DOMIS Ejendomme has been recognised by the award of a silver certificate for sustainable urban planning for the Bryggervej project. The aim of the project is to try out various sustainability principles. Green and blue solutions are included in the project, e.g. green roofs, green facades, green open spaces and blue elements/water in the park areas to increase recreational values and add moisture to the dry urban air. (Ref. 1, 2, 3)
By 2020, the first residential project was built called Risskov Brynet (Ref 8). Information in the project since 2017 is about this project. The project is certified according to DGNB Gold because it is based on a high standard for both social, economic, and environmental sustainability. An important part of this project is a 'highly insulated climate screen', a technology of the project that is incorporated into the project to address climate change (Ref 8, 9, 10).
By 2020, the first residential project was built called Risskov Brynet (Ref 8). Information in the project since 2017 is about this project. The project is certified according to DGNB Gold because it is based on a high standard for both social, economic, and environmental sustainability. An important part of this project is a 'highly insulated climate screen', a technology of the project that is incorporated into the project to address climate change (Ref 8, 9, 10).
Natural Swimming Pool Brackwede
The Brackwede open-air pools have been a significant landmark of the city of Bielefeld and part of locals' life since 1926. After several renovations since its opening, in 2005, the maintaining company of the Brackwede open-air pools proposed to convert the pools into natural-water bodies through the application of natural water filtration systems. The pools are supplied from the natural underground stream of Ems-Lutter whose spring water is physically and biologically purified by natural mineral soil filter and water plants. Chlorine is prohibited in this pool - the nature itself ensures water quality (1). Since 2009, the Natural pool of Brackwede offers natural facilities for swimming and other water-related activities besides cultural, sport and recreational opportunities for all (1).

