A Million of Corals for Colombia

The "Un Millón de Corales por Colombia" project is a national initiative aimed at the restoration and conservation of coral reefs across Colombia. Initiated in 2021, this ambitious project seeks to rehabilitate 200 hectares of coral reef by planting one million coral fragments across seven departments in Colombia, spanning both the Caribbean and Pacific regions​ (ref 1,2). It was developed as a response to the significant degradation of coral reefs caused by climate change, coastal development, overfishing, and pollution. These factors have led to the loss of about 80% of coral reefs in the Caribbean region.
The initiative, led by the Colombian government in partnership with organizations such as Conservación Internacional, Parques Nacionales Naturales, Corales de Paz, and several regional environmental authorities, focuses on restoring this vital ecosystem (ref 2). The project encompasses constructing and maintaining coral nurseries and training local community members, including fishermen, as "coral gardeners." These gardeners are taught scientifically proven coral restoration techniques, including microfragmentation and larval rearing methods. A key aspect of the project involves continuous education and involvement of the community and stakeholders to ensure long-term sustainability (ref 4, 5). In Cartagena, the project plays a vital role in the restoration and conservation of coral reefs in this region, which is a key site for the initiative (ref 4).

The Three Mile Creek Hydrological Restoration

The Three Mile Creek Hydrological Restoration project is taking place in one historic channel of the Three Mile Creek, located east of Dr. Martin Luther King, Jr. Avenue, and covering approximately 1,800 linear feet (Ref 3). This project, led by the City of Mobile, aims to remove sediment from the stream channel. This segment of the Creek was bypassed with a straight channel in the early 1980s to control flooding in the area, thus accelerating the accumulation of sediments in the historic channel (Ref 1).
The project's goal is to restore and maintain the natural flow to the historic channel and create a connection to the City and County's Blueway initiatives (Ref 3). This will improve habitat conditions and water quality and help to protect the area’s estuarine and marine water resources (Ref 8). It will also contribute to revitalizing the Three Mile Creek Watershed and provide increased recreational opportunities for citizens, like kayaking and canoeing (Ref 6). Construction work occurred in 2022 and 2023 (Ref 3).
The Three Mile Creek Hydrological Restoration is a key component of the Mobile Bay Shore Habitat Conservation and Acquisition Initiative, which focuses on acquiring, restoring, and preserving habitats, including riparian, wetland, and upland areas that support various fish and wildlife species affected by the environmental disasters of the Deepwater Horizon oil spill that occurred in 2010 (Ref 1). The project spans three critical areas: 450 acres within the Three Mile Creek Watershed (as detailed in this project profile), 300 acres in the Dog River Watershed, and 40 acres of bay shore property in the Garrows Bend Watershed (with the latter two areas being part of separate initiatives) (Ref 4).

Urban regeneration of Depou CTP

The last large-scale park in Iași was opened in 1923, and since then, the city has lacked any significant new green spaces. With the European Union recommending at least 26 square meters of green space per resident and the city's increasing urban density, the need for a new park is undeniable.
To address this, the Municipality of Iași is launching its first major park project in over a century. The project aims to transform the current CTP depot (tram station) into a 4.5-hectare, accessible green space in a densely populated area with strong development potential. This new park is envisioned as a green oasis that will enhance residents' quality of life while promoting environmental sustainability and urban renewal.
The initiative has received widespread public support, with citizens proposing the creation of a local museum to honor the tram station’s historical significance—one of the oldest in the city, with over 100 years of history. A consultation process has been established, involving local residents, NGOs, and a group of experts, including urban planners, architects, and mobility and environment officials, all contributing to the planning stage. Public suggestions for the park include underground parking, recreational and exercise facilities, and a diverse range of vegetation. Ensuring accessibility for all citizens and visitors is also a key priority in the park's design.
The municipality has allocated 300,000 euros for a solutions contest to finalize the approach to redeveloping the tram station. (1, 2, 3, 4, 5, 8, 9)

Green belt on the border

The municipality of Ciudad Juarez, in collaboration with UN-Habitat, has drafted a redevelopment strategy for an area known as "Paso de Oñate." This intervention falls within the broader framework of "Vision Ciudad Juarez 2040." The plan involves constructing a forested green belt along the southern edge of the Rio Grande (/Bravo) in the northwest part of Juarez, bordering the USA.
Currently in the planning stage, the project aims to restore the ecological function of various degraded areas along the Rio Grande, transforming them into a continuous, green, walkable, and recreational space. The strategy includes allowing vegetation to recover, introducing native plant species, and increasing tree cover to rehabilitate unmaintained parks, derelict areas, and degraded riverbanks. These areas will be equipped with new features and integrated with existing parks, schools, and playgrounds. The envisioned green corridor will enhance walking conditions, improve the perception of safety, offer recreational opportunities for all age groups, and deliver valuable ecosystem services such as temperature regulation, improved air quality, and water retention.
In addition to its ecological goals, the project has a historical and geographical dimension. It aims to incorporate cultural heritage elements, such as the monument of the New Citizen, Paso de Oñate, Turtles Park, and the beginning of the Acequia Madre. It will also connect with other green space initiatives, including the Mega Park "El Chamizal" and the "Corredor Cultural," which runs through the city center.
This intervention is being prioritized due to the area's ongoing social and ecological decline. Paso de Oñate is a critical border crossing point, which negatively affects mobility and air quality. The area also suffers from a high concentration of vacant housing, which contributes to the residents' perception of insecurity. (Ref. 1, 2, 3, 4)

