Zagreb for me
“Zagreb for Me” was an ambitious and comprehensive project launched in 2015 by the Zagreb Society of
Architects in cooperation with the Faculty of Architecture at the University of Zagreb and the City of Zagreb.
The goal of the project was to start a revitalization of public spaces through the realization of 17 urban
interventions in the whole city area at the same time. This distributed approach aimed to improve the general
“image of the city” and raise the quality of urban life in segments of housing, recreation, leisure and social
cohesion and revitalization of Zagreb's public spaces using public participation as a tool. This project aims to decentralize designed public spaces and draw attention to some forgotten city spots. At the same time, the project, created from a “bottom-up” initiative, establishes a new model of public participation as well as new forms of collaboration (Ref 1, 2, 3). The project "Zagreb for me" was created on the basis of Acupuncture of the city - an interdisciplinary approach and public participation, but it covers a wider urban space, ie it deals with public spaces throughout Zagreb. After the conducted urban-architectural tenders for the selected solutions, the realization is planned. Only one urban-architectural tender was conducted and the implementation of the project stopped there, but the project "Zagreb for me" was recognized as an example of good practice with the possibility of application in other cities. (Ref 5)
Architects in cooperation with the Faculty of Architecture at the University of Zagreb and the City of Zagreb.
The goal of the project was to start a revitalization of public spaces through the realization of 17 urban
interventions in the whole city area at the same time. This distributed approach aimed to improve the general
“image of the city” and raise the quality of urban life in segments of housing, recreation, leisure and social
cohesion and revitalization of Zagreb's public spaces using public participation as a tool. This project aims to decentralize designed public spaces and draw attention to some forgotten city spots. At the same time, the project, created from a “bottom-up” initiative, establishes a new model of public participation as well as new forms of collaboration (Ref 1, 2, 3). The project "Zagreb for me" was created on the basis of Acupuncture of the city - an interdisciplinary approach and public participation, but it covers a wider urban space, ie it deals with public spaces throughout Zagreb. After the conducted urban-architectural tenders for the selected solutions, the realization is planned. Only one urban-architectural tender was conducted and the implementation of the project stopped there, but the project "Zagreb for me" was recognized as an example of good practice with the possibility of application in other cities. (Ref 5)
Riverbanks restoration of Janon River
This intervention is about the restoration of the riverbanks of the Janon River along a street in the Terrenoire District of Saint Etienne. This area was abandoned for more than 10 years, without maintenance and cleaning. Therefore, this intervention was mandatory for clean up to avoid flood as well as bringing back vegetation and offering some quality walking areas for citizens (Ref. 1).
SPARK project
The areas around MarselisborgCenter in Aarhus get a new and better life. The project will contribute to the world's first city park that handles excess rainwater and invites citizens to health-promoting lifestyles. The area around MarselisborgCenter will be converted into a public city park for both MarselisborgCenter's users (people in rehabilitation) and the citizens of Aarhus in general. At the same time, the area will make the city more robust to future heavy rainfall. (Ref. 1)
The purpose of SPARK is to create a new, vibrant urban space in and around the Marselisborg Center, which partly meets the need for outdoor rehabilitation activities for the center's users, and partly the need for a fully-fledged climate adaptation effort in the area. These needs are united by the construction of a new public park, which also has the potential to increase social inclusion by creating meetings between the users of the Marselisborg Center and the many residents in the district. (Ref. 6)
The purpose of SPARK is to create a new, vibrant urban space in and around the Marselisborg Center, which partly meets the need for outdoor rehabilitation activities for the center's users, and partly the need for a fully-fledged climate adaptation effort in the area. These needs are united by the construction of a new public park, which also has the potential to increase social inclusion by creating meetings between the users of the Marselisborg Center and the many residents in the district. (Ref. 6)
The Diomidous Botanical Garden in Athens
The botanical garden of Athens was reconstructed in 2004 to protect and maintain the biodiversity of the area. Covering a land of 1,860 sq.m., this Botanical Garden hosts over 2,500 different kinds of plants from all over the world and a rich variety of flora. All the plants and trees are protected in the park. The community also sends seeds all over the country to spread and maintain biodiversity throughout the region and hold agroecological events to increase the concern and educate the locals (Ref 1,3). The park also has a lake and a library inside it. (Ref 2)
Renovation of Jarun Sports Recreational Centre
The intervention included the renovation of lake Jarun and its surrounded park and recreational centre. Efforts were made to improve the amenities at the lake and park in order to bring it closer to the citizens, particularly to disadvantaged groups. It provides facilities for walking, bicycling, various outdoor sports, trim-track of 6500 meters of length, roller skating, etc. Sports facilities are related to an impressive 2250 meters long regatta path where international and world rowing, canoe and kayak contests are held. With daily training and performances, they give Jarun a special, sporting atmosphere (Ref 1, 2, 3, 4).