Blue Pearls for Berlin

Berlin has faced severe water shortages in recent years, with ponds, small lakes, and pools suffering significantly. Many have dried out or disappeared, causing habitats for countless animals and plants to vanish. Urbanization exacerbates the issue, as more areas become sealed, preventing rainwater from replenishing soil and water bodies. Recognizing the urgency, Berlin introduced the Eco-Account, a strategic reserve of areas and initiatives to mitigate the effects of urban development on nature and landscapes. Central to this is the Blue Pearls for Berlin program, focusing on revitalizing small water bodies to restore biodiversity and ecological balance.
The project identified approximately 30 ponds, pools, lakes, and ditches from over 100 candidates to be transformed into "blue pearls." These revitalized areas will support local ecosystems and improve Berlin’s water cycle. The Berlin Rainwater Agency, alongside departments responsible for nature, climate protection, and water management, is spearheading the initiative in collaboration with the Berlin Nature Conservation Foundation.
Two pilot sites—the Schleipfuhl/Feldweiher water complex in Marzahn-Hellersdorf and the Lankegrabenteich in Steglitz-Zehlendorf—were prioritized for restoration in 2024. These efforts include improving water quality and creating diverse habitats for wildlife. Enhancing small water bodies not only provides a refuge for animals and plants but also contributes to climate adaptation. Restored ponds and lakes can cool surrounding areas and improve the urban microclimate by utilizing locally accumulated rainwater. Blue Pearls for Berlin, approved by the Senate in 2022, aligns with the city’s Eco-Account framework, ensuring that these restored blue spaces offset ecological damage caused by infrastructure and urban projects. The initiative offers Berliners new ways to experience nature, fostering a balance between development and environmental preservation. (Ref. 1, 2, 4, 6, 7)

D'Olive Watershed Restoration

The D'Olive Creek Restoration project is designed to address the significant environmental challenges facing the D’Olive Creek Watershed and its tributaries (Tiawasee and Joe’s Branch), primarily caused by increased urbanization. Over the last several decades, the area has experienced severe erosion, sedimentation, and habitat degradation due to stormwater runoff from new residential and commercial developments. This runoff has led to stream channel instability, loss of wetlands, and impaired water quality in both D'Olive Creek and Mobile Bay, threatening aquatic and wildlife habitats (Ref 2).
The project involves restoring degraded streams and implementing management measures to reduce the downstream impacts within the watershed. Key activities include stormwater retrofits, stream restorations, and continuous monitoring. These efforts aim to stabilize stream segments and significantly reduce sediment loading into the northeast quadrant of Mobile Bay. This is crucial for improving water quality and clarity, which is necessary for re-establishing submerged aquatic vegetation (SAV) beds that serve as critical nursery areas for shellfish and finfish (Ref 1). By using natural materials like rock and living plants, the project also seeks to create a sustainable and ecologically balanced watershed system (Ref 3).
The anticipated outcomes include enhanced water quality in D'Olive Creek and Mobile Bay, reduced erosion and sedimentation, and the restoration of vital habitats, which will contribute to the region's overall ecological health (Ref 1, 3). This restoration project is part of a broader strategy outlined in the 2002 Comprehensive Conservation Management Plan for the Mobile Bay Estuary (Ref 1).

Eastside Lake Baisha Park

At the beginning of the twenty-first century, Kunming’s urban planning faced major challenges, including fragmented development, environmental degradation, and limited green spaces (Ref 1). In response, the municipal government launched a series of strategic plans aimed at promoting high-quality urban development and environmental restoration.
Baisha Lake was identified as a key area in these strategies, with plans for Baisha Lake Park first highlighted in 2017 (Ref 2) and reaffirmed in the "Opinions on Supporting High-Quality Development in Kunming" in 2021 (Ref 2). To implement parts of this broader strategy, the government entered into public-private partnerships. In 2018, land development rights for parts of East Baisha Lake were granted to Dahua Group, on the condition that 40% of the area be reserved as green space and that ecological restoration efforts be undertaken (Ref 3, 4).
The Eastside Baisha Lake Park project, launched by Dahua Group in February 2023 (Ref 3, 5), is thus one component of this larger government-led urban renewal effort. The project follows the city's planning framework of “one lake, six zones, 46 scenic nodes” and includes 55 hectares of green space, with 40% designated as parkland. By the end of 2023, 6.5 hectares had been completed, and the south bank of the park opened to the public in September 2023 (Ref 3, 6).
The broader East Baisha Lake area's development was originally planned by the state-owned Kunming Urban Construction Company, but land rights were later transferred to Dahua Group. Thus, while a private developer is leading the construction, the project remains a part of Kunming’s publicly driven strategy to restore the lake and enhance urban livability.