Green Bridge On Highway D2
The Green Bridge at the D2 motorway in Moravian Svätý Ján (Dúbrava locality) is a project under the Alpine Carpathian Corridor Project (ERDF). The project deals with biodiversity and is focused on building a safe and efficient passage for migrating animals over the D2 motorway connecting Bratislava and Brno (Czech Republic). The mountain ranges of the Alps and the Carpathians, which straddle the border of Austria and Slovakia, are the largest sources of biodiversity in Central Europe. The Corridor’s structure has created a forum for the managers of these regions to share ideas and develop solutions that can be applied within the entire region, instead of only per protected area. To ensure long-term continuity, key stakeholders are party to a Memorandum of Understanding that can contribute to sustainability in their area of responsibility. (1, 5, 6)
Abandoned areas: management strategy
In 2009, the city of Montpellier launched a large census project to valorize its abandoned areas. The study gives guidance on the management of abandoned areas in Montpellier, particularly in connection with environmental education and awareness objectives (Ref. 2). The strategy aims to preserve and promote the natural heritage of Montpellier; promote wastelands as reservoirs of biodiversity, tools for connecting natural spaces; protect and enhance the great green flows accompanying watercourses (biological links and privileged sites for fauna and flora); and develop a network of soft transport throughout the city based on the green network (rivers, agricultural, natural and park areas) (Ref. 4). "The spaces have been classified according to their context, their origin, their potential. This sometimes subjective typology presents a classification of the wasteland and makes it possible to take a particular look on each land. Surfaces of all shapes and sizes fall within this operational classification." Four Experimental projects include: Zenith Friche, Promenade of the Lironde, Pastourelle, Combemale" (Source: uploaded document).
Le Lez River
"The Lez is a small Mediterranean river 28.5 km long, born from a karstic exurgence whose supply zone extends north of the source, over more than 150 km2. The “Le Lez” site was proposed in February 2001 because of the presence of several species and natural habitats protected at European level. The designated part concerns the upstream course of the Lez river, its riparian forest and associated agricultural environments. Covering an area of 144 hectares, the area stretches over 14 km from the Lez sources in Saint-Clément-de-Rivière to the Concorde bridge, in the town of Montpellier" (Ref. 4). Strong economic and demographic development near Le Lez implies urban pressure on peripheral sectors, particularly north of Montpellier where many residential areas are developing. The river became protected thanks to the "Natura 2000 European network" which aims to reconcile human activities and the conservation of biodiversity on the basis of the main principles of sustainable development (Ref. 4).
Agriparc of Mas Nouguier
The agriparc of the Mas Nouguier is an agricultural reserve entirely maintained by the city of Montpellier. Conducted in organic agriculture, the estate contributes to the preservation of the identity of the territory and to the valorization of the living environment. Accessible to all, it offers a beautiful walk in the middle of the vineyards. Apiaries are used to develop educational workshops and to collect honey with school children. Olive trees, centennial pines and a large meadow come to embellish this little bit of countryside in town (Ref. 1).
Green Spotted Toad programme
Sweden's second largest population of the acutely threatened Green Spotted Toad ("Bufotes viridis") populates in the Northern harbour (Norra hamnen) in Malmö. In 2014 when inventories were carried out, it was shown that four water areas were used for reproduction. Despite a major exploitation interest, city administrations and landowners, together with the County Administrative Board (Länsstyrelsen Skåne), agreed to protect the population and to take measures to maintain its status (ref. 1, 2). A 15.5 hectare area had been protected until further notice from continued land changes and other disturbing activities, and the area had been fenced (ref. 1).