Implementation of the Urban Forestry Plan for Cartagena

The Urban Forestry Plan for Cartagena, led by EPA Cartagena, outlines a comprehensive strategy for enhancing the city's green infrastructure. The plan focuses on selecting suitable tree species, planting, and management to achieve several goals: reducing heat through shade, creating microclimates, protecting against climatic events such as coastal erosion and windstorms, enhancing food security, and enhancing the landscape's beauty. Over 10 years, the plan aims to establish at least 100,000 additional trees, increase overall tree cover, enhance accessibility to green spaces, and build a main ecological structure based on natural resources and biodiversity. It also emphasises the importance of local knowledge and resources (ref 1).
Formulated with community input, the plan commenced in 2013 and involved a detailed assessment of existing urban vegetation and climate conditions, utilising tools such as iTree. The development included international conferences and expert consultations to ensure a robust and informed approach (ref 1).

Greening the yards of El Barreal

In the city of Ciudad Juárez, the municipality, in collaboration with UN-Habitat, aims to design and create a park that encompasses the yards and unmaintained areas surrounding the railway station, transforming these spaces into an accessible and safe public area. This project covers over 500,000 square meters and addresses not only degraded areas but also several public squares. Described as "a coordinated urban recycling strategy," this initiative seeks to repurpose existing public squares and rehabilitate neglected spaces into vibrant green areas that feature universal accessibility, native vegetation, and urban furniture designed to enhance safety. The project also aims to provide increased recreational opportunities, improve permeability, and introduce additional shaded areas. A key component of improving permeability involves the restoration and incorporation of acequias—traditional historical irrigation systems that absorb and manage excess rainwater, thereby reducing the likelihood of flash floods.
Additionally, the project focuses on the restoration and promotion of significant historical buildings, such as the old railway station and the whiskey factory, integrating them into a larger cultural and sports facility area at the municipal scale. The overarching goal is to revitalize the site through effective coordination with the relevant authorities responsible for the spaces adjacent to the railway station, stretching from Plaza Misión de Guadalupe to Blvd. Municipio Libre. This collaborative effort aims to accommodate both sports and cultural facilities while also creating a green corridor.
Furthermore, the project intends to reforest, redesign, and enhance Plaza Misión de Guadalupe, Plaza Monumento a Benito Juárez, and other residual public spaces and gardens. This initiative aligns with its Public Space Strategy, which emphasizes the development of gender-inclusive and resilient public spaces.(Ref 1, 3, 4).

Upper Detroit Riverfront Parks Habitat Restoration

The Upper Detroit Riverfront Habitat and Parks Restoration Project aims to restore and enhance vital fish and wildlife habitats along the Detroit River. This initiative seeks to rehabilitate approximately 30 acres of upland and shoreline habitats within Riverfront-Lakewood East Park, A.B. Ford Park, and Mariners Park (all located alongside the river), covering nearly one mile of the Detroit River and its shorelines.
Key outcomes include improving approximately 1,000 linear feet of existing shoreline along the Detroit River by incorporating native wetland edges and fish spawning shelves into the restoration efforts. The project also plans to enhance around 2,000 linear feet of canal shoreline and 800 linear feet along Fox Creek to create or improve habitats for fish and herpetological species. In Riverfront-Lakewood East Park, 28 acres are targeted for the establishment or enhancement of native vegetation to support birds, mammals, and pollinators. If feasible, the creation of about 7 acres of wetlands, along with shallow and deep-water habitats, is also part of the vision.
The project is guided by the City of Detroit's 2017 Parks and Recreation Improvement Plan and represents part of a broader strategy to revitalize the city’s green spaces after years of underfunding. With renewed commitment, the city has allocated nearly $12 million to enhance neighborhood parks, particularly in areas that have lacked investment over the past decade.
However, the project was temporarily halted in 2020 due to high water levels causing flooding in the adjacent neighborhood. As of 2024, it remains on hold while the City of Detroit conducts a flood mitigation study. Despite this delay, the project remains a critical step toward fostering community stewardship and creating sustainable green spaces that improve the quality of life for all Detroit residents.
(Ref. 1, 4, 5)